Top Banner
Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA
41

Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Mar 26, 2015

Download

Documents

Brooke Kilgore
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers

October 2011Jennifer Cowel, RN MHSA

Page 2: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Speaker

Jennifer Cowel, RN MHSA

TJC Experience: Former TJC Hospital Surveyor and former Director of Service Operations in Accreditation in Central Office

Accreditation and regulatory compliance consultant

Vice President and Principal Patton Healthcare Consulting

630-664-8401

[email protected]

Page 3: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Alarm Fatigue & Top ScoredWhat, Me Worry?

• Alarm Fatigue – JC Online Aug 2011• Issue highlighted at TJC Executive Briefings• 4 of the top 5 scored standards were in EC or

LS• In 2011 - LSC days increased• Surveyor Focus on industry trends• Alarms have led to Immediate Threat

Page 4: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

2012 Decision Categories

• PDA

Contingent Accreditation

Accreditation with Follow-up Survey (AFS)

Accredited

Ex: Immed Threat to Life or falsification or fail to clear RFIs after two tries when in CONT

Ex: Failed AFS after 2 tries, or No License, etc

Ex: Too many RFI’sCoPs non compliant.

Ex: Compliant or cleared all RFIs w/ ESC

Perspectives 11/2010

Page 5: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Alarm Fatigue A Growing Problem

• FDA article reports 566 patient deaths between 2005 – 2008, related to alarms

• The numbers are self reported and are likely to be higher

• Twenty-five years ago, few, if any alarms on equipment

• Today – increasing equipment and increase in type & # of alarms

Page 6: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Alarm Fatigue A high-profile Problem

• A patient on cardiac monitor died after V-Fib, dysrhythmia processing turned off

• Perinatal monitor did not audibly alarm fetal distress, only visual, went unnoticed

• A patient stopped breathing but staff just didn’t hear the monitor

Page 7: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

10 Years of TJC Focus

• Sentinel event alert in 2002 focus on clinical ventilator alarms

• Introduced NSPG• Moved clinical alarms to standards ‘05• Participating in fall summit by AAMI, ACCE,

ECRI• Problem continues to grow

Page 8: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

What is Alarm Fatigue?Or Crying Wolf

• Alarm fatigue occurs when clinical personnel fail to respond appropriately to alarms due to inability to understand the critical nature or priority of the alarm. Staff become desensitized after experiencing and handling so many. Alarms are ignored or turned off.

Page 9: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Taking a Good Thing Too Far

• Go beyond the visual/audible alarm, to cell phone, pager alerts, dashboards, nurse call systems

• Beyond the basics – bed alarms, chair alarms, IV, call button, hand sanitizer.

• Study of alarms in critical care units – 900 to 1300 alarms per day, per unit.

• Alarms every 66 seconds

Page 10: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Understanding the Issues

• FDA published results of 216 manufacturer reports on monitor related deaths

• TJC analyzed sentinel events for monitor related causes

Page 11: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Common Causes

• Staff are overwhelmed by the # of alarms• Staff don’t respond or hear alarms• Staff turn-off or turn down alarms• Alarm settings not returned to original setting

after a patient move• Alarm not properly relayed to wireless or

paging system

Page 12: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Common Causes

• Nuisance Alarms reduce sensitivity – As many as 99% of ICU alarms are false, or non-

critical alarms– No routine replacement of batteries, leads to

excessive “low battery” alarms– Put a “ring” on it - The solution to many problems

or RCAs is to add an alarm on it to prevent recurrence.

– Alarms just become back ground noise

Page 13: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Causes – Cont.

• The Sound of the Alarm– Med Equipment companies create their alarm to

fetch attention, the beeping is intended to irritate– Sounds of alarms do not differentiate a

‘notification’ from a critical event.– Sounds are difficult to learn, differentiate which

alarm– Difficulty learning > 6 alarm signals

Page 14: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Causes – Cont.

• Alarm noise contributes to sound level in unit, disrupts sleep and environment of healing

• Users can turn alarms off, change parameters, reduce volume.

• Alarms are not tailored to the individual patient

• Nurses block out noise to focus on task

Page 15: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Concrete Steps to Improving Safety/Effectiveness of Alarms

• How many alarms are tolerable to staff to avoid fatigue? Anesthesiology Today study suggests 2 – 4 per patient/day

• Reduce Thresholds for alarms, use evidence based approach.– Define when a clinician needs to go to bed side

Page 16: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Reducing False Positives

• A Johns Hopkins Study: lower SpO2 alarm from 90& to 88% reduced alarms by more than 50%

• Place delays on alarms, delay alarm by 15 seconds. Journal of Emergency Medicine (JEM) study. Reduced false positives by 80%

• Get to only the alarms staff care about

Page 17: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Improving Safety of AlarmsCont.

• Equipment maintenance – Reduce low battery alerts by replacement– Deactivate or limit overrides– Routine testing of alarms

• Selection of equipment – Vendors with meaningful alarm sounds – Implement intelligent escalation of alerts– Involve staff in equipment selection

Page 18: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Improving Safety of AlarmsCont.

• Alarm Notification Alternatives– Consider central surveillance room with monitor

watchers than notify care givers– Consider alarm integration systems that directs

alarms to devices worn by staff

Page 19: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Improving Safety of AlarmsCont.

• Staff Training– Train staff on meaning of all alarm sounds– Train staff to check patient before silencing any

alarm– Train staff on new equipment – Train staff on proper alarm placement, skin

preparation, ensure competence

Page 20: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Improving Safety of AlarmsCont.

• Develop and implement policies• Who can change alarm settings• Who needs to be monitored• What are default settings• Who is responsible for performing clinical alarm

monitoring rounds

• Develop audit tool to measure compliance with established policies

• Develop and complete check list at shift change for patient alarm settings

Page 21: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Top Scored EC & LS Standards

• Surveyors see these everywhere, low hanging fruit• These are seen by both the LSC surveyor and the

clinical surveyors• Prevent them from seeing these at your organization

and create an impression on day 1

Page 22: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Exits and Cluttered Corridors(LS.02.01.20 -57%)

Hospital maintains means of egress• Easy to find issues, educate on:

– Blocked or locked egress doors– Corridor clutter, storage in hallways

• Linen carts and latex carts will be scored– Exit signs – burned out, enough, proper location, – “No Exit” signs posted

22

Page 23: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Fire Protection Features(LS.02.01.10 - 57%)

Building & fire protection features minimize the effects of fire, smoke and heat.– Fire and smoke doors labeled, correct type, close,

label visible, under cut, door gaps, adhesive tape over latch

– Penetrations are sealed with correct material – IT cables biggest offender. Consider a work permit and inspection

23

Page 24: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Fire Doors, cont

• Inspect and maintain fire doors– Appropriate fire rating on doors

and frame– Door positively latches– Door had a closure– No gaps > 1/8 inch, or undercut

>3/4 inch– Resulted in ITL if multiple problems

Page 25: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Fire Protection Equipment(EC.02.03.05 – 42%)

Hospital inspects, tests & maintains fire safety equipment.Includes testing of: fire alarms boxes, smoke

detectors, sprinklers, portable extinguishers, magnetic release devices, tamper switches

& water flow devices.If outsourced to a vendor keep the report, read the

report and act on problems! Make sure reports are tied to an inventory of devices

25

Page 26: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Fire Extinguisher Dating(EC.02.03.05 cont.)

Month, day, year and initials of inspector required per NFPA 10-1998

They will review the tagIf bar coded, they will review documentationRequired monthly

26

Page 27: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Fire Protection Equipment(EC.02.03.05 – 42%)

Hospital inspects, tests & maintains fire safety equipment.Includes testing of: fire alarms boxes, smoke

detectors, sprinklers, portable extinguishers, magnetic release devices, tamper switches

& water flow devices.If outsourced to a vendor keep the report, read the

report and act on problems! Make sure reports are tied to an inventory of devices

27

Page 28: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Medical Gas(EC.02.05.09 – 20%)

• Hospital inspects, tests & maintains medical gas and vacuum systems.

• Get vendor reports, fix problems noted• Gas shut off valves must be labeled with

rooms they shut off. Staff must know who can shut these off and when.

• Alarms must be working. Has led to ITL

28

Page 29: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Provide/Maintain Fire Systems and Equip (LS.02.01.35 33%)

Sprinklers• 18 inch rule• Sprinkler pipes can not support other items

like cables or wires• Sprinkler head clean and free of obstruction,

collar flush

Page 30: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Medical Gas(EC.02.05.09 – 20%)

• No parking zone!• Get vendor reports, fix problems• Gas shut off valves must be labeled

with rooms they shut off.• Staff know who can shut these off• Alarms must be working. Led to ITL• Test & inspect & maintain medical gas

and vacuum per policy

Page 31: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Safe, Functional Environment(EC.02.06.01 – 20%)

• Areas scored here: furnishing and equipment are in good repair, the environment meets needs of patient.

• Ripped mattresses, cracked ceiling tile, mold, broken wheel chair

• In behavioral health units do environmental risk assessment for suicide risks. Either fix or implement other safety interventions such as increase monitoring. Document and keep your risk assessment. ( or scored at EC.01.01.01)

Page 32: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Safety and Security(EC.02.01.01 – 15%)

Hospital manages safety and security risks• Complete risk assessments on areas of potential risk• Scored in sensitive areas such as Labor and Delivery,

Pediatrics• Trace your own policies, do staff stop you or surveyor

when they enter area? • See unsecured O2 scored here JKC

Page 33: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Strategies for SuccessPreparing Clinical Areas

• Rollout the Clinical Area Checklists– Email them out, assign, implement, collect them

back, analyze compliance

• Involve/educate clinical & frontline staff • Everyone knows who to call to get fixed• Identify areas to improve, fix it, then reassess• Make LS an every day expectation!

Page 34: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Strategies for SuccessDo Mock Surveys

• Conduct mock tracers in clinical areas• Do EOC System Tracer during your Mock

survey– Use the documentation checklist– “show me where this is documented”– Look for missing dates, think medication

refrigerators when doing this!

Page 35: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Strategies for Success

• Review your eSOC quarterly for updates, completion of projects

• Validate that ILSM evaluations exist on paper for each PFI on the eSOC

• Work with facilities staff and learn the language

Page 36: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Strategies for Success

• Make use of the PPR to document compliance– Record the name and location of each report that

documents compliance– Helps during on-site survey!

• When in doubt, get clarity from SIG

Page 37: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Survey Process Preparation

• Before your next survey prepare for and/or practice the following:– Day one documents – surveyor planning session– Environment of Care system tracer – Document Review session *– Emergency Management system tracer– LSC building tour *

Page 38: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Now That You Know… fix it

• Options for managing self identified deficiencies in LS.02.xx.xx – LS.04.xx.xx– Correct it immediately– Fix in 45 days in corrective maintenance – document it.– If it takes >45 days, create a Plan for Improvement (PFI) in

your e-SOC – Consider equivalency request to TJC

Page 39: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Managing the Onsite Survey …

GOOD MORNING, WE ARE HERE FROM THE JOINT COMMISSION

• Validate ID on the extranet• Institute your calling tree• Everyone or their back up initiates the pre-

planned action.• Rooms are freed up, • Documents are rolled in, opening conference

starts. Optional information shows great things only

39

Page 40: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

Institute the Action Plan Everyone in Position

40

Page 41: Alarm Fatigue and other EC/LS Hot Spots for Clinical Managers October 2011 Jennifer Cowel, RN MHSA.

QUESTIONS?

[email protected]

Please visit and bookmark www.pattonhc.com