Alan F. Hamlet, Nathalie Voisin, Dennis P. Lettenmaier, David W. Pierce, Tim Barnet Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering University of Washington Scripps Institute of Oceanography California Energy Commission April, 2005 The Role of Climate Forecasts in Western U.S. Power Planning
31
Embed
Alan F. Hamlet, Nathalie Voisin, Dennis P. Lettenmaier, David W. Pierce, Tim Barnett Center for Science in the Earth System Climate Impacts Group and Department.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Alan F. Hamlet, Nathalie Voisin,
Dennis P. Lettenmaier, David W. Pierce, Tim Barnett
Center for Science in the Earth System Climate Impacts Group
and Department of Civil and Environmental EngineeringUniversity of Washington
Scripps Institute of OceanographyCalifornia Energy Commission
April, 2005
The Role of Climate Forecasts in Western U.S. Power Planning
Background
150000
200000
250000
300000
350000
400000
450000
190
0
191
0
192
0
193
0
194
0
195
0
196
0
197
0
198
0
199
0
200
0
Ap
r-S
ept F
low
(cfs
)
Effects of the PDO and ENSO on Columbia River Summer Streamflows
Cool CoolWarm Warm
PDO
Red=warm ENSO Green=ENSO neutral Blue=cool ENSO
Value of Long-Range Streamflow Forecasts for PNW Hydro Marketing
~ $150 million/yr
This value is created in part by marketing additional energy in late summer (when energy is more valuable) in expected wet years.
Hamlet, A.F., Huppert, D., Lettenmaier, D.P., 2002, Economic Value of Long-Lead Streamflow Forecasts for Columbia River Hydropower, ASCE J. of Water Res. Planning and Mgmt, 128 (2), pp 91-101
Covariation of Normalized PNW and CA Hydropower Production
California hydropower is less than 10% of total CA demand, but may play a significant role in energy trading on short time scales. Transferable energy from the PNW is also about 10%.
R2 =0.541
Predictability of Seasonal Demand in the PNW and CA
•Winter demand in the PNW is predictable with long lead times via ENSO forecasts:
•Summer demand in CA has been recently demonstrated to be predictable with several months lead time using the NPO (PDO) index in spring (Alfaro et al. 2005). •
B.Normal NPO (MAM) = B. Normal CDD in S. CA. (JJA)A.Normal NPO (MAM) = A. Normal CDD in S. CA. (JJA)
•Load is out of phase with PNW water availability.
30000
30500
31000
31500
32000
32500
33000
-3 -2 -1 0 1 2 3 4
Nino3.4 Anomaly (C)
Ave
rag
e N
DJF
Pea
k E
lect
rica
l Lo
ad (
MW
)Nino3.4 Anomaly vs Avg NDJF Peak Electrical Demand
MAM-PDO IndexExplains about 20% of the Variance in monthly average TMAX in CA.
y = 189.49x + 36876
R2 = 0.0014
20000
25000
30000
35000
40000
45000
50000
55000
60000
-2.5 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5
MAM avg PDO
CA
pk
dem
Relationship Between MAM avg PDO and CA Daily Peak LoadApproximate Threshold of Capacity Problems
May-June-July Hydropower available for Transfer
0
1
2
3
4
5
6
7
19
17
19
22
19
27
19
32
19
37
19
42
19
47
19
52
19
57
19
62
19
67
19
72
19
77
19
82
19
87
19
92
19
97
20
02
Cli
ma
te s
ign
als
0
2,000
4,000
6,000
8,000
10,000
12,000
PDO
ENSO
Available Energy
Surplus Energy in Spring the PNW is Predictable with Long Lead Times
Above normal surplus hydro from the PNW is more likely in cool PDO and cool ENSO years, less likely in warm PDO and warm ENSO years.
Probability of Exceedance for Spring Surplus Energy Resources in the PNW
Simple Monthly Energy Transfer Model
April May June July August
CA Natural Gas electricity $/MWh 59.52 59.52 59.52 59.52 59.52
PNW hydropower sale (HHL + load variance)
$/MWh 19.15 19.08 23.63 30.71 44.94
(PNW transmission) $/MWh 3.39 3.39 3.39 3.39 3.39
(PNW high load hour sale (HHL), PNW benefit)
$/MWh 18.05 17.98 22.53 29.61 43.84
If surplus energy is available (i.e. system-wide supply > PNW load) then energy can be shipped from the PNW to CA subject to the following constraints.
•Transferred energy does not exceed the intertie capacity during daylight hours ( instant intertie cap*10 hr*days per month)
•Transferred energy does not exceed the hydro production at John Day and The Dalles hydro plants
•Transfer is economically feasible (less cost than gas turbine generation in CA)
April Benefits:
CA = $36.98/ MW-hr
PNW = $18.05/ MW-hr
Apr-July Surplus System Wide Energy Available for Transfer(value is constrained by intertie capacity and the capacity of John Day and The Dalles hydro plants)
Extra Benefits and Costs over April-May-June-July in millions $
CA BENEFIT
PNW BENEFIT
WARM
ENSO 132 77
PDO 135 78
ENSO/PDO 120 69
COLD ENSO 172 102
PDO 186 111
ENSO/PDO 189 112
AVG 159 95
Estimate of Economic Benefits of Current Energy Transfers
Why is transferable energy so much higher in the most recent decades?
150000
200000
250000
300000
350000
400000
450000
190
0
191
0
192
0
193
0
194
0
195
0
196
0
197
0
198
0
199
0
200
0
Ap
r-S
ept F
low
(cfs
)
Effects of the PDO and ENSO on Columbia River Summer Streamflows
Cool CoolWarm Warm
PDO
Red=warm ENSO Green=ENSO neutral Blue=cool ENSO
y = 632.52x + 196974
R2 = 0.0598y = 1257.6x + 379657
R2 = 0.0842y = 2077.8x + 389645
R2 = 0.1032y = 780.89x + 244524
R2 = 0.0478
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1917
1920
1923
1926
1929
1932
1935
1938
1941
1944
1947
1950
1953
1956
1959
1962
1965
1968
1971
1974
1977
1980
1983
1986
1989
1992
1995
1998
2001
April
May
June
July
Linear (April)
Linear (May)
Linear (June)
Linear (July)
Reservoir Storage “Resets”
Sys. Storage 80%
Sys. Storage 90%
Reservoir system storage in the most recent decades has been relatively high, which increases efficiency.
A Forecast Timeline
Jun Aug Jun
On ~June 1 we have:
•CurrentReservoirContents (PNW and CA)
•Current SummerStreamflow Forecast (PNW and CA)
•ENSO forecast•PDO forecast
CA Demand
Surplus PNWEnergy forComing Spring
PNW Winter Demand
Jan
Forecasts:
Two Primary Energy Planning Applications:
1) Predicting Natural Gas Consumption in CA
CA hydro and transferable surplus hydro in spring from the PNW to CA represents gas that will not be burned in CA to produce peaking energy in spring and summer. The probability distribution of this number is known with about 12-months lead time. Because CA and PNW hydro are typically in phase the effect is typically amplified.
2) Changes in Water Management in the PNW
Releases of water in late summer are at a premium in the PNW. Using streamflow forecasts, an available energy pool can be estimated that will not jeopardize reservoir refill in spring. Power from this pool could then be sold to spot market customers in CA depending on their needs. This effective transfer of energy from the coming spring to the current summer would benefit the PNW in terms of achieving more reliable fish flows in late summer and higher power revenues on average.
•Such actions would not reduce drought risks to fish (no energy to ship to CA).