Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances be regarded as stating an official position of the European Commission. The preparation of the 2012-15 Work Plan Management and funding of the WP*
21

Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

Mar 28, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

Alan EdwardsEuropean Commission

5th GEO Project Workshop London, UK8-9 February 2011

* The views expressed in these slides may not in any circumstances be regarded as stating an official position of the European Commission.

The preparation of the 2012-15 Work Plan Management and funding of the WP*

Page 2: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Selected GENERAL GUIDELINES

• Build upon synergies across Societal Benefit Areas and cross-cutting areas;

• Improve the coordination of activities at both, sub-task and Overarching-Task level;

• Ensure the continuity of relevant activities; • Realize the potential of Communities of Practice and

Committees.

Page 3: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Mid-Term EvaluationSelected Recommendations

• GEO must investigate alternative models for sustained resource commitments from Members and Participating Organizations which are necessary for current and future operations

• GEOSS implementation in the short-term should be guided by an explicit approach linking activities and outputs of the GEO Work Plan to measurable, achievable objectives and Strategic Targets.

Page 4: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Mid-Term EvaluationSelected Key Findings

• Work Plan Overarching Tasks should align with GEOSS Strategic Targets.

• To enable structural gap identification, the GEOSS implementation approach should be transparent in how sub-tasks, Overarching Tasks, and Strategic Targets contribute to achieving the vision of GEOSS

• Stakeholders would like to see a reinvigorated priority given to: i. an increased focus on the end-user of GEOSS information,

ii. more coordination between Members and Participating Organizations at the Societal Benefit Area and Task level, and

iii. the development of a sustainable funding and resource model to support the GEOSS initiative

Page 5: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: RECOMMENDATIONS fromthe GEO WORK PLAN SYMPOSIUM

• The development of the next Work Plan should involve the entire GEO community and aim at aligning Overarching Tasks and sub-tasks with Strategic Targets.

• People should be invited to “think out of the box” and make proposals for a Work Plan primarily aimed at achieving the Strategic Targets. In this context, one could think of giving “implementation priority” to selected Tasks deemed essential to reach specific Targets.

• The coordination role of Overarching Tasks should be improved.

Page 6: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• The starting point for developing the 2012-2015 Work Plan MUST BE the 2015 GEOSS Strategic Targets, which were adopted by the GEO-VI Plenary.

• These targets form the link between the negotiated text of the 10-Year Implementation Plan and the 2012-2015 GEO Work Plan.

• In addition, they also connect to the framework for GEOSS monitoring and evaluation.

Page 7: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• There should be one single "Strategic Target

Task" (STT) for each Strategic Target*

* An exception should be made for the Architecture and Data Targets. The work in these two areas is explicitly linked. Hence all transverse aspects of GEOSS Architecture & Data (A&D) should stay together and should include policies (data sharing), financial considerations for sustained operations, monitoring and reporting, gap analyses, etc.]

Page 8: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Question Arising:• Should the Strategic Targets be reviewed and

where necessary updated?

Page 9: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• A Management Board (MB) should oversee

each STT

• A Strategic Target Task Management Board (STT-MB) should be established for each of the 13 Target Tasks, (i.e. 4 transverse STT-MBs and 9 SBA STT-MBs).

• Each STT-MB should be given the mandate to actively oversee the management and execution of a Strategic Target Task.

• By convening a STT-MB for each of the Strategic Targets, the implementation of the transverse and SBA Strategic Targets will be placed on the same footing,

Page 10: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• Membership of each STT-MB should be limited and

should include:– An overall Strategic Target Task Co-ordinator and Deputy, who would have

responsibility for chairing the STT-MB;– The leader of each STT Work Package (see 3 below);– A member of the GEO Secretariat;– A designated liaison with the A&D STT-MB, noting that this could be a

person from a) or b) above;– A designated liaison with the Capacity Building STT-MB, noting that this

could be a person from a) or b) above;– A designated liaison with the Science & Technology STT-MB, noting that this

could be a person from a) or b) above;– A designated liaison with the User Engagement STT-MB, noting that this

could be a person from a) or b) above.

Page 11: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Question Arising:• Should each member of an STT-MB play an

active role in the execution of the STT?

Page 12: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• As a consequence of moving to this new

structure, the current GEO Committees should be disbanded.

• Note: the efforts of the current GEO Committees will not be lost. Rather, the leadership role of the four existing Committees would be carried forward in the4 Transverse STT-MBs.

Page 13: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• The Strategic Target Task Co-ordinator and

his/her Deputy must be fully resourced, i.e., they must be able to work full-time on the execution of the Strategic Target Task, and also have the resources available to them to support travel, organising meetings, etc.(If GEO is unable to provide even this basic level of support, then it will fail.)

Page 14: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• Work Packages should be defined for each

Target Task• STT Work Packages should be defined, such that each

"Strategic Target will be achieved through" the successful execution of various Work Packages that will contribute to the implementation of the overall single STT.

• Work Packages should be clearly defined, with the required actions set out, deliverables listed, milestones specified, etc.

Page 15: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• For the SBAs, a generic Work Package

structure should initially be adopted.4 Work Packages could be foreseen for each SBA, along the following lines:– Observing capability– Data (Management)– Tools and Information Provision– Impact.

Page 16: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Question Arising:• Such a change in the structure of the Work

Plan will involve a transition period.• How can this be achieved so that it is:

– a) kept short;– b) managed, with as much of the work as

possible being done in advance?

Page 17: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• A single Strategic Target Tasks Coordination

Committee should be created. • This would enable the various Strategic Target Task Co-

ordinators to meet, exchange information and co-ordinate their work.

• The Work Plan Co-ordinator from the GEO Secretariat should sit on this Committee, together with the Chair and designated representatives of the M&E WG.

Page 18: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: Is there a structure that can address ALL these points?

• Proposal:• The Strategic Target Tasks Coordination

Committee should be central to reporting, dissemination & engaging the GEO Community.

• There should be a Workshop open to the entire GEO Community – possibly in early Summer

• The Consideration could also be given to the Committee organising a full-day session the day before the Plenary, to present the work of the various Strategic Target Tasks to those attending Plenary.

• (This "info day" would not be officially part of Plenary, as it would be led by the

Strategic Target Task Coordinators, not the Co-Chairs.)

Page 19: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: A possible new structure for the GEO WP

STT-MBs

9 SBAs

STT-MBs

4 Transverse

A&D, CB, S&T, User

WP

Data Mgmt

WP

Observing Capability

WP

Impact

Strategic Target Tasks (STT*)Coordination Committee

WP

Tools & Info.

STT = Strategic Target Task: 1 per Strategic Target - (except A&D)MB = Management BoardWP = Work Package

Page 20: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

2012-2015 Work Plan: A possible new structure for the GEO WP

GEO Plenary

Executive CommitteeM&E WG

Strategic Target TasksCoordination Committee

To each meeting of

EXCOM

Annually to

Plenary

Regularly to the

M&E WG

Page 21: Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.

Is there any meritto these proposals?

Conclusion