www.KNPC.com.kw Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah Solar Project Kuwait National Petroleum Company
16

Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

May 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

www.KNPC.com.kw

Dec. 2018

Al-Dibdibah Solar Project

Phase 2 of Renewables toward a Clean Energy Transition

Meshal Al-Saeidi

Team Leader, Al-Dibdibah Solar Project

Kuwait National Petroleum Company

Page 2: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

2

Why the Project?

Page 3: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

3

Why the Project?

“In the field of renewable energy, the State of Kuwait

attached great concern to the diversification of its

energy sources, where the concerned entities started

the executive phases of an ambitious plan for using

wind and solar energy aiming to raise the percentage

of using this energy to 1% of the total energy usage in

Kuwait in 2015, and up to 15% in 2030.”

- H.H. Amir of the State of Kuwait Sheikh Sabah Al

Ahmad Al Jaber Al Sabah - COP 18

Page 4: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

4

Projects to Meet the Amir’s Vision

To meet The Amir’s vision, Al-Shagaya

Renewable Energy Park, comprising 3

phases, has been established near Al-

Salmi Road in West Kuwait. The three

phases are as follows:

Phase 1: KISR – 70MW. 50 MW CSP,

10 MW Solar PV, and 10 MW Wind

Phase 2: KNPC – Al-Dibdibah.

1,500MWAC. 100% Solar PV

Phase 3: Handled by KAPP. Capacity of

at least 2,000 MW. It will have Solar PV,

CSP, and wind Phase 1

Page 5: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

5

Site

• Al-Dibdibah is an extensive gravel

plain. The plain is bounded on the

West by the the Wadi Al-Batin.

• The plain extends northward from

Saudi Arabia into Kuwait Dibdibah

plain

• Area: 32 sq. km within Al-Shagaya

Renewable Energy Park

• 100 km west of Kuwait City

• Latitude: 29.2o N; Longitude: 47o E

• GHI: 2,181 kWh/m2/year

Page 6: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

6

Why the Location?

Solar Resource

Assessment over Kuwait:

Validation of

Satellite-derived Data and

Reanalysis Modeling

Majed Al-Rasheedi1, Christian

A. Gueymard2, Alaa Ismail1

and Salem Al-Hajraf1

1:Kuwait Institute for Scientific

Research, Kuwait

2:Solar Consulting Services,

Colebrook, NH, USA

Page 7: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

7

Why the Location?

Page 8: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

8

About the Project

• The project will cause the reduction of approximately 2.1 million tons of CO2

equivalent emissions per year and cause fuel savings of approximately 6.2 million

equivalent barrels of oil per year

• The requirement is to generate 3,150 GWh in year 25 of operation within 32 sq. km

• This translates to an estimated capacity of around 1,500 MWAC

• It is estimated that around 6 million solar panels will be used

Page 9: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

9

About the Project

• The project also comprises 5 Solar Generating Units (SGUs), including 5

substations connected to Ministry of Electricity and Water (MEW) Transmission

Substation

• The project comprises 160 km of Overhead Transmission Lines, all the way from

Al-Shagaya to MEW Power Station in Al-Subiya

• Power will be transmitted at 400 kV

Page 10: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

10

About the Project

• Power Purchase Agreement (PPA) between KNPC and MEW

• The project is currently in the Bidding Stage

• Commencement to Commercial Operation: 24 months

• Operation and Maintenance: 25 years

• Kuwaitization of jobs will be applicable per Kuwaiti Laws to ensure Transfer of Knowledge

Page 11: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

11

General Layout of the Plant

Page 12: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

12

Project’s Area

Page 13: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

13

OHL Route

Page 14: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

14

Thank You

Page 15: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

15

CO2 Captured in MM Ton Annually:

Year 1 Year 25 Over 25 Years Average

2.37 1.96 54.14 2.17

Tons

Annually= GWh Ton /GWh

CO2

Captured =

Electricity Generation

(annually)X Tons of CO2/GWh

(from International Energy Agency IEA)

Using Formula:

Tons

Annually= GWh Ton/GWh

2.37 MM = 3,809 X 622

Example for Year 1:

CO2 Equivalent Emissions Reduction

Page 16: Al-Dibdibah Solar Project - eugcc-cleanergy.net · Dec. 2018 Al-Dibdibah Solar Project Phase 2 of Renewables toward a Clean Energy Transition Meshal Al-Saeidi Team Leader, Al-Dibdibah

16

Fuel Savings

Fuel Savings in MM BBL Annually :

Year 1 Year 25 Over 25 Years Average

6.7 5.6 153.8 6.2

BBL

Annually= GWh Ton/GWh BBL/Ton

Fuel

Saving =

Electricity Generation

(annually)X

Electricity to crude

equivalent(from International Energy Agency

IEA)

X Barrel per Ton( from OPEC, Kuwait rate*)

Using Formula:

BBL

Annually= GWh Ton/GWh BBL/Ton

6.7 MM = 3,809 X 245 X 7.21

Example for Year 1: