Headquartered in Oshkosh, Wisconsin, ECM Holding Group provides energy conservation technologies and project solutions to major Energy Service Companies (ESCOs) and corporate clients in North America. LIT is a top provider of design, installation, and customer service excellence in the rapidly changing lighting industry. For more information, visit the ECM website, www.ECMHoldingGroup.com. LIT_Case_Houston-Airports_1pg_11172020, © ECM Holding Group, LCC. (Updated 11/17/20) Case Study: Airport Retrofit Situation The Houston Airport System developed a GESPC with the Texas A&M Engineering Experiment Station (TEES) and CenterPoint Energy to upgrade facilities at the George Bush Intercontinental (IAH) and the William P. Hobby (HOU) Airports. Working with ESCO METCO Engineering, they contracted with ECM's LIT group for the turnkey implementation of this comprehensive lighting retrofit project. It ran during the COVID-19 crisis. Project At HOU, the project targeted the three-story terminal, concourse, and connecting Red Garage complex. At IAH, the scope focused on their largest terminal A, and parking garages A, B, & C. COVID-19 and airport security increased the complexity of planning and installation. ECM performed 14,000 retrofits, with 9,000 new fixtures, 1,500 control systems, & 20,000 lamps. Airside Areas Included: Security, Baggage, Tunnels, Operations, and Passenger Commons. Landside Areas Included: Passenger Commons, Offices, Garages, Warehouses, and Operations. Houston Airport Project Type: Lighting Cost: $4,500,000 Rebate $425,303 Energy Savings: 13,870,995 kWh/year 1,660 kW/year $725,989 /year Simple Payback 5.4 years Airport Lighting Project Completed On-Time and Under-Budget. "Managing security at airports is an extreme task requiring tremendous attention. They did a great job adapting and responding quickly to security requirements with little to no incidents. ECM-LIT also helped our team seamlessly manage the rebate process, and we easily passed our rebate inspections. This is who I want managing my next project…" Lee Strickler, PM METCO Engineering Before After
1

Airport Lighting Project Completed On-Time and Under-Budget. LIT_Case... · 2020. 12. 21. · Houston Airport Project Type: Lighting Cost: $4,500,000 Rebate $425,303 Energy Savings:

Feb 15, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Headquartered in Oshkosh, Wisconsin, ECM Holding Group provides energy conservation technologies and project solutions to major Energy Service Companies (ESCOs) and corporate clients in North America.

    LIT is a top provider of design, installation, and customer service excellence in the rapidly changing lighting industry. For more information, visit the ECM website, www.ECMHoldingGroup.com.

    LIT_Case_Houston-Airports_1pg_11172020, © ECM Holding Group, LCC. (Updated 11/17/20)

    Case Study: Airport Retrofit

    Situation The Houston Airport System developed a GESPC with the Texas A&M Engineering Experiment Station (TEES) and CenterPoint Energy to upgrade facilities at the George Bush Intercontinental (IAH) and the William P. Hobby (HOU) Airports. Working with ESCO METCO Engineering, they contracted with ECM's LIT group for the turnkey implementation of this comprehensive lighting retrofit project. It ran during the COVID-19 crisis.

    ProjectAt HOU, the project targeted the three-story terminal, concourse, and connecting Red Garage complex. At IAH, the scope focused on their largest terminal A, and parking garages A, B, & C.

    COVID-19 and airport security increased the complexity of planning and installation. ECM performed 14,000 retrofits, with 9,000 new fixtures, 1,500 control systems, & 20,000 lamps.

    Airside Areas Included: Security, Baggage, Tunnels, Operations, and Passenger Commons.

    Landside Areas Included: Passenger Commons, Offices, Garages, Warehouses, and Operations.

    Houston AirportProject Type: Lighting

    Cost: $4,500,000

    Rebate $425,303

    Energy Savings: 13,870,995 kWh/year1,660 kW/year$725,989 /year

    Simple Payback 5.4 years

    Airport Lighting Project Completed On-Time and Under-Budget.

    "Managing security at airports is an extreme task requiring tremendous attention. They did a great job adapting and responding quickly to security requirements with little to no incidents.

    ECM-LIT also helped our team seamlessly manage the rebate process, and we easily passed our rebate inspections. This is who I want managing my next project…"

    Lee Strickler, PM METCO Engineering