Top Banner
AIRPACT-3 status and near-term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang
27

AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Jan 04, 2016

Download

Documents

Letitia Shields
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

AIRPACT-3 status and near-term objectives

Joe Vaughan

Brian Lamb

Jeremy Avise

Jack Chen

Matt Porter

Li Wang

Page 2: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Outline:

Status:– Reliability– Dairy Ammonia emissions– BlueSky wildfire emissions (PM2.5 & CO)– (Adjusted Mozart Boundary conditions)– (QuickLook Verification) – Off-line & selective Hg modeling– Dec 2005 PM2.5 Analysis

Page 3: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Near-Term Objectives and work in progress

• Convert rainier AIRPACT operations to new Linux box

• Re & Development of web sites• WEPS integration• Aug-Nov 2004 Evaluation (& Pathfinding)• Push Forecasts out to 48 or 72 hrs?• Nest to higher resolution sub-domains?

Page 4: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Who’s working on what

• Re & Development of web sites: Jennifer Hinds• Hg, N, S deposition (RGI): Matt Porter• Wind Erosion Prediction System: Li Wang• AIRPACT-3(+) evaluation for 2004 Jack Chen• Conversion to new linux system: Joe Vaughan• Satellite data retrieval: Farren Thorpe• Wildfire emissions: Jeremy Avise and

Jack Chen

Page 5: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Reliability

– November 2006?• Only Nov 26 run CMAQ failed to complete• Failsafe’s operation ran successfully for retrieving EPA

CMAQ results• Only to fail on disk space in graphics generation…

– CMAQ and forecast graphics generally complete by 4 AM.

Page 6: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Dairy NH3 Emission Module

WA Dairy NH3 (ton/yr)

Housing 8,634

Storage 5,441

Application 4,364

Total 18,439

OR Dairy NH3 (ton/yr)

Housing 9,469

Storage 5,079

Application 3,420

Total 17,967

Page 7: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

BlueSky/AIRPACT-3 Wildfire Smoke Modeling

MODIS Image for Sept 5 2006

BlueSky System at Forest Service

Observed Fire Events

AIRPACT retrieves: fire

location, fire size, heat flux, emissions

Predicted 24-hr PM2.5 for Aug. 2006

WSU Pullman

Page 8: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Hourly CTM vs Obs PM25Pullman, WA, 2006

0

20

40

60

80

100

120

Sep01 00 Sep02 00 Sep03 00 Sep04 00 Sep05 00 Sep06 00 Sep07 00 Sep08 00 Sep09 00 Sep10 00

PM

25

ug

/m3

OBS_PM25

CTM_PM25

0

10

20

30

40

50

60

70

80

Sep01 00 Sep02 00 Sep03 00 Sep04 00 Sep05 00 Sep06 00 Sep07 00 Sep08 00 Sep09 00 Sep10 00

PM

25 u

g/m

3

CTM_PM25 (24hrAvg)

OBS_PM25 (24hrAvg)Pullman, Sept, 2006

Page 9: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

5x5 GRID CELL MATRIX CENTERED AROUND SWAN RANCH (NTS)

Maximum Total_HG Wet Deposition May 18, 2006, 1600 PST

ug/ha

Rainy

day

,

Sout

hwes

t flo

w

AIRPACT-3 MAX (OVER 5X5 MATRIX) MERCURY WET AND DRY DEPOSITION MAY 18, 2006 AT SWAN RANCH

0

50

100

150

200

250

300

0 5 10 15 20 25

PST (hrs)

HG

(u

g/h

a)

HG-DRY

HG-WET

Page 10: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

EVALUATION OF THE AIRPACT-3 AIR QUALITY FORECAST SYSTEM FOR A WINTERTIME PM2.5 EPISODE

ByALICIA K. TONEY

Parameter mean bias mean absolute error Temperature (deg C) -0.5 2.1 Wind Speed (m/s) -0.6 1.2 Wind Direction (DEG) 12 70

Page 11: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

EVALUATION OF THE AIRPACT-3 AIR QUALITY FORECAST SYSTEM FOR A WINTERTIME PM2.5 EPISODE

ByALICIA K. TONEY

Site AVERAGE of

PREDICTED 24-hr running-means

AVERAGE of OBSERVED

24-hr running-mean

Gross bias

Fract Bias (%)

Lacey 5.8 20.2 -14.4 -28

Tacoma 11.8 25.6 -13.8 -21

Lynnwood 16.6 18.2 -1.6 -8

Wenatchee 3.2 17.7 -14.5 -40

Marysville 4.1 19.6 -15.5 -33

Bothell 22.4 18.8 3.6 7

Spokane 7.5 20.3 -12.8 -23

Kent 18.4 19.5 -1.1 -0

Ellensburg 10.6 15.3 -4.7 -10

North Bend 1.1 8.5 -7.4 -38

Seattle 15.7 10.2 5.5 7

Overall 10 17.7 -7 -16

Page 12: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

EVALUATION OF THE AIRPACT-3 AIR QUALITY FORECAST SYSTEM FOR A WINTERTIME PM2.5 EPISODE

Lynnwood

0

10

20

30

40

50

60

335 337 339 341 343 345 347 349 351

Day of Year, 2005

PM

2.5

(u

g/m

3)

Obs 24-hr

Pred 24-hr

Kent

0

10

20

30

40

50

60

335 337 339 341 343 345 347 349 351

Day of Year, 2005

PM

2.5

(u

g/m

3)

Obs 24-hr

Pred 24-hr

Ellensburg

0

10

20

30

40

50

60

335 337 339 341 343 345 347 349 351

Day of Year, 2005

PM

2.5

(u

g/m

3)

Obs 24-hr

Pred 24-hr

Page 13: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Moving rainier operations to new linux box

• Rainier is (1990s era) DEC-Compaq-HP alpha-based w/ Unix

• New box is AMD w/ Debian Linux• Issues:

– compiler switches – routine name ‘mangling’ – library creation– path changes

– testing

Page 14: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Re & Development of Web Sites

• WSU Publication’s Content Mgmt System• Putting web authoring control in LAR• Strategy --

– Shorten cycle for updating project contents.– Standardize web code/technology across projects. – Get standard content in place, then

– Focus on data graphics generation, tools, and downloads.

Page 15: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

WEPS-AIRPACT-3 Databases DevelopmentWEPS-AIRPACT-3 Databases DevelopmentGuanglong Feng and Li Wang Guanglong Feng and Li Wang

Land Use &Soil Management

Page 16: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Landuse Management Database

Page 17: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

BELD3 Dry Crop Type and Percentage

Page 18: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Developed and GriddedSoil Database

Page 19: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Evaluation of AIRPACT-3+ for Aug –– Nov 2004 reruns

by Jack Chen

MCIP v3.1 at 21 layersCMAQ v4.6

Aerosol v4 w/ Sea saltPathfinder for next upgrades for AIRPACT-3,

to be implemented once running on new Linux box.

Page 20: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

EPA AQS O3 StationsHourly O3 for Aug – Sep 2004

Page 21: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

8-Hr Daily Max O3 Paired by Site/Time

100

80

60

40

20

0

Mo

de

led

(p

pb

v)

100806040200

Measured (ppbv)

8-Hour Ozone Daily Maximum (EPA AQS Sites) Num of Points 1855

MB 6.5

ME 9.2

NB 25%

NE 30%

NMB 18%

NME 25%

FB 19%

FE 25%

RMSE 11.2

R 0.6

CTMMAX 87.1

CTMAVG 41.9

OBSMAX 78.8

OBSAVG 36.6

Page 22: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

8-Hr Daily Max O3 Paired by Site/Time

0.1

2

4

6

81

2

4

6

810

Mo

de

led

/ M

easu

red

Rat

io

80604020Measured (ppbv)

Page 23: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Hour Difference Between OBS. and CTM. Peak Daily 8-Hr O3

30

25

20

15

10

5

Per

cent

age

Cou

nt (

%)

121086420Hour Difference Between Observed and Measured O3 Peak Time (hour)

Data Paired by Site and Date

Number of Data Points: 2265

Page 24: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

IMPROVE / EPA-AQS PM StationsAug – Nov 2004

50

48

46

44

42

-124 -122 -120 -118 -116 -114 -112

EPA_AQS_PM2.5_Sites EPA_AQS_Speciated_PM_Sites IMPROVE

Page 25: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Fractional ErrorBy Site and PM Species for Sep – Nov

2004

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

0 2 4 6 8 10 12 14

Average Concentration (ug/m3)

Fra

ctio

nal

Err

or

Goal

Criteria

PM25

PNO3

PSO4

PEC

POC

PNH4

Page 26: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Fractional BiasBy Site and PM Species for Sep – Nov

2004

-2.0

-1.5

-1.0

-0.5

0.0

0.5

1.0

1.5

2.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0

Average Concentration (ug/m3)

Fra

ctio

nal

Bia

s

Goal+

Goal-

Criteria+

Criteria-

PM25

PNO3

PSO4

PEC

POC

PNH4

Page 27: AIRPACT-3 status and near- term objectives Joe Vaughan Brian Lamb Jeremy Avise Jack Chen Matt Porter Li Wang.

Based on results of evaluations… should we…

Push forecasts out to 48 or 72 hrs?

Nest to higher resolution sub-domains?