Top Banner
Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division
9

Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

Jan 16, 2016

Download

Documents

Cathleen Paul
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

Air Regulations for Municipal Solid Waste

Landfills

Dana Podell

Air Pollution Control Division

Page 2: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

All Colorado Landfills

State Regulations– File an APEN & Obtain a Permit from the

APCD– Implement Fugitive Dust Control Measures

Federal Regulations – NSPS Subparts Cc and WWW– MACT Subpart AAAA

Page 3: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

APCD Permit Types

Construction Permit– For smaller landfills, based on design capacity– Once finalized, valid indefinitely unless

changes will be made at the facility– Include emissions limits and particulate

emission (dust) control measures– APEN update must be submitted every five

years

Page 4: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

APCD Permit Types

Operating Permit (Title V Permit)– For landfills with a design capacity above 2.5

million megagrams & 2.5 million cubic meters– Must be renewed every 5 years – Include emissions limits, dust control

measures, landfill gas sampling & emissions reporting

– May include landfill gas control system

Page 5: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

Fugitive Dust Controls Specific measures are described in the

permit Must be implemented Facility is responsible for demonstrating

compliance

Page 6: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

Common Control Measures Speed Limits

– Must be posted AND observed by drivers Haul Roads

– Water as needed to control dust– Other controls may include MgCl, gravel,

recycled asphalt Stockpiles

– Water as needed to control dust

Page 7: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

Excess Fugitive Dust

Page 8: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

NSPS Cc & WWW File a Design Capacity Report with APCD File an Amended Design Capacity Report when

the landfill’s capacity changes– Expansion approved by Solid Waste or other authority– Due 90 days after the expansion

May require a Title V (Operating) Permit– Based on design capacity – Additional compliance requirements can include:

NMOC emissions calculations Tier II gas sampling Installation of a gas collection system

Page 9: Air Regulations for Municipal Solid Waste Landfills Dana Podell Air Pollution Control Division.

Air Pollution Control Division Contact Information

Dana Podell – Field Services Landfill Inspector

303-692-3138

[email protected]

APCD Website: http://www.cdphe.state.co.us/ap/index.html