PERENCANAAN PENYEDIAAN AIR BERSIH PROGRAM STUDI TEKNIK KONSTRUKSI SIPIL JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI JAKARTA BAB V ANALISA DATA 5.1 Analisa Perhitungan Debit Kebutuhan Perhitungan Debit Kebutuhan dengan Umur Rencana 10 Tahun Diketahui data sebagai berikut: 2,25m 2,25m V = 0,89 m/det h aktual = 1,12 m 1,12 m 2,25m A aktual = ( 6,75 +2,25) 1,12 2 =5,04m 2 Sehingga debit aliran : Q aktual = A x V x 50 % = 5,04 x 0,89 = 2,24 m 3 /det Sehingga debit aliran pada musim kemarau : Q min = 30%. Q aktual = 0,672 m 3 /det Q sadap = 1 3 Q min = 1 3 . 0,672 = 0,224 m 3 /det ANDY SUPRIADI 3109120 FAJAR DEWANTARA 3109120 M REZA FIRDAUS 3109120 1
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
BAB V
ANALISA DATA
5.1 Analisa Perhitungan Debit Kebutuhan
Perhitungan Debit Kebutuhan dengan Umur Rencana 10 Tahun
Diketahui data sebagai berikut:
2,25m 2,25m
V = 0,89 m/det
h aktual = 1,12 m
1,12 m
2,25m
A aktual = (6,75+2,25 ) 1,12
2=5,04 m2
Sehingga debit aliran :
Q aktual = A x V x 50 % = 5,04 x 0,89 = 2,24 m3/det
Sehingga debit aliran pada musim kemarau :
Q min = 30%. Q aktual = 0,672 m3/det
Q sadap = 13
Q min
= 13
. 0,672
= 0,224 m3/det
Perhitungan Debit Kebutuhan dengan jumlah penduduk Umur Rencana 10 Tahun
Diketahui data sebagai berikut:
P0 = 1585 jiwa
r = 3 % / tahun
n = 10 tahun
Pn = P0 (1 + r)n
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 1
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
= 1585 (1 + 0,03)10
= 2131 jiwa
Penentuan Kebutuhan Air Bersih dengan jumlah penduduk Umur Rencana 10 Tahun:
q = 200 liter/jiwa/hari
Q = P x q = 2131 x 200 = 4,93 liter/det = 0,0049 m3/det
60x60x24
Penentuan debit aliran yang boleh disadapjumlah penduduk Umur Rencana 10 Tahun:
Penentuan jumlah rumah jumlah Umur Rencana 10 Tahun:
Pn = 2131 jiwa
1 rumah = 5 orang
Jumlah rumah = 2131
5=427 rumah
Perhitungan jumlah SR dan KU
Rumah permanen = 427 = 427 SR +
427 SR
KU = 427= 12,2 KU = 122 SR
35
Total = 427-122 = 305 SR
Debit yang dibutuhkan = 305 x 0,098 lt/det = 29,89 lt/det = 0,030 m3/det
Jika Qkebutuhan < Qtersedia
0,030 m3/det <0,224 m3/det (OK)
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 2
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
Kesimpulan :
Sumber air dapat memenuhi kebutuhan air masyarakat selama 10 tahun ke depan. Debit
yang dibutuhkan 0,030 m3/det sedangkan debit tersedia 0,224 m3/det Sehingga tidak perlu
dicari dari sumber air lainnya.
5.2 Perhitungan Debit Kebutuhan Antar Node
(Diambil contoh perhitungan pada node 8 - 7 )
Titik node =8 - 7
Jenis saluran = distribusi (D)
Jumlah SR = 35 buah
1 SR = 0,098 lt/dtk
Q SR total = nSR x SR= 35 x 0,098 = 3,43 lt/dtk
Jumlah KU = 1 buah
1 KU = 0,98 lt/dtk
Q KU = nKU x KU = 1 x 0,980 = 0,980 lt/dtk
Q Total = Q SR + Q KU
= 3,43 lt/dtk + 0,980 lt/dtk
= 4,41 lt/dtk = 0,00441 m³/dtk
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 3
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
TABEL I.PENYEBARAN SR DAN KU DEBIT
Node KET SR KUQ Q Q Q Q
SR (lt/dt)
KU (lt/dt)
SR+KU (lt/dt)
Total (lt/dt)
Total (m3/dt)
Komulatif (m3/dt)
8-7 D 35 1 3,43 0,98 4,41 4,41 0,00441 0,004417-5 S 0 0 0 0 0 0 0 0,004415-6 D 34 1 3,332 0,952 4,284 4,284 0,004284 0,0086945-3 S 0 0 0 0 0 0 0 0,0086943-4 D 33 1 3,234 0,924 4,158 4,158 0,004158 0,0128523-2 S 0 0 0 0 0 0 0 0,0128522-1 D 35 1 3,43 0,98 4,41 4,41 0,00441 0,017262
7-13 D 33 1 3,234 0,924 4,158 4,158 0,004158 0,0214213-18 D 36 1 3,528 1,008 4,536 4,536 0,004536 0,02595613-14 S 0 0 0 0 0 0 0 0,02595614-15 D 38 1 3,724 1,064 4,788 4,788 0,004788 0,03074414-11 S 0 0 0 0 0 0 0 0,03074411-12 D 35 1 3,43 0,98 4,41 4,41 0,00441 0,03515411-9 S 0 0 0 0 0 0 0 0,0307449-10 D 32 1 3,136 0,896 4,032 4,032 0,004032 0,034776
14-16 S 0 0 0 0 0 0 0 0,03477616-17 D 36 1 4 1,008 4,536 4,536 0,004536 0,03931216-19 S 0 0 0 0 0 0 0 0,03931219-20 D 38 1 3,724 1,064 4,788 4,788 0,004788 0,044119-21 S 0 0 0 0 0 0 0 0,044121-22 D 42 1 4,116 1,176 5,292 5,292 0,005292 0,049392ER-8 P 0 0 0 0 0 0 0 0,049392
427 12 11,956
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 4
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
GAMBAR I. PENYEBARAN SR DAN KU
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 5
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
5.3 Perhitungan Dimensi Pipa
(Diambil contoh perhitungan pada salah satu node)
Pipa Primer
Titik node =ER-8
Debit (Q) = 0,049 m3/dtk
Jarak Horizontal (LH) = 79,36 m
Elevasi ER = + 40 m
Elevasi pipa 8 = + 38,5 m
Beda Tingg (ΔH) = Elevasi ER - Elevasi 1
= 40 m – 38,5 m = 1,5m ( Landai )
Kemiringan Pipa = ΔH x 100 = 1,5 x 100 = 0,018 %
LH 79,36
Panjang Pipa (LP) = √ ΔH 2 + LH 2 = √ 1,52 + 79,362 = 79,38 m
Kemiringan Hidrolik (S) =ΔH x 100 = 1,5x 100 = 0,018 %
LP 79,36
Jenis Pipa = black steel
C = 120
Diameter Pipa (ø) = Q1 / 2,63
0,2785 x C x S 0,54
= 0,0491 / 2,63
0,2785 x 120 x 0,000180,54
= 0,190m = 7,480inchi = 8 inchi
Kecepatan (V) = Q = 0,049 = 1,74 m/dtk
A 0,03
Diameter Pakai = 8 inchi = 0,203 m
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 6
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
Pipa Sekunder
Titik node =7-5
Debit (Q) = 0,004 m3/dtk
Jarak Horizontal (LH) = 24 m
Elevasi pipa 7 = + 39,5 m
Elevasi pipa 5 = + 38,9 m
Beda Tingg (ΔH) = Elevasi 7 - Elevasi 5
= 39,5 m – 38,9 m = 0,6m (landai)
Kemiringan Pipa = ΔH x 100 = 0,6 x 100 = 2,49%
LH 24
Panjang Pipa (LP) = √ ΔH 2 + LH 2 = √ 2,492 + 242 = 24,01 m
Kemiringan Hidrolik (S) =ΔH x 100 = 0,6 x 100 = 2,49 %
LP 24,01
Jenis Pipa = black steel
C = 120
Diameter Pipa (ø) = Q1 / 2,63
0,2785 x C x S 0,54
= 0,0041 / 2,63
0,2785 x 120 x 2,490,54
= 0,072m = 2,835 inchi = 3 inchi
Kecepatan (V) = Q = 0,004 = 1,083 m/dtk
A 0,0041
Diameter Pakai = 3 inchi = 0,0762 m
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 7
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
Pipa Distribusi
Titik node =8-7
Debit (Q) = 0,004m3/dtk
Jarak Horizontal (LH) =103,88m
Elevasi pipa 8 = + 38,5 m
Elevasi pipa 7 = + 37,9 m
Beda Tingg (ΔH) = Elevasi 7 - Elevasi8
= 37,9 m – 38,5 m = 0,6 m ( Landai )
Kemiringan Pipa = ΔH x 100 = 0,6 x 100 = 0,578 %
LH 103,88
Panjang Pipa (LP) = √ ΔH 2 + LH 2 = √ 12 +103,88 = 103,88 m
Kemiringan Hidrolik (S) =ΔH x 100 = 0,6x 100 = 0,578 %
LP 103,88
Jenis Pipa = black steel
C = 120
Diameter Pipa (ø) = Q1 / 2,63
0,2785 x C x S 0,54
= 0,0041 / 2,63
0,2785 x 120 x 0,005780,54
= 0,097 m = 3,819inchi = 5inchi
Kecepatan (V) = Q = 0,004 = 0,597 m/dtk
A 0,0074
Diameter Pakai = 5 inchi = 0,127m
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 8
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
TABEL DIMENSI PIPA
node Lh Lp S Lp Ǿaktua
l
Ǿ pakai
Ǿ paka
iket R= D/4 A V
m m m m inchiinch
i cm
8-7 103.88
103.89
0.00963
103.89
0.087 3.425 5 12.7
D 0.03175
0.01
0.74
7-5 2424.02
0.00416 24.02
0.104 4.094 8
20.32
S0.0508
0.01
0.52
5-6 88.8888.89
0.00900 88.89
0.115 4.528 5 12.7
D 0.03175
0.01
0.84
5-3 2424.02
0.01249 24.02
0.107 4.213 8
20.32
S0.0508
0.01
0.97
3-4 7676.01
0.01316 76.01
0.123 4.843 5 12.7
D 0.03175
0.01
1.08
3-2 23.7223.74
0.00421 23.74
0.155 6.102 8
20.32
S0.0508
0.02
0.68
2-1 110 110.00
0.00182
110.00
0.206 8.110 10 25.4
D0.0635
0.03
0.52
7-13 76.676.61
0.00653 76.61
0.172 6.772 8
20.32
D0.0508
0.02
0.92
13-18 42.9642.98
0.01862 42.98
0.149 5.866 8
20.32
D0.0508
0.02
1.49
13-14 22.4822.51
0.01778 22.51
0.151 5.945 8
20.32
S0.0508
0.02
1.45
14-15 59.859.81
0.00669 59.81
0.196 7.717 8
20.32
D0.0508
0.03
1.02
14-11 23.8423.86
0.01257 23.86
0.173 6.811 8
20.32
S0.0508
0.02
1.31
11-12 58.3658.37
0.01199 58.37
0.183 7.205 8
20.32
D0.0508
0.03
1.34
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 9
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
11-9 15.7615.80
0.02533 15.80
0.150 5.905 8
20.32
S0.0508
0.02
1.74
9-10 55.4155.42
0.00902 55.42
0.194 7.638 8
20.32
D0.0508
0.03
1.18
14-16 24.7624.78
0.00807 24.78
0.198 7.795 8
20.32
S0.0508
0.03
1.13
16-17 56.7656.77
0.00705 56.77
0.213 8.386 10 25.4
D0.0635
0.04
1.10
16-19 24.7424.76
0.00808 24.76
0.207 8.150 10 25.4
S0.0635
0.03
1.17
19-20 39.1539.16
0.00511 39.16
0.238 9.370 10 25.4
D0.0635
0.04
0.99
19-21 23.2223.24
0.00861 23.24
0.214 8.425 10 25.4
S0.0635
0.04
1.23
21-22 53.0853.09
0.00377 53.09
0.264
10.394 12
30.48
D0.0762
0.05
0.90
ER-8 79.3679.38
0.01890 79.38
0.190 7.480 12
30.48
P0.0762
0.03
1.74
S = (ΔH/LH)/100%
Ǿ = Q 1 / 2,63
0,2785 x C x S 0,54
GAMBAR II. PANJANG DAN DIMENSI PIPA
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 10
A = ¼ x π x D2
V = Q/A
R= D/4
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
5.4 Perhitungan Hidrolis / Kehilangan Tinggi Tekan
(Diambil contoh perhitungan pada salah satu node)
Pipa Primer
Titik node = ER-8
Diameter pipa (ø) = 12 inchi = 30,48 cm
R = 0,3048 / 4 = 0,0762
Panjang Horizontal (LH) = 79,36 m
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 11
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA
Panjang pipa (LP) = 79,38 m
Kemiringan hidrolik (S) = 0,01890 %
Kecepatan (V) = Q/A = 1,74 m/dtk
Mayor losses (Hgs) = (V2 x Lp) / Kst2. R4/3
=( 1,742 x 79,38) / (832 x 0,0762 4/3)
= 1,08 m
Minor Losses (Hl) = V2 = 1,74 2 = 0,076 m
2 x g 2 x 10
Pipa Sekunder
Titik node = 7 - 5
Diameter pipa (ø) = 8 inchi = 20,32cm
R = 0,2032 / 4 = 0,0508
Panjang Horizontal (LH) = 24 m
Panjang pipa (LP) = 24,01 m
Kemiringan hidrolik (S) = 0,02499 %
Kecepatan (V) = Q/A = 1,083 m/dtk
Mayor losses (Hgs) = (V2 x Lp) / Kst2. R4/3
=( 1,0832 x 24,01) / (832 x 0,05084/3)
= 0,22 m
Minor Losses (Hl) = V2 = 1,083 2 = 0,059 m
2 x g 2 x 10
Pipa Distribusi
Titik node = 8-7
Diameter pipa (ø) = 5 inchi = 12,7 cm
R = 0,127 / 4 = 0,0318
Panjang Horizontal (LH) = 103,88 m
Panjang pipa (LP) = 103,88 m
Kemiringan hidrolik (S) = 0,00578 %
ANDY SUPRIADI 3109120FAJAR DEWANTARA 3109120M REZA FIRDAUS 3109120 12
PERENCANAAN PENYEDIAAN AIR BERSIHPROGRAM STUDI TEKNIK KONSTRUKSI SIPILJURUSAN TEKNIK SIPILPOLITEKNIK NEGERI JAKARTA