AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford Appleton Lab GEOSS AIP-2 Kickoff 25-26 September 2008
14

AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Mar 27, 2015

Download

Documents

Grace Lamb
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

AIP-2 Kickoff Workshop

Energy SBA Scenario Answer

Thierry Ranchin, Mines ParisTech, France

Team: Mines ParisTech, DLR, JRC, NASA

MeteoTest, Rutherford Appleton Lab

GEOSS AIP-2 Kickoff

25-26 September 2008

Page 2: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Scenario objectives

• Support the SBA Energy by developing services providing irradiance data among other parameters

• Simulating the case of the sitting of a solar power plant.

Page 3: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

?

Page 4: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

From the user’s point of viewStep Description

Step 0 The investor asks a consulting company for a study for a given geographical area

Step 1 The consulting company wants to obtain the necessary information and puts requests to the GEOSS portal

Step 2 The specific application is invoked

Step 3 The specific application invokes various web services and resources to retrieve needed information. It then invokes the specific processing web services.

Step 4 The specific application packs the layers as an archive file and deliver it to the consulting company

Step 5 The consulting company retrieves the archive, performs the study by exploiting the retrieved information and its own models and reports to the investor

Step 6 The investor takes a decision

Request

Answer

Process

Page 5: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

2. Meteorological, geographic and tools already available

Page 6: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Meteorological data

• Access through WSDL to databases:– Monthly means of solar irradiance

– Min, max and mean values of air temperature at 2 m

– Min, max and mean values of relative humidity at 2 m

– HelioClim 3 time series of irradiance (year 2005)

– Forecast of meteo data at surface for 3 days to 3 hours

– SOLEMI time series irradiance data

– NASA–SSE–HelioClim 1 times series of daily irradiance

• Other types of access

– Real time information meteorological data

• Providers: Mines ParisTech, NCAR, DLR, NASA, Rutherford Appleton Lab

Page 7: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Geographical information

• SRTM Data worldwide 3 arcsec (~90 m)

• Shaded area derived from SRTM

• Local maximum slope

Page 8: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Tools

• PV assessments through PVGIS Server (JRC)• Stochastical generation of test datasets for modelling

of PV system (MeteoTest)• PV Production calculator (MeteoTest)• Computation of renewable energy parameters

(NASA)

Page 9: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.
Page 10: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Geographical data• Source from SRTM DEM, results from specific processing. 100 meters resolution

Ratio between actual daylengthwith shadows and astronomical daylength (%)

Altitude in meters

Local maximum slope in degree

Page 11: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Geographical data: Hydrology and usage

• Security cooling device for Solar Plants– Need an important flow of cooling water

(typically 2 m3/s for a 12 MW Solar Plants)– Estimated cost for the linking to the Hydraulic Network Maps depends on

the linking length (typically 300 k€/km)– Need Hydraulic Network Maps

(Map scale better than 1/200 000)

Hydraulic network. Scale 1/200 000 Sample of estimated cost of hydro network linking in Keuros

Page 12: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Geographical data: Electricity network and usage

• Linking to High Voltage Electric Network– Estimated cost for the linking to the HV Electric Network Maps depends on

the linking length (typically 200 k€/km)– Need High Voltage Electric Network Maps

(Map scale better than 1/200 000)

Estimated cost of electric network linking KeurosElectric network. Scale 1/200 000

Page 13: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Environmental data

• Protected area & risk and hazard– Cope with regulation– Adequacy between the solar plant lifecycle and ROI

Protected area. Scale 1/200 000 Risk and Hazard. Scale 1/200 000

Page 14: AIP-2 Kickoff Workshop Energy SBA Scenario Answer Thierry Ranchin, Mines ParisTech, France Team: Mines ParisTech, DLR, JRC, NASA MeteoTest, Rutherford.

Input parameters & output result• Inputs:

– bounding box (lat., lon.), dates, scale, optional layers, valid email address

• Output results: – the geo-referenced layers (GeoTIFF, shape files) should be provided as a downloadable archive