Top Banner
AIM/CPM Briefing & AIM/CPM Briefing & Demo Demo 4-6 May 2010 Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD
27

AIM/CPM Briefing & Demo

Jan 24, 2016

Download

Documents

lenka

AIM/CPM Briefing & Demo. Jamie Stewart, AIM Team ISD Lead Danette Likens, AIM Team ISD. 4-6 May 2010. Overview. Summary of AIM I/II and CPM/LO Module Enhancements in Release 5.0 OCCSTDS support in CPM Demonstration of expanded video help tools NAVEDTRA 136 impacts on CPM / LO Module - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AIM/CPM Briefing & Demo

AIM/CPM Briefing & AIM/CPM Briefing & DemoDemo

4-6 May 2010

Jamie Stewart, AIM Team ISD LeadDanette Likens, AIM Team ISD

Page 2: AIM/CPM Briefing & Demo

OverviewOverview• Summary of AIM I/II and CPM/LO Module

Enhancements in Release 5.0• OCCSTDS support in CPM• Demonstration of expanded video help

tools• NAVEDTRA 136 impacts on CPM / LO

Module• MT Continuum impacts on CPM / LO

Module

Page 3: AIM/CPM Briefing & Demo

Summary of AIM I/II ACRS in Rel 5.0Summary of AIM I/II ACRS in Rel 5.0• ACR’s Many Prioritized at Last FRB• Supporting AIM I and AIM II• Coding in Process• Include Big Items:

‒ Exercise Controller Guide support‒ Associated Curriculum Documents

• Numerous Smaller Items:‒ Ease of Use

• NETC specific items (mostly related to TPP)

Page 4: AIM/CPM Briefing & Demo

OCCSTDS Support in CPMOCCSTDS Support in CPM

Learning Object [LO]

Module (ILE ILT content

objects)

Content Planning Module (CPM)

CMS Data

Perception

(Standard OCCSTD Fleet Survey and Level 3 Survey/LOK Exam

Templates populated from AIM I/II, CPM and LO Module via Web service functions)

Content structure data for Level 3 surveysTest item data for Level of Knowledge exams

Proposed Capability

LAS Applications

AIM

Proposed Interface

AIM I/AIM II(Traditional LP/TG

Content)

Learning objectives, contentoutline, JDTA Links

OCCSTDS dataLearning Objectives/

COI data

CeTARS(Baseline Master

Course Schedules and In-course Traditional Tests populated from AIM I/II, CPM and LO

Module via Web service functions)

Test item data for in-course exams

Existing Interface

JDTA Links

Content structure data for Level 3 surveysTest item data for Level of Knowledge exams

Test item data for in-course exams

CMS Data

Test item data for in-course exams

CBT Authoring

Tool(s)(ILE self-paced

content objects)

Self-paced authoring tool

Prelim Design

Data

Final Content

Data

Job Duty TaskAnalysis (JDTA) data

Initial OCCSTDS data for fleet

validation OCCSTDS survey results

Note: Data interfaces with Perception via tailored implementations of Perception API (hopefully)

Analysis/Validation of Fleet Data

Fleet validated OCCSTDS data

Rev A – 5 Mar 10

Page 5: AIM/CPM Briefing & Demo

Demonstration of ExpandedDemonstration of ExpandedVideo Help ToolsVideo Help Tools

• Support for AIM I, AIM II, CPM, and LO Module

• Demonstrationhttp://aim.aimertech.com/AIM/MainPage.ashx

Page 6: AIM/CPM Briefing & Demo

NAVEDTRA 136 Impacts on CPM / NAVEDTRA 136 Impacts on CPM / LO ModuleLO Module

• Need to re-evaluate and prioritize existing functional requirements based on ILE process changes.

• Re-write has created a need for additional functionality to meet– Design Strategy (IMDP/LSR)– Analysis– Potentially, FEA, BCA, Surveillance and

other issues

Page 7: AIM/CPM Briefing & Demo

MT Continuum Impacts on CPM / MT Continuum Impacts on CPM / LO ModuleLO Module

• Live version of the CPM/LO Module FRM and show:

– Items completed

– Items pending

Page 8: AIM/CPM Briefing & Demo

Questions?Questions?

Page 9: AIM/CPM Briefing & Demo

BackupBackup

Page 10: AIM/CPM Briefing & Demo

Summary of AIM I/II ACRS in Rel 5.0Summary of AIM I/II ACRS in Rel 5.0

Modify AIM I/II to standardize the discussion points for introduction: (Establish contact, introduce yourself and give any background that might be of interest, establish readiness, motivating statements, tell the trainer why he or she needs to know the lesson material, tell the trainee How he will Use the course material, and Safety) in the front matter of the LP.

ACR AIM-II-1998-260

When IMPORTING a Training Path System (TPS) or Course, AIM I checks the contents of 'included PPP tables' with tables currently in the database; however, whenever a difference is detected, the import process terminates with the error message "Line items differ for PPP <name> Rev _ Change _, cannot import". Determining where/what the difference is can be a time consuming process but has to be performed if the difference is to be corrected. The Contractor shall modify AIM I to have the error message include the location (e.g., the Personnel Performance Profile (PPP) line item number) where the difference was detected. Additionally, the import process shall continue comparing line items until either the end of the PPP table or differences in 10 line items have been detected. AIM I shall then terminate the import process and display the expanded error message.

ACR AIM-I-2000-014

Development and maintenance of the Exercise Controller Guide (ECG) is currently not supported in AIM. The Contractor shall implement an ECG Module in AIM I/II as an option for development following the development of the Training Course Control Document (TCCD). The ECG shall support the Lesson Plan (LP) or stand alone as guidance for the instructor and ensure consistency of the learning objectives throughout curriculum.

ACR AIM-I-2000-004

Requirement Description ACR

Page 11: AIM/CPM Briefing & Demo

Summary of AIM I/II ACRS in Rel 5.0Summary of AIM I/II ACRS in Rel 5.0(contd)(contd)

Linking to folders within the IMI category of the Site RRL in traditional AIM IACR AIM-I-2004-002

The Contractor shall change the import function in both AIM I/II to determine if the importing course exists in importing database earlier in the process than such check currently occurs. If the course already exists in the importing database, AIM shall ask the user if he/she wants to replace the existing course.

ACR AIM II-2000-485

The Contractor shall use the Split Unit/Topic functionality from the COI screen in AIM II to enable the following functionality:-       User clicks on first EO to be joined-       clicks on “Join EO”-       a new window comes up that allows the user to select the applicable EO from the list of ALL EOs (even those from other TOs)-       user performs the Join function as usual (possibly more than one at a time)

ACR AIM-II-2008-656

The Contractor shall modify AIM I/II to permit the user to associate RIA with Notes or  Cautions. The user shall be able to move lower level DPs created after Notes/Cautions.

ACR AIM-II-1999-420

Requirement Description ACR

Page 12: AIM/CPM Briefing & Demo

Summary of AIM I/II ACRS in Rel 5.0Summary of AIM I/II ACRS in Rel 5.0(contd)(contd)

The Contractor shall modify the message in the AIM II CTTL to advise the user as to which LOs will be affected by selecting Rebuild LOs.

ACR AIM-II-2000-475

The Contractor shall modify AIM I/II to add the capability to update the TCCD with newer info when the Training Project Plan (TPP) is locked after the first time.

ACR AIM-II-2000-511

The Contractor shall modify AIM I/II to allow the user to remove an RLL from CTTL as easily as it was added. ACR AIM-II-

2000-518

The Contractor shall modify AIM I/II so that when the user is adding the document name for Job Sheet input (References), he/she need only double click on the document block and have the program automatically call up the course RRL.

ACR AIM-II-2000-525

Requirement Description ACR

Page 13: AIM/CPM Briefing & Demo

Summary of AIM I/II ACRS in Rel 5.0Summary of AIM I/II ACRS in Rel 5.0(contd)(contd)

The Contractor shall modify AIM I/II to save graphics in their native file format vs. converting before saving in the graphics library.

ACR AIM-II-2001-577

The Contractor shall add a notes field to the Manpower section in the TPP for AIM I/II. ACR AIM-II-

2001-578

The Contractor shall modify AIM I/II to provide users the option to turn Lesson Plan IMI preview on or off. ACR AIM-II-

2003-628

The Contractor shall modify AIM I/II create and maintain performance tests. ACR AIM-II-2004-642

Requirement Description ACR

Page 14: AIM/CPM Briefing & Demo

Summary of AIM I/II ACRS in Rel 5.0Summary of AIM I/II ACRS in Rel 5.0(contd)(contd)

The Contractor shall modify AIM I/II so that the Testing Module Testing Plan allows enough text in the fields to copy and paste the Testing Plan outline, and Written Progress Test information from pages 2 - 4 of the 1540C sample package.

ACR AIM-II-2006-651

The Contractor shall develop a document that defines software tools and implementation options that support TG printing to PDF and support NAWCTSD staff in evaluating those options with various members

ACR AIM-II-2002-614

Development and maintenance of high risk documents is currently not supported in AIM. The Contractor shall implement an Associated Curriculum Documents (ACD) Module in AIM I/II as an option for development following the development of the Training Course Control Document (TCCD). The ACD shall support the Lesson Plan (LP) or stand alone as guidance for the instructor and ensure consistency of the learning objectives throughout the curriculum. The ACD functionality shall support authoring and administration of high risk training documents to address NSW unique curriculum documents per paragraph 2.1.3 of SOW for DO 0069.

White paper to AIM Pgm

Mgr for NSWC

Coronado requirement

Implement business rules/processes (additional user priviilege levels) to support the migration process and subsequent management of AIM data in the centralized CNATT AIM environment.

FD on user privilege

levels provided by

Requirement Description ACR

Page 15: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

The CPM shall provide a workflow capability to facilitate approval of Navy Learning Objective Statements (NLOSs) for content development projects. Individual or bulk approval.

4.2.3.2

As NLOSs are built and approved, the CPM shall mark the mappings between NLOSs and Skills data as draft and completed respectively.

4.2.3.3

NLOSs shall be searchable within the CPM. 4.2.3.16

An NLOS shall be searchable on its Components. (For example, search all LOSs beginning with the verb “align” or search all NLOSs with the system “AN/BQN-17 SONAR SOUNDING SET.”)

4.2.3.17

Search results shall display NLOSs. 4.2.3.25

Users shall be able to select NLOSs from Search results to see detailed information. 4.2.3.26

Requirement Description FRM

Page 16: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

NLOS versioning and life-cycle maintenance based on changes to any of the authoritative data sources on which NLOS was originally built will be implemented.

4.2.3.29

Include capability to build an NLOS from an existing NLOS reusing the verb, object combination and maintaining existing links to skill/performance data.

4.2.3.41

CPM will provide NLOS metadata (i.e., Skills data) defined and captured in CPM to the EDE 4.2.4.7

NLOSs shall be provided via web services to EDE 4.2.4.8

The CPM shall have the capability to store degree of simulation 4.2.5.53

The CPM shall have the capability to store frequency of testing 4.2.5.54

Requirement Description FRM

Page 17: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

The CPM shall have the capability to store test and layout conventions 4.2.5.117

The CPM shall have the capability to store info on the descriptions of the types of personnel and their respective roles and responsibilities for lesson development

4.2.5.143

A project will support creation of Modification/Cancellation TPPs once the original TPP is approved. 4.2.5.171

CPM will have an RRL Category titled PC Simulation that will allow for text entries only similar to the Software Category 4.2.6.182

CPM will have the capability for All manpower to print in the TPP and TCCD even if civilian, officer, and enlisted are zeros. 4.2.6.183

CPM will have the capability for adding “NETC Post Pilot Report Approval” as default to the milestones. 4.2.6.184

Requirement Description FRM

Page 18: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

CPM will have the capability to export Milestones to MS Project 4.2.6.185

CPM will have the capability to import Milestones from MS Project 4.2.6.186

CPM will have the capability to Import spreadsheets into Training Site Funding 4.2.6.187

Users will have access to definitions and samples of the 5 content types while selecting EOS content type. 4.2.8.4

CPM shall support the filterable reporting of learning content that has been superseded or deprecated by changes in Level 1 or 2 Skills data.  

4.2.9.1

CPM shall report on cross-Center utilization of developed content. 4.2.9.3

Requirement Description FRM

Page 19: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

CPM shall report NLOSs linked to changed Level 1 and Level 2 data as the basis for life-cycle maintenance of the NLOSs and linked to their related learning objects.

4.2.9.4

CPM shall allow users to create a report of mapped skill data to learning objectives through user chosen time frames. (For example, report for the last xdays, xweeks, or from xdate to xdate.)

4.2.9.8

Will also include reports that: Show Lessons and Sections which were built using "Unassigned" and Show Tasks not included in a course.

4.2.9.12

CPM will provide "Flag Related Materials" functionality similar to AIM by allowing a user to select a piece of NJA data and flag the associated links to elements of the COI

4.2.9.15

CPM will provide a report that lists and prints "Status of Elements Within a Project" that will list the status of all modules, lessons, and sections within a project.

4.2.9.17

CPM will provide a report that lists all of a Center's NJA data and associated support objects (C/M/L/S, OJT, EPSS, CIN, etc) that have been built with an option to show NJA data with no support objects built.

4.2.9.18

Requirement Description FRM

Page 20: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

CPM shall support the filterable reporting of NLOS that have been superseded or deprecated by changes in Level 1 or 2 Skills data.

4.2.10.2

CPM shall contain a fully functioning KSAT editor. 4.2.10.6

Users shall be able to search for NLOSs based on verb, object, condition or standard data to identify skill data appropriate to link to COI data

4.2.10.17

CPM will support NETC Job, Duty, Task, Analysis (JDTA) model 4.2.10.25

Ability to spell check lesson. 4.2.2.16

Ability to spell check section 4.2.3.15

Requirement Description FRM

Page 21: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

Spell check module data entries. 4.2.8.14

Spell check course data entries. 4.2.8.22

The AIM LO Module will have the capability to compare different versions of ILE projects with the same functionality as the LP/TG Content Comparison Report. It should be able to determine if any text, graphic, or RRL item has changed, and should also be able to compare different versions of IETMs selected in the different versions of the ILE projects. In addition, if any Skills data has been modified, which was used to create any of the terminal or enabling objectives in the project, the Content Comparison Report should indicate the change.

4.2.5.6

The LO Module will have the capability to generate Content Comparison Report with manual printing of change packages 4.2.13.1

CPM shall support NETC Job, Duty, Task, Analysis (JDTA) model as implemented in the final NETC JDTA instruction 4.2.10.25

CPM shall warn a user when exiting a modified screen if they want to save their work before exiting. 4.2.2.42

Requirement Description FRM

Page 22: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

CPM shall allow only 1 user to edit a single element (field) in the database and warn users that try to access an element being edited with a message "Element is being edited, can only view". CPM shall lock and notify of additions/changes to data while someone else is working in that same element in CPM.

4.2.2.43

CPM users shall have capability to use defaulted verb/skill data for building TOS. 4.2.3.34

CPM shall have the capability for tracking "Contractors" category in the TPP and TCCD Manpower area. Contractors category data will print on the TPP and TCCD even if the numbers are zeros. Contractors category is in addition to Civilian, Officer, and Enlisted categories.

4.2.6.188

Changes in CPM to items that have been approved shall result in flagging of associated Course, Module, Lesson and Section in CPM project, notification to Project Owner for impacted Course, Module, Lesson and Section (under assignments or messages on their home page), and flagging of associated Course, Module, Lesson and Section in LO Module when project is exported again or update from EDE (or similar function) is run.

4.2.10.23

The LO Module shall have the ability for users to define, for each element, the spacing to occur before the printing of the next element. This allows the developer to put in a large enough gap between elements (DPs) for instructors to add their own personalization.

4.2.3.17

Requirement Description FRM

Page 23: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

implement "Select All" functionality when selecting JDTA data for a project in CPM 4.2.2.41

implement the ability to reuse a module/lesson/section in another CPM project. When that new project imports to an LO Module database, the correct Module/Lesson/Section is reused (assuming it exists in that database)

4.2.6.15

implement the capability that when entering Standards, the user will have the capability to pull up the Publications list from RRL and select items using a checkbox

4.2.10.31

implement the functionality that all checkbox areas will have a "Select All" box at the top of the list 4.2.10.32

implement the functionality that when entering Skill Items after saving, the user will be able to add another item at the same level (so if he saves a Task, he can add another Task without having to go up a level and select Duty and New.)

4.2.10.33

Requirement Description FRM

Page 24: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

enable the user to reuse a Skill Item (Duty, Task, Sub-task) in another Skill item. For example, the Duty “Implement Curriculum Materials” is under the Job “Curriculum Developer” but could also be under another Job “Training Manager”. The user doesn’t want a new duty but recognizes that this duty is performed by more than 1 job. Similarly, a task could fall under by more than 1 duty

4.2.10.34

implement the capability to copy Section elements to a new Section or within a Section 4.2.3.19a

enable automatic numbering at the element level so the user doesn’t need to use the title field for this information 4.2.3.20a

provide for resources (RRL Items) entered in CPM Project to be web-serviced to LO Module on course import 4.2.4.18

implement the ability for the user to Replace a Resource (as in AIM I/II) 4.2.14.1

enable auto-population of the title of the Module, Lesson, and Section with the JDTA Skills item name if it is selected as the skills basis

4.2.6.14

Requirement Description FRM

Page 25: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

implement the ability to link or move an existing Module/Lesson/Section within an existing Course/Module/Lesson or to another Project's Course/Module/Lesson

4.2.6.16

enable CPM to provide a report that lists and prints "All Exports Available for Import Into AIM LO Module" 4.2.9.16

modify CPM so that only approved items may be selected as a “Skill Basis” for a Module, Lesson or Section in the project tab of CPM (and therefore potentially exported to EDE as part of an approved project) Items are considered approved if: they are part of the original population, from authoritative database, from spreadsheet authorized by learning center, have been entered and

4.2.10.21

add a link to the O*NET Online site http://online.onetcenter.org/ near the DOL/ONET Occupation field on the same tab 4.2.10.30

develop a detailed design of the capability for a “recently used” list for conditions, standards and task source items. So that the last 10 (or so) items are displayed and available to choose from or you can select a see all box (or some other way of the user controlling).  The capability is designed to speed selection of items during JDTA process

4.2.10.35

modify CPM so that when user is entering multiple Resources into the LO Module, CPM shall open back up to the last resource that was selected instead of forcing the user to navigate through the IETM tree again

4.2.3.21a

Requirement Description FRM

Page 26: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

modify the LO Module to have the capability for capturing Trainee Prep information similar to the data captured in traditional AIM. Trainee Prep shall print on the Lesson Plan in all LO Module views

4.2.8.23

modify the LO Module to enable updating Course/Module/Lesson  structure and content without losing element content.  Running update may add and/or remove Lessons/Sections to reflect new structure and a warning should be given

4.2.8.24

duplicate in CPM existing JDTA tab functions into an OCCSTDS tab. N/A

modify JDTA-specific functions duplicated in the new OCCSTDS tab to support OCCSTDS specific business processes/rules as defined by NAVMAC and as coordinated with the AIM team

N/A

add additional functionality to the new OCCSTDS tab as requested by NAVMAC and as coordinated with the AIM team N/A

create the capability in CPM Rel 5.0 to generate data outputs from the new OCCSTDS tab for import into the Navy’s Learning Assessment System (LAS) QuestionMark Perception

N/A

Requirement Description FRM

Page 27: AIM/CPM Briefing & Demo

Summary of CPM/LO Module Summary of CPM/LO Module Enhancements in Rel 5.0Enhancements in Rel 5.0

(contd)(contd)

develop a detailed design for implementation of Front-end Analysis (FEA) support in CPM in accordance with NETC Instruction 1500.6.

N/A

develop a detailed design for implementation of Business Case Analysis (BCA) support in CPM in accordance with NETC Instruction 1510.3

N/A

Requirement Description FRM