Presenter comments and opinions may not reflect views and opinions of BACnet International. Presentation is property of BACnet International and cannot be reproduced without permission .
BACnet to
the Rescue! Steve Tom
Director of Technical Information, Automated Logic Corporation
Page 2
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 2/18
Banner Bank Building
• LEED NC Platinum core & shell
– 1’st Platinum in Boise ID
– 1’st Platinum spec office bldg – 19’th Platinum in the world
• BACnet Controls!
• Modeled energy 50% of 90.1
• 60% less water use
• Cost no more to build
www.BACnetInternational.org
Page 3
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 3/18
Banner Bank Details
• 11 Story Bldg - 195,000 SF
• $25 Million Construction Cost
– $128/SF – Leases comparable with existing 20 +
year old buildings
• Lighting control with Daylight Harvesting
– 65% less lighting load
• Modeled Energy Use = 41% of conventional bldg
Page 4
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 4/18
Major HVAC Systems
Geothermal Heat
Efficient AHU
Efficient Chiller
Weather ForecastPrecool
Demand Controlled Ventilation
Underfloor Air Distribution
Page 5
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 5/18
Problems
• Zones didn’t communicate with AHUs
– AHU’s manually adjusted
• AHU’s didn’t communicate with supply – Chillers & Geothermal ran in stand-alone mode
• Everything set to meet “worst case” needs
• Energy use significantly over budget
• Occupant complaints about comfort
Page 6
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 6/18
What Went Wrong?
•
Contract dispute over integration – Specified how equipment should operate – not how
equipment should work together as a system
– Multiple vendors: Who should do integration?
– Specs did not include enough detail on commissioning
• Primary controls contractor left project!
Page 7
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 7/18
Now What?
• New contractor hired for integration
– Associated with different vendor’s control products – Only accepted job because it was BACnet
• Surveyed building to find problems
– Reviewed plans, specs, as-builts, and actual construction
• Studied LEED Requirements
• Built a plan to Integrate Equipment into Systems
Page 8
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 8/18
Integration Strategies
• Trim and Respond – AHU provides, say, 60˚ air at start-up
• Zones request cooler air if above cooling setpoint
– AHU Responds by dropping temp, say, 0.5˚
• No request for 5 min? Raise temp, say 0.5˚
– Chiller adjusts temp based on requests from AHUs
– Adjust hot water supply temp similarly
– Also works with VAV Static Pressure Reset
Page 9
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 9/18
Integration Strategies
• Morning Start-Up
– Stand-alone: AHU starts, say, 2 hrs before occupancy – Integrated: Zones tell AHU when to start
• Based on model of how fast system can heat or cool zones
• Zones “learn” heating and cooling capacity over time
• Net Result: wait until last minute to turn on AHU
– Mild weather: turn on just before occupancy
– Very hot or very cold: turn on early
• Optimum Stop
– Turn chiller off early & “coast” on cold water in system.
Max Cool
Max Heat
Zone Temp
Page 10
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 10/18
Integration Strategies
• Night Purge with Morning Precool – Read weather forecast into control system
• BACnet Web services can bring in weather forecast
– Superventilate with cool OA during start-up
• Forecast above 70˚: Cool building to 70˚
• Forecast above 75˚: Cool building to 68˚
• Forecast above 80˚: Cool building to 66˚
– Requires coordination between AHU and Zones
Page 11
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 11/18
Results
• Integrated approx. 3,000 BACnet Points in 4 Months
– BACnet Discovery made this possible
• Geothermal use dropped 45%• Electrical consumption dropped 6-9%
– Includes 5 data centers, high-density tech offices
• Operating expense $1.12/SF
– Comparable local buildings $1.30 to $1.50/SF
• Occupant compliments replaced complaints
– One of highest occupancy & retention rate in area
– Occupancy grew from 90% to 99%
Page 12
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 12/18
Results (Con’t)
Page 13
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 13/18
Results (Con’t)
Page 14
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 14/18
Results (Con’t)
Page 15
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 15/18
Lessons Learned
• BACnet Works “As Advertised”
– Multiple vendors devices integrated
into one system – Able to switch primary controls contractor
• BACnet is “Necessary but not Sufficient”
– Makes integration possible, doesn’t guarantee success
– Need to specify what will be integrated & by whom• Need point lists, sequences of operations, etc.
• ASHRAE Guideline 13 & CtrlSpecBuilder can help
Page 16
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 16/18
• Need to specify how system performs
– Go beyond stand-alone equipment sequences
– How do zones affect AHU’s, chillers, etc. – Optimize overall system performance
• Controls and contractors are not commodities
– Have different strengths and weaknesses
– Pick best combination for your project
Lessons Learned (con’t)
Page 17
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 17/18
Most Important Result
• Owner happy with building
– Success depends on having someone
who’s willing to say “I want to see thisoperate the way it’s supposed to” insteadof “I want to get paid and move on to thenext job.”
– Would definitely use BACnet on another
project. “That’s the standard for allsystems going foreword. Openstandards are critical to making thingswork.”
Page 18
8/6/2019 AHR Expo - BACnet to the Rescue
http://slidepdf.com/reader/full/ahr-expo-bacnet-to-the-rescue 18/18
BACnet to the Rescue!
Questions?