Top Banner
LeTOURNEAU HULL NO. 244 V351 INCLINING AGENDA COPYRIGHT 2014 CAMERON INCLINING AGENDA FOR SELF-ELEVATING MOBILE OFFSHORE DRILLING UNIT V351 LeTOURNEAU HULL No. 244 FOR GREAT OFFSHORE, LTD. CAMERON 3110 H.G. MOSLEY PKWY LONGVIEW, TEXAS 75605
58

Agenda for Inclining Experiment of a Jack Up Rig.

Oct 02, 2015

Download

Documents

Rupesh Kumar

A complete procedure of an Inclining Experiment for a Jack up rig with all the checklists, Preparation for the test and the calculations envolved.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON

    INCLINING AGENDA

    FOR SELF-ELEVATING MOBILE OFFSHORE DRILLING UNIT

    V351 LeTOURNEAU HULL No. 244

    FOR

    GREAT OFFSHORE, LTD.

    CAMERON

    3110 H.G. MOSLEY PKWY

    LONGVIEW, TEXAS 75605

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE i

    TABLE OF CONTENTS

    PAGE:

    INTRODUCTION 1

    1. SCOPE 1

    2. TERMINOLOGY 1

    3. SIGNIFICANCE AND USE 2

    4. PRE-STABILITY TEST PREPARATION 3

    5. TEST WEIGHTS 4

    6. DEADWEIGHT SURVEY 5

    7. INCLINING PROCEDURE 8

    8. DRILL PACKAGE WEIGHT VERIFICATION 12

    APPENDICES

    APPENDIX A EQUIPMENT / RESPONSIBILITY CHECK LIST

    1. EQUIPMENT A-1 1.1 Field Engineering 1.2 Design Engineering

    2. RESONSIBILITIES A-2 2.1 Field Engineering 2.2 Naval Architect / Engineer in Charge 2.3 Barge Engineer

    APPENDIX B ILLUSTRATIONS

    Figure 1 - Outboard Profile B-1

    Figure 2 - Innerbottom Layout B-2

    Figure 3 - Machinery Deck Layout B-3

    Figure 4 - Main Deck Layout B-4

    Figure 5 Punch Mark Detail B-5

    Figure 6 - Pendulum Arrangement B-6

    Figure 7 - Pendulum Details B-7

    Figure 8 Incline Trough B-8

    Figure 9 - Pendulum 1 Hanger Detail B-9

    Figure 10 - Pendulum 2 & 3 Hanger Detail B-10

    Figure 11 - Shift Positions for Drill Package Plan View B-11

    APPENDIX C HYDROSTATICS C-1

    APPENDIX D FORMS

    Witnessing Personnel D-1

    Dry Weight Schedule D-2

    Tank Sounding Schedule D-8

    Drill Package, Leg & Crane Positioning Schedule D-11

    Drill Package Weighing Data Sheet D-12

    Freeboard Reading Data Sheet D-13

    Incline Experiment Data Sheet D-14

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE ii

    APPENDIX E LOADOUT CALCULATIONS

    Loadout Details E-1

    Loadout Summary at Position 0 E-5

    Stability, Trim and Heel Summary at Position 0 E-6

    Loadout Summary at Position 1 E-7

    Stability, Trim and Heel Summary at Position 1 E-8

    REVISIONS

    REV. NO. DATE DESCRIPTION BY 0 5/25/2011 Released to Shipyard JAG

    1 6/13/2011 Subbase changed to Drill Package (7) JAG

    2 10/7/14 Modified to a Block Movement Incline JAG

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 1

    Introduction

    This document provides guidance and general information for design and field

    engineering as well as owner and regulatory representatives involved in the

    stability test. It contains procedures for conducting the stability test in order

    to ensure that valid results are obtained with maximum precision at a minimal

    cost. A complete understanding of the procedures used to perform the

    stability test is imperative in order to ensure that the test is conducted properly

    so that results can be examined for accuracy during the execution of the

    inclining experiment.

    1. Scope

    1.1 The purpose of the stability test is to determine the vessels lightship characteristics. The stability test can be considered to be three separate tasks;

    the certification of incline weight, the deadweight survey, and the inclining

    experiment. The stability test is required upon the vessels completion or

    major conversion. This test is to be completed inshore in calm weather. The

    four (4) lightship characteristics determined from the stability test for

    MODUs are displacement (displ), longitudinal center of gravity (LCG),

    transverse center of gravity (TCG), and the vertical center of gravity (VCG,

    KG).

    2. Terminology

    2.1 Definitions:

    2.1.1 Inclining Experiment involves moving certified weights in the transverse direction, and then measuring the resulting change in

    equilibrium heel angle of the vessel. Using the acquired data and

    applying basic naval architecture principles, the MODUs vertical

    center of gravity (VCG, KG) is determined.

    2.1.2 Light Ship is the weight of the vessel with all equipment and outfit items installed. It excludes consumables, stores, cargo, crew, their

    effects and liquids. Liquids included as lightship are machinery fluids,

    such as lubricants, hydraulics, and cooling fluid. All machinery, fresh

    water, and fire main systems are in the operating condition.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 2

    2.1.3 Lightweight Survey involves taking an audit of all the items which must be added, deducted, or relocated on the vessel at the time of the

    stability test so that the observed condition can be adjusted to the

    lightship condition. The weight, longitudinal, transverse, and vertical

    locations of each item must be accurately determined and recorded.

    The static waterline of the vessel at the time of the stability test shall

    be determined by measuring the freeboard at verified draft marks. The

    lightship displacement, as well as longitudinal and transverse centers

    of gravity can be obtained using the previous information, the vessels

    hydrostatic data, and the sea water density.

    2.1.4 Slack tanks tanks that contain liquid during the stability test. The use of slack tanks should be kept to a minimum during the stability

    test. Those tanks that are required to be used should comply with the

    following guidelines:

    (a) Full depth tanks and mud pits should be between 20% and 80% full.

    (b) All other tanks should be between 40% and 60% full.

    Tanks with soundings that are outside of the range described above

    will be assumed to have zero free surface effect. Assuming a zero free

    surface effect negatively impacts the overall KG result.

    3. Significance and Use

    3.1 From the lightship characteristics one is able to calculate the stability characteristics of the vessel for all conditions of loading, and thereby

    determine whether the vessel satisfies the applicable stability criteria. Results

    from the stability test may in some cases determine the future survival of the

    vessel and its crew, so the accuracy with which the test is conducted cannot

    be overemphasized. The condition of the vessel and the environment during

    the test is rarely ideal and consequently, the stability test is infrequently

    conducted exactly as planned. If the vessel isnt 100% complete, the weather

    isnt perfect, there is water or trash in a tank that was supposed to be clean

    and dry, etc., then the Naval Architect must make immediate decisions as to

    the acceptability of variances from the plan.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 3

    4. Pre-Stability Test Preparation

    4.1 Three months prior

    4.1.1 Strip all unused tanks starting immediately after preloading for leg-up.

    4.2 One week prior

    4.2.1 Meet with the barge engineer(s) to be on duty during the stability test and cover the following issues:

    (a) Safety issues

    (b) Test Schedule

    (c) Overview of the test

    (d) Variable load allowance.

    (e) Determine the anticipated liquid loading for the test. Preferably, all tanks should be empty. Number of slack tanks

    shall be kept to a minimum and be maintained in accordance

    with 2.1.4.

    4.2.2 Walk the rig and make preliminary preparations. Conducted by Cameron personnel and the Barge Engineer(s).

    4.2.3 Ten (10) freeboard reference marks are to be punched or painted on the hull prior to the incline. Punch mark locations, height (above

    molded baseline) and distance (aft of bow) are to be verified and

    recorded on Form D-13. See drawing 244-145-01 R0 for details of the

    markings.

    4.2.4 A preliminary audit of weights to add, deduct, and transfer in the quarters, mezzanine, and machinery deck levels shall be conducted.

    4.2.5 Removal of mud from the top of the spud cans should be started as soon as possible. Open the spud can covers to allow free flooding of

    the spud cans.

    4.2.6 Verification of equipment operation and supplies for the test should be undertaken.

    4.2.7 Regulatory bodies shall be notified of the test date and time.

    4.3 Three days prior

    4.3.1 Prepare for weight certification of inclining weights.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 4

    4.3.2 Verify that the inclining weights are located and the operators are prepared to make the appropriate shifts. A total of 20 weights

    weighting about 10 MT each shall be transferred transversely across

    the unit in the vicinity of Frame 16.

    4.3.3 Start preliminary set-up of incline experiment equipment.

    4.3.4 Take a complete audit of drill package variable load.

    4.4 Two days prior

    4.4.1 Provide assistance in the weighing of the inclining weight (drill package). (Reference Section 5)

    4.4.2 An audit and weighing of main deck variable to be on board during the test shall be conducted.

    4.5 One day prior

    4.5.1 Record the tank soundings and densities of liquid variable.

    4.5.2 A tank inspection with regulatory representative shall be conducted.

    4.5.3 Remove construction equipment, trash, and unnecessary cargo.

    5. Test Weights

    5.1 Like a ship-shaped vessel, this unit will heel under the influence of a known transverse moment shift during the stability test. A certifying authority will

    individually weigh the 20 test weights to be used to induce the moment shift.

    These weights will be sufficient to induce at least 1 degree of heel to each

    side of upright.

    5.2 A crane of sufficient capacity & reach, or some other means, must be available during the stability test to shift weights on the deck in a safe

    manner.

    5.3 The test weights shall be on board and in place prior to the scheduled time of the stability test.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 5

    6. Deadweight Survey

    6.1 Introduction

    6.1.1 The deadweight survey shall be conducted immediately preceding the incline. The shipyard and ABS shall survey the unit with the assistance

    of the owner. Some items in the survey may require completion after

    the incline.

    6.1.2 The deadweight survey is an audit of all items. The audit is to clearly identify the variable weight and its longitudinal, transverse and vertical

    centers of gravity (LCG, TCG and VCG, respectively). All audited

    items are to be categorized as items to add, deduct, or transfer.

    6.1.3 The as surveyed condition of the vessel is the displacement and center of gravity of the vessel at the time of the stability test. It is

    determined by measuring the freeboards from the predetermined punch

    marks, calculating the mean draft, comparing it to the vessels

    hydrostatic data, and incorporating the variable (deadweight), its

    respective LCG, TCG, and VCG and the sea water density.

    6.2 Scope

    6.2.1 This section provides information for determining items which need to be added to the vessel (weights to add), removed from the vessel

    (weights to deduct), or relocated (weights to transfer) on the vessel to

    bring the vessel to the lightship condition.

    6.2.2 This section also provides information on the draft measurement operation.

    6.3 Equipment

    6.3.1 Microcomputer This shall be used for the spreadsheet tally of audited items.

    6.3.2 Water Sampler A water sampling bottle shall be used for sampling water at any depth.

    6.3.3 Hydrometers Thick-walled glass tube comprising a graduated scale for determination of a liquids specific gravity.

    6.3.4 Anemometer/weather vane shall record wind speeds/directions for the duration of the Lightship Survey and Inclining Experiment.

    6.4 Lightship Survey

    6.4.1 Preliminary audit of the vessel shall be held one week prior the scheduled test.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 6

    (a) It is recognized that the weight of some items, either on board or that are to be added, may have to be estimated. If this is

    necessary, conservative estimates should be obtained using the

    following rules of thumb:

    When estimating weights to be added:

    i. estimate high for items to be added high in the vessel.

    ii. estimate low for items to be added low in the vessel.

    When estimating weights to be removed:

    i. estimate low for items to be removed from high in the vessel.

    ii. estimate high for items to be removed from low in the vessel.

    When estimating weights to be relocated:

    i. estimate high for items to be relocated to a higher point.

    ii. estimate low for items to be relocated to a lower point in the vessel.

    6.4.2 The initial audit shall be updated periodically as items are added, removed, or relocated.

    6.4.3 Verify that all hinged, swinging, or movable items such as crane(s), derrick, travelling block, and doors are secured in their stowed position

    to prevent any shift during the inclination of the vessel. If these items

    are not stowed in the correct locations, they must be listed as weights

    to transfer. The longitudinal position of the cantilever and the

    transverse position of the drill floor during the test shall be determined.

    6.4.4 A record of the length of leg installed and its vertical orientation (tip of can below baseline) shall be made. The spud can tanks shall be free

    flooding during the stability test. Typically this is done by fully

    submerging the spud cans while leaving the top hatch open. If this

    condition is not possible, the free flooding condition of the spud cans

    must be verified in some other way.

    6.4.5 A list of crew and effects shall be supplied for the weight survey.

    6.4.6 All tanks shall be inspected and sounded if necessary just prior to floating the vessel. Initial soundings should be taken with the rig level

    in about 12 feet of draft (the rig will still be partially supported on its

    legs). The Naval Architect along with the Barge Engineer shall

    determine appropriate guidelines for these procedures.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 7

    6.4.7 When the vessel is put into the afloat condition, the Naval Architect shall estimate the vessel draft at the plimsol marks. The preload tanks

    are to be filled as the Naval Architect directs. A sample loadout (see

    Appendix E) is provided for guidance.

    6.4.8 Just prior to the freeboard reading operation, a walk through shall be conducted with the regulatory representatives to verify and sign off on

    the audit.

    6.4.9 A preliminary set of draft readings at the yoke wells shall be taken from the main deck concurrently with the freeboard readings. These

    readings will be compared to a similar set of draft readings made post-

    incline to verify the condition of the vessel remained stable throughout

    the test. See Section 7.5.6.

    6.4.10 Samples shall be taken to determine liquid densities.

    6.4.11 Typical tug line arrangement shall be at the bow and stern of the vessel. The vessel shall be positioned such as to minimize current

    effects when set adrift.

    6.5 Freeboard Readings

    6.5.1 A total of ten (10) freeboard readings shall be made. Use the following procedure for freeboard readings:

    (a) One or two boats shall be used for this operation. A freeboard reader and a regulatory representative shall be in each boat for

    freeboard readings.

    (b) The freeboard readers shall mount the draft tubes unit to the hull. They shall loosen the thumbscrew and slide the dampening tube

    vertically to align the pointer with the punch mark on the side shell.

    (c) The freeboard readers shall report to the control station the elevation of the referenced punch mark.

    (d) When ready the Field Engineer shall prepare the vessel for the drift condition.

    (e) The Field Engineer shall notify the freeboard readers that, Lines are slack.

    (f) Visually record the draft indicated and report this value to the control station. Repeat for each of the ten (10) freeboard locations.

    (g) The personnel from the boats may board the vessel for inclining.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 8

    7. Inclining Procedure

    7.1 Introduction

    7.1.1 This procedure requires skidding known weights transversely (port and starboard) a predetermined distance, and then measuring the resulting

    change in equilibrium heel angle of the vessel. These values are

    applied to calculate the vessels vertical center of gravity (KG). At the

    zero position, heel shall not exceed 0.5 degrees. Trim is expected to

    exceed 1% of the length of the unit, but hydrostatic properties will be

    calculated for the as-surveyed floating condition. The intended

    condition of the unit at the zero position is shown in Appendix E,

    Pages E-1 to E-6.

    7.1.2 The shipyard shall conduct the test. Three (3) pendulums will be used for the inclining experiment. A fourth pendulum shall be used to

    verify the weight of the drill package (see Section 8). All data recorded

    from each device shall be plotted on one curve. The test shall conclude

    with acceptance by the shipyard, ABS and owner representatives.

    Cameron shall conduct preliminary analysis of raw data to ensure

    results are acceptable. Cameron shall later develop the Stability Test

    Report and submit it to ABS for approval.

    7.2 Scope

    7.2.1 This procedure provides general information to ensure that valid results are obtained with maximum precision for accurate

    determination of the vessels KG.

    7.3 Equipment

    7.3.1 Pendulums The pendulum wire should be piano wire or other mono-filament material. The top connection of the pendulum shall have

    unrestricted rotation about the fulcrum. Typically, a washer is used

    with the internal circumference ground to an edge. The pendulum is

    hung from a structural angle with a recess ground to an edge at the

    point of contact between the washer and the angle. A winged plumb

    bob at the end of the wire is submerged in a trough of heavy oil

    (EP220 or Equivalent) to dampen pendulum oscillations. The batten

    board is attached above the trough and allows for recording

    deflections. Windshields shall be installed at the main deck hatches,

    enclosing the pendulum wire. Pendulum lengths should be long

    enough to provide at least six (6) inches of deflection to each side of

    upright during the incline. A 1.08 degree inclination would thus

    require pendulum lengths of 6" / tan(1.08) = 317" measured between

    the fulcrum and top of batten board. Reference 244-145-02 R0 for

    pendulum illustrations.

    7.4 Calibration

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 9

    7.4.1 Pendulums pendulum lengths shall be measured with a steel tape from the fulcrum to the top of the batten board. Zero position on the

    batten board shall be calibrated to the pendulum wire, with vessel

    adrift, and the drill package in the zero (0) position. No other

    calibration is required for this device.

    7.5 Inclining Procedure

    7.5.1 Calculations

    (a) Vessel Characteristics:

    Longitudinal Waterline Length 243.08 Feet

    Beam 206.00 Feet

    Mean Draft* 15.79 Feet

    Displacement* 25475 Kips

    KMT* 151.82 Feet

    KG (uncorrected) 88.11 Feet

    KG (corrected)* 88.53 Feet

    Leg Length 477.00 Feet

    Tip of Spudcan below Hull 10.50 Feet

    Test Weights - Total* 441.03 Kips

    Distance to travel for required heel* 82.60 Feet

    *Values are estimated and are to be reconfirmed prior to the

    Incline Test.

    (b) Required moment to trim 1.08 degrees:

    GMT x Displacement x Tangent 1.08 = Required Moment

    (151.82 88.53) 25475 X 0.0188518 = 30394 Foot-Kips

    (c) Minimum Test Weight Travel for 1.08 Degree Inclination:

    Test Weight Travel = Moment / Weight

    Test Weight Travel = 30394 / 441 * 2

    Test Weight Travel = 137.84 Feet

    (d) Approximate Pendulum Length Required for 12" deflection

    )(26'-6"or "318)08.1(

    "6

    Tangent

    7.5.2 Pre-Incline Checks

    (a) Shipyard personnel shall make a final "tank condition" survey of all tanks. These tank conditions (soundings) shall be recorded as actual

    test data. Day tanks shall be sounded at the time of the incline.

    (b) The general weather conditions including wind speed, wind direction and ambient temperature shall be taken. These shall be

    recorded. The vessel shall not be inclined during inclement weather

    nor during winds exceeding 12 knots (14 mph) less if gusting.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 10

    (c) Two people shall be at each device station. The Naval Architect and other(s) shall be at the control station recording and plotting data.

    (d) The pendulum wires for all four pendulums shall be properly aligned and accurately measured. The unit shall be afloat and all

    mooring lines slack during the alignment.

    (e) Leg positions and free flooding of the spud cans shall be verified.

    (f) All tanks in use shall be sounded before and after the incline process.

    (g) Computer equipment shall be operating and ready.

    (h) Clear communication to each station shall be verified.

    7.5.3 Procedure

    (a) The incline experiment may begin when the vessel is positioned up river, all pre-incline checks complete, inclining personnel are in

    position, and control of the vessel is maintained at all times.

    (b) The Field Engineer shall instruct the tugs to slack lines and allow the vessel to drift.

    (c) Field Engineer shall notify the Naval Architect that, lines are slack.

    (d) Naval Architect shall start the procedure and radio to all stations, Stations report when ready.

    (e) Pendulum readers shall observe the fluctuation of the wire (Pendulum) until a stationary reading is obtained. When a

    stationary reading is achieved station one (1) shall report first,

    Station 1 ready.

    (f) If any station does not report, Ready, within a set time limit, then the Control Station may request that station to report its status:

    Station #, whats your Status? The station shall report total

    measurement fluctuation in fractional units: Station # reporting a

    fluctuation of in. At the discretion of the Naval Architect he or

    she may request that station to, Stand-By.

    (g) If an instrument is slow to dampen the Naval Architect may deem it necessary to ask this station to prepare to take the average of the

    measurement fluctuation.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 11

    (h) When all stations are confirmed, Ready, the Naval Architect shall give the following command: All Stations mark, (pause),

    This is position zero.

    (i) All stations, starting with Station 1, shall report readings to the control station. (Not Required for Position 0)

    (j) If a station was asked to average readings, then the reader should report it as an averaged value: Station # (the reading) Averaged.

    (k) This is the end of the zero position operation. The Naval Architect shall instruct the crane and rigging operators to proceed to Step

    1. See Section 7.5.4 for a list of steps.

    (l) Sections (d) through (k) shall be repeated until all steps are complete. See Section 7.5.4.

    (m) If a reading excessively deviates from the curve, it may be necessary to repeat the step.

    7.5.4 Following the initial zero reading, the experiment will involve eight weight shifts as follows:

    STEP 0: Mark Position 0 and label Port & Starboard on either side

    of all pendulums.

    STEP 1: Transfer the weights P1, P2 and P3 from port side to

    starboard side. P1 and P2 will be set upon S1 and S2,

    respectively. P3 will then be set on P1.

    Mark Position 1 on all pendulums.

    STEP 2: Transfer the weights P4, P5, P6 and P7 from port side to

    starboard side. P4 will be set on P2. P5 and P6 will be set

    on P3 and P4, respectively. P7 will be set on P5.

    Mark Position 2 on all pendulums.

    STEP 3: Transfer the weights P8, P9 and P10 from port side to

    starboard side. P8 will be set on P6. P9 and P10 will be set

    on P7 and P8, respectively.

    Mark Position 3 on all pendulums.

    STEP 4: Transfer P1, P2, P3, P4, P5, P6, P7, P8, P9 and P10 back to

    the initial 0 position (starboard to port).

    Mark Position 4 on all pendulums.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 12

    STEP 5: Transfer the weights S1, S2 and S3 from starboard side to

    port side. S1 and S2 will be set upon P1 and P2,

    respectively. S3 will then be set on S1.

    Mark Position 5 on all pendulums.

    STEP 6: Transfer the weights S4, S5, S6 and S7 from starboard side

    to port side. S4 will be set on S2. S5 and S6 will be set on

    S3 and S4, respectively. S7 will be set on S5.

    Mark Position 6 on all pendulums.

    STEP 7: Transfer the weights S8, S9 and S10 from starboard side to

    port side. S8 will be set on S6. S9 and S10 will be set on

    S7 and S8, respectively.

    Mark Position 7 on all pendulums.

    STEP 8: Transfer S1, S2, S3, S4, S5, S6, S7, S8, S9 and S10 back to

    the initial 0 position (port to starboard).

    Mark Position 8 on all pendulums.

    7.5.5 The stability test shall be witnessed and carried out to the satisfaction of the ABS representative. Upon completion, a copy of all the raw data

    acquired during the tests shall be prepared and presented to these

    representatives.

    7.5.6 After the stability test, another set of soundings will be made of those tanks that were actively used during the test (i.e. the Fuel Oil Day

    Tank). These results will be averaged with the soundings taken

    immediately before the freeboard readings commenced.

    7.5.7 After completing the stability test, a set of draft readings at the yoke wells shall be taken from the main deck. The readings will be

    compared with the draft readings taken during the freeboard readings

    to verify the position of the rig remained stable throughout the test.

    See Section 6.4.9.

    7.5.8 A final Incline Experiment and Deadweight Report shall be prepared and submitted to ABS for review and approval.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    PAGE 13

    8. Drill Package Weight Verification

    8.1 Procedure

    8.1.1 After completing the incline, the weight of the drill package will be determined experimentally using the results of the inclining

    experiment above.

    8.1.2 This test will use Pendulum #1 from the incline experiment above (Main Deck Centerline) as well as the fourth pendulum (Pendulum #4

    mentioned in Section 7.1.2). The oil bath for Pendulum #1 is to be

    oriented transversely, per the inclining experiment above. The oil bath

    for Pendulum #4 shall be oriented longitudinally.

    8.1.3 Verify the previously determined position of the drill package has not changed. See Section 6.4.3.

    8.1.4 Sections (d) through (j) of Section 7.5.3 shall be followed with respect to Pendulum #1 only. Pendulums #2, #3, and #4 shall not be used at

    this time.

    8.1.5 At the end of the zero position operation, the Naval Architect shall direct the rig operators to skid the substructure/drill floor of the drill

    package fifteen (15) feet to starboard.

    8.1.6 Repeat sections (d) through (k) of Section 7.5.3 for Position #1.

    8.1.7 Measure the position of the Substructure/Drill Floor.

    8.1.8 Return the Substructure/Drill Floor to the zero position.

    8.1.9 Sections (d) through (j) of Section 7.5.3 shall be followed with respect to Pendulum #4 only. Pendulums #1, #2, and #3 shall not be used at

    this time.

    8.1.10 At the end of the zero position operation, the Naval Architect shall direct the rig operators to skid the entire drill package thirty (30) feet

    aft.

    8.1.11 Repeat sections (d) through (k) of Section 7.5.3 for Position #1.

    8.1.12 Measure the position of the drill package

    8.1.13 Return the Drill Package to the zero position. This ends the test.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    APPENDIX A - EQUIPMENT/RESPONSIBILITY CHECK LIST

  • LeTOURNEAU HULL NO.244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON REV. 2

    PAGE A-1

    1. Equipment

    1.1 Field Engineering

    Pendulum Systems (4) mounts, troughs, oil, wire, washers, plumb bobs, and

    batten boards.

    Two (2) small boats, flash lights, navigation lights, and life jackets.

    Radios - for communication between Stations (5 radio minimum).

    Tank atmosphere tester

    Schedule Tugs

    Certified Test Weights

    Anemometer and/or weather vane

    Water Sampler

    Hydrometer (range 0.80 to 1.05)

    Thermometer

    Two (2) Draft Tubes

    1m Engineering scales (marked millimeters) (4 minimum)

    Three (3) Tank Sounding Tapes (for Fresh Water, Sea Water and Fuel Oil)

    1.2 Design Engineering

    Pencils (12 minimum)

    Tape measure (30 m minimum)

    Tape measure (5 m)

    Metal marker

    Graph paper

    Calculator / microcomputer

    Incline agenda

    Drawings as needed

    Paper and thumb tacks

    Tank Tables

    Weight Report

    Hydrostatic Tables

  • LeTOURNEAU HULL NO.244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON REV. 2

    PAGE A-2

    2. Responsibilities

    2.1 Field Engineer: Manage the safety and control of the rig while under tow.

    Coordinate with tug to determine incline location and verify adequate water

    depths before rig leaves dock.

    Verify good communications to all stations and required personnel.

    Liaison between Tugs, River Pilot(s), Naval Architect, and OIM.

    Manage slack line operation.

    Maintain close communication with the following: Pilots, Surveyors, and

    other regulatory bodies as applicable as to the date and time of test.

    2.2 Naval Architect / Engineer in Charge: Oversee the lightship survey and incline procedures.

    Coordinate a meeting with incline staff, owner, regulatory representatives,

    and river pilots. The goal of this meeting is to familiarize necessary

    personnel with their part of the experiment, and to resolve all outstanding

    issues.

    Record draft data, generate draft plot, and evaluate result.

    Oversee device stations, and skidding station.

    Record incline data, generate incline plot, and evaluate result.

    Provide regulatory representatives with preliminary results.

    2.3 Barge Engineer: Maintain an appropriate level of safety at all times. Safety issues that arise

    must be addressed and appropriate action taken to resolve those issues.

    These may include the following:

    - Manhole covers removed for tank inspection.

    - Walkways or handrails removed to accommodate skidding of the drill package.

    - Extra equipment onboard for inclining.

    - Safe working distance from tow equipment.

    Skidding of drill package during incline.

    Assist engineer in charge in preparation for the incline.

    Prepare the drill package for weighing and all equipment , hoses, etc. are

    remove to accommodate skidding longitudinally and transverse.

    Assist engineer in charge by providing equipment weights and

    documentation to determine weights to add and deduct.

    Remove mud from the spud cans.

    Assist engineer in charge in taking specific gravity of liquids.

    Assist in the tank inspection conducted with the engineer in charge and

    regulatory body representatives.

    Maintain tanks between 40% to 60% full to avoid pocketing and free surface

    effects. All unused tanks shall be empty and stripped.

    Remove any standing water from decks.

    Work with the engineer in charge in performing and documenting tank

    soundings before and after the stability test.

    Ensure all equalizer valves are closed.

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    APPENDIX B ILLUSTRATIONS

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    Copyright 2014 CAMERON Rev. 2

    APPENDIX C - HYDROSTATICS

  • LeTOURNEAU KIT HULL NO. 244 V351

    HYDROSTATIC TABLE OF ABBREVIATIONS

    COPYRIGHT 2014 CAMERON REV. 2

    PAGE C-1

    LCB Longitudinal position of Center of Buoyancy VCB Vertical position of Center of Buoyancy TCB Transverse position of Center of Buoyancy LCF Longitudinal position of Center of Floatation TCF Transverse position of Center of Floatation WP AREA Area of Waterplane WPIL Longitudinal Moment of Inertia of the Waterplane WPIT Transverse Moment of Inertia of the Waterplane KML Height of the Longitudinal Metacenter Above Baseline [BML + KB] KMT Height of the Transverse Metacenter Above Baseline [BMT + KB] BML Longitudinal Metacentric Radius [WPIL / Volume] BMT Transverse Metacentric Radius [WPIT / Volume] GML Longitudinal Metacentric Height [KML KG] GMT Transverse Metacentric Height [KMT KG] KPI Kips Per Inch Immersion TPI Tons Per Inch Immersion LCG Longitudinal Center of Gravity TCG Transverse Center of Gravity VCG or KG Vertical Center of Gravity MT1 Moment to Trim 1 Inch MH1 Moment to Heel 1 Inch VOL. OF DISP. Volume of Displacement (Cu. Ft.) SW Sea Water Density (64.0 Lbs. / Cu. Ft.) KIP 1000 Pounds TONS Long Ton (2240 Pounds) Cb Block Coefficient Cm Midship Section Coefficient Cwp Waterplane Area Coefficient

  • LeTOURNEAU KIT HULL NO. 244 V351

    HYDROSTATICS TABLE

    COPYRIGHT 2014 CAMERON REV. 2

    PAGE C-2

    HYDROSTATICS TABLE

    Longitudinal distances are measured from the bow (+ Aft., - Fwd.)

    Transverse distances are measured from the rig centerline (+ Stbd., - Port)

    Moment to trim/heel values are calculated with the KG @ 0.0 feet.

    Draft Disp.

    Sub-merged

    Volume KPI LCB TCB VCB LCF TCF

    Water Plane Area KML KMT BML BMT

    Water Plane

    Moment of Inertia

    Long.

    Water Plane

    Moment of Inertia Trans.

    Moment to Trim

    0.01 (deg) KG=0.0 ft

    Moment to

    Heel

    0.01 (deg) KG=0.0 ft

    ft kips ft3 Kips/In ft ft ft ft ft Ft2 ft Ft ft ft ft4 ft4 ft-kips ft-kips

    11.0 17286 270087 139.39 143.87 -0.09 5.62 149.14 -0.09 26135 343.88 210.22 338.26 204.60 91358552 55258816 1037.4 634.2

    11.5 18124 283182 140.07 144.12 -0.09 5.88 149.56 -0.09 26263 331.98 202.03 326.10 196.15 92344664 55544996 1050.1 639.1

    12.0 18966 296339 140.73 144.37 -0.09 6.14 149.99 -0.09 26387 321.06 194.49 314.91 188.35 93321024 55815632 1062.7 643.8

    12.5 19812 309559 141.39 144.62 -0.09 6.40 150.39 -0.09 26510 310.98 187.55 304.58 181.15 94285392 56075036 1075.3 648.5

    13.0 20662 322839 142.03 144.86 -0.09 6.67 150.80 -0.09 26631 301.68 181.12 295.02 174.45 95243128 56319120 1087.9 653.1

    13.5 21516 336179 142.67 145.10 -0.09 6.93 151.20 -0.09 26750 293.07 175.15 286.14 168.22 96194728 56552672 1100.5 657.7

    14.0 22373 349578 143.29 145.34 -0.09 7.19 151.59 -0.09 26866 285.05 169.59 277.86 162.40 97134888 56773012 1113.1 662.2

    14.5 23234 363035 143.90 145.58 -0.09 7.45 151.97 -0.08 26981 277.58 164.41 270.13 156.96 98067168 56982872 1125.6 666.7

    15.0 24099 376549 144.45 145.81 -0.09 7.71 152.32 -0.08 27084 270.41 159.54 262.70 151.83 98918576 57171920 1137.4 671.1

    15.5 24966 390091 144.45 146.04 -0.09 7.97 152.32 -0.08 27084 261.75 154.56 253.78 146.59 98995856 57181644 1140.5 673.5

    16.0 25833 403633 144.45 146.25 -0.09 8.23 152.32 -0.08 27084 253.51 149.90 245.27 141.67 98999384 57182184 1143.0 675.9

    16.5 26699 417175 144.45 146.45 -0.09 8.49 152.32 -0.08 27084 245.82 145.57 237.32 137.08 99004160 57184444 1145.5 678.3

    17.0 27566 430717 144.45 146.63 -0.09 8.75 152.32 -0.08 27084 238.61 141.52 229.86 132.76 99002552 57184076 1148.0 680.9

    17.5 28433 444259 144.45 146.81 -0.09 9.01 152.32 -0.08 27084 231.86 137.73 222.84 128.72 99000720 57184500 1150.6 683.5

    18.0 29299 457801 144.45 146.97 -0.09 9.27 152.33 -0.08 27084 225.53 134.18 216.25 124.91 99001816 57184244 1153.3 686.2

    18.5 30166 471343 144.45 147.12 -0.09 9.53 152.31 -0.08 27085 219.58 130.85 210.05 121.32 99006840 57184632 1156.1 688.9

    19.0 31033 484885 144.45 147.27 -0.09 9.79 152.32 -0.08 27084 213.97 127.72 204.18 117.93 99003880 57184276 1158.9 691.8

    19.5 31899 498427 144.45 147.41 -0.09 10.04 152.32 -0.08 27085 208.68 124.78 198.63 114.73 99003464 57184984 1161.8 694.7

    20.0 32766 511969 144.45 147.54 -0.09 10.30 152.32 -0.08 27084 203.68 122.00 193.38 111.70 99002152 57184504 1164.8 697.7

    21.0 34499 539053 144.45 147.78 -0.09 10.81 152.32 -0.08 27085 194.48 116.90 183.66 106.08 99003408 57185220 1171.0 703.9

    22.0 36233 566137 144.45 147.99 -0.09 11.32 152.32 -0.08 27084 186.19 112.33 174.87 101.01 98999288 57184244 1177.4 710.4

    23.0 37966 593221 144.45 148.19 -0.09 11.83 152.31 -0.08 27085 178.73 108.23 166.90 96.40 99006560 57185960 1184.3 717.2

    24.0 39700 620305 144.45 148.37 -0.09 12.34 152.32 -0.08 27084 171.95 104.53 159.60 92.19 99002976 57184628 1191.4 724.3

    25.0 41433 647389 144.45 148.54 -0.09 12.85 152.32 -0.08 27084 165.78 101.19 152.93 88.33 99003656 57185920 1198.8 731.7

    26.0 43166 674473 144.45 148.69 -0.09 13.36 152.32 -0.08 27084 87.02 55.92 73.66 42.56 49682864 28702876 655.6 421.3

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    APPENDIX D FORMS

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    American Bureau of Shipping:

    Det Norske Veritas:

    Vessel Owner:

    LeTourneau, Inc:

    Other:

    WITNESSING PERSONNEL

    Copyright 2014 CAMERON Form D-1

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Dry Weights Surveyor:

    Machinery Space Deducts Date:

    # Item Weight LCG TCG VCG

    (Added items in parentheses) ft aft ft stbd m above

    kg Bow Rig CL Deck

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    Comments

    Copyright 2014 CAMERON Form D-2

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Dry Weights Surveyor:

    Main Deck Deducts Date:

    # Item Weight LCG TCG VCG

    (Added items in parentheses) ft aft ft stbd m above

    kg Bow Rig CL Deck

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    Comments

    Copyright 2014 CAMERON Form D-3

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Dry Weights Surveyor:

    01 to 03 Level Quarters Deducts Date:

    # Item Weight

    (Added items in parentheses)

    kg

    1 Laundry

    2 Change Room

    3 Treatment Room

    4 Steward's Office

    5 Stairway Closet

    6 Mess Hall

    7 Electrical Room

    8 Corridor

    9 Recreation Room

    10 Closet (Port)

    11 Storage Room

    12 Closet (Stbd)

    13 Laundry

    14 Electrical Room

    15 Platform (Port)

    16 Platform (Stbd)

    17 Office (Port)

    18 Toolpusher's Office

    19 Fileroom

    20 Companyman Office

    21 Office (Stbd)

    22 Electrical Room

    23 Platform (Port)

    24 Platform (Stbd)

    Comments

    Copyright 2014 CAMERON Form D-4

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Dry Weights Surveyor:

    04 to Control Hse Quarters Deducts Date:

    # Item Weight

    (Added items in parentheses)

    kg

    1 Office

    2 Control Room

    3 Storage

    4 Conference Room

    5 MCC

    6 Emergency Generator House

    Comments

    Copyright 2014 CAMERON Form D-5

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Dry Weights Surveyor:

    Cantilever Beam Deducts Date:

    # Item Weight LCG TCG VCG

    (Added items in parentheses) ft fwd ft stbd m abv

    kg Rotary Rig CL Upper Flg

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    Comments

    Copyright 2014 CAMERON Form D-6

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Dry Weights Surveyor:

    Drill Floor Deducts Date:

    # Item Weight LCG TCG VCG

    (Added items in parentheses) ft fwd ft stbd m abv

    kg Rotary Rig CL Drill Floor

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    Comments

    Copyright 2014 CAMERON Form D-7

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Item DESCRIPTION Sounding Sounding Sounding Sounding Sounding Sounding Sounding Sounding

    No: (VARIABLE

    LOAD) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm)

    POTABLE WATER:

    POT-1 Tank No. 16

    POT-2 Tank No. 17Total - Pot. Water

    DRILL WATER:

    DRILL-1 Tank No. 14

    DRILL-2 Tank No. 15

    DRILL-3 Tank No. 32

    DRILL-4 Tank No. 33

    Total - Drill Water

    DIESEL FUEL:

    DIES-1 Tank No. 22

    DIES-2 Tank No. 23

    DIES-3 Tank No. 26

    DIES-4 Tank No. 27

    DIES-5 Fuel Oil Day Tank

    DIES-6 Emer. Day TankTotal - Diesel Fuel

    MISC. TANKS:

    MISC-1 Brine Tank 8a

    MISC-2 Brine Tank 9a

    MISC-3 Base Oil Tank 24

    MISC-4 Base Oil Tank 25

    MISC-5 Dirty Oil Tank 29

    MISC-6 Engine Room LO

    MISC-7 Mud Pump Rm LO

    MISC-8 Skimmer TankTotal - Misc. Tanks

    Copyright 2014 CAMERON Form D-8

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Item DESCRIPTION Sounding Sounding Sounding Sounding Sounding SoundingSoundingSounding

    No: (VARIABLE

    LOAD) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm)

    MUD PITS:

    MUD-1 Mud Pit No. 1

    MUD-2 Mud Pit No. 2

    MUD-3 Mud Pit No. 3

    MUD-4 Mud Pit No. 4

    MUD-5 Mud Pit No. 5

    MUD-6 Mud Pit No. 6

    MUD-7 Mud Pit No. 7

    MUD-8 Mud Pit No. 8

    MUD-9 Mud Pit No. 9

    MUD-10 Mud Pit No. 10

    SLUG-1 Slug Pit No. 1

    SLUG-2 Slug Pit No. 2

    SLUG-3 Slug Pit No. 3Total - Liquid Mud

    SAND TRAPS:

    SAND-1 Overflow

    SAND-2 Desilter

    MUD-3 Desander

    MUD-4 Degasser

    MUD-5 Sand Trap #2

    MUD-6 Sand Trap #1Total - Sand Traps

    VOIDS:

    VD-1/3 Void #8F/10

    VD-2/4 Void #9F/11

    VD-5 Void #18

    VD-6 Void #19

    VD-7 Void #34

    VD-8 Void #35

    VD-9 Dump Valve (P)

    VD-10 Dump Valve (S)

    VD-11 Pump Pit (Fwd)

    VD-12 Pump Pit (Aft)Total - Voids

    Copyright 2014 CAMERON Form D-9

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Item DESCRIPTION Sounding Sounding Sounding Sounding Sounding SoundingSoundingSounding

    No: (VARIABLE

    LOAD) (cm) (cm) (cm) (cm) (cm) (cm) (cm) (cm)

    PRELOAD TANKS:

    PL-1 Tank No.1 (Comb)

    PL-2 Tank No.2 (Comb)

    PL-3 Tank No.3 (Comb)

    PL-4 Tank No.4

    PL-5 Tank No.5

    PL-6 Tank No.6

    PL-7 Tank No.7

    PL-8 Tank No.12

    PL-9 Tank No.13

    PL-10 Tank No.20

    PL-11 Tank No.21

    PL-12 Tank No.30

    PL-13 Tank No.31

    PL-14 Tank No.40

    PL-15 Tank No.41

    PL-16 Tank No.42

    PL-17 Tank No.43

    PL-18 Tank No.44

    PL-19 Tank No.45

    PL-20 Tank No.46

    PL-21 Tank No.47

    PL-22 Tank No.48

    PL-23 Tank No.49Total - Preload

    Copyright 2014 CAMERON Form D-10

  • LeTOUREAU HULL NO. 244

    INCLINE AGENDA

    V351

    Drill Package Layout:

    During Draft Readings:

    +/- ft in 16

    Cantilever Beam aft of Quarters

    Rotary stbd of Rig CL

    Spud Can Layout:

    * Measurement to Top of Gear Unit Brace Beams.

    If the top of the pyramid is the ref. add 30" to the measurement.

    Cranes

    Port Fwd Crane:

    Stbd Crane:

    Port Aft Crane

    * Azimuth measured counterclockwise - pointing forward is 0 degrees

    + Elevation measured up from horizontal.

    deg

    deg

    Azimuth*

    deg

    deg

    deg

    Elevation+

    deg

    Reference Measurement*

    ft

    ft

    in

    in Port Leg

    Stbd Leg

    Bow Leg ft

    in

    ft

    Copyright 2014 CAMERON Form D-11

  • LeTOUNEAU HULL NO. 244INCLINING AGENDA

    V351

    Block Weights Block Dimensions

    m

    m

    m

    ft

    ft

    ft

    deg

    ft

    ft

    ft

    degAngle

    (Evens)

    Base LCG

    Base TCG

    Base VCG

    PORT SIDE

    FWD AFT

    Number Weight

    P1

    Base LCG

    Base TCG

    Base VCG

    Height:

    S10

    S9

    S8

    S7

    S6

    S5

    STACK STACK

    S4

    S3

    S2

    S1

    P10

    P9

    P8

    P7

    P6

    P5

    Angle

    P4

    P3

    0.45

    STBD SIDE

    P2

    Width:

    (Odds) (Evens)

    2.35

    MT

    Length:

    STACK STACK

    1.84

    FWD AFT

    (Odds)

    Copyright 2014 CAMERON Form D-12

  • LeTOUNEAU HULL NO. 244INCLINING AGENDA

    V351

    Freeboard Readings

    Date of Experiment

    Time of Day

    Water Temperature Degrees

    # Long. Trans. ft in 16ths ft in 16ths in 16ths

    1 Bow Port

    2 Bow Stbd

    3 Fwd Leg Port

    4 Fwd Leg Stbd

    5 LCF Port

    6 LCF Stbd

    7 Aft Leg Port

    8 Aft Leg Stbd

    9 Transom Port

    10 Transom Stbd

    Specific Gravity/Density

    Liquid

    SW

    FW

    C

    ft

    Trans. Location

    Description (ft aft of Bow) (ft. off rig CL)

    Freeboard

    Reading

    Ref.

    (abv BL)

    SG

    Draft Mark Long. Location

    Copyright 2014 CAMERON Form D-13

  • LeTOURNEAU HULL NO. 244

    INCLINING AGENDA

    V351

    Tangent of Angle of Incline

    Pendulum 1 Length mm Main Deck

    Pendulum 2 Length mm Starboard

    Pendulum 3 Length mm Port

    Main Stbd Port

    Reading Time Wind Spd. Wind Dir. Pendulum 1 Pendulum 2 Pendulum 3

    No. knots deg. mm mm mm

    0

    1

    2

    3

    4

    5

    6

    7

    8

    Copyright 2014 CAMERON Form D-14

  • LeTOUNEAU HULL NO. 244INCLINING AGENDA

    V351

    Drill Package Weight - Overall (Longitudinal Measurement)

    Pendulum Length mm Longitudinal

    Reading Position Distance Pendulum Pendulum

    No. (Ft.) (Ft.) mm TAN (B)

    0

    1

    Substructure/Drill Floor Weight (Transverse Measurement)

    Pendulum Length mm Main Deck Centerline

    Reading Position Distance Pendulum Pendulum

    No. (Ft.) (Ft.) mm TAN (B)

    Copyright 2014 CAMERON Form D-15

  • LeTOURNEAU HULL NO. 244 V351

    INCLINING AGENDA

    COPYRIGHT 2014 CAMERON Rev. 2

    APPENDIX E PRELIMINARY LOAD OUT CALCULATIONS

  • LeTOURNEAU KIT NO. 244

    SAMPLE INCLINE LOADING CONDITION

    V351

    Item DESCRIPTION Sounding Weight LCG TCG VCG Long'l. Trans. Vert. TFSC

    No: (VARIABLE Bow Hull CL from BL Moment Moment Moment

    LOAD) (ins) (Kips) (Ft.) (Ft.) (Ft.) (Ft-Kips) (Ft-Kips) (Ft-Kips) (Ft.)

    POTABLE WATER:

    POT-1 Tank No. 16 72.00 290.53 129.64 12.56 3.00 37665 3649 872 0.0000

    POT-2 Tank No. 17 0.00 0.00 129.83 -12.08 0.00 0 0 0 0.0000

    Total - Potable Water 290.53 129.64 12.56 3.00 37665 3649 872 0.0000

    DRILL WATER:

    DRILL-1 Tank No. 1 (Comb) 0.00 0.00 7.69 0.00 0.00 0 0 0 0.0000

    DRILL-2 Tank No. 2 (Comb) 0.00 0.00 29.51 14.76 0.00 0 0 0 0.0000

    DRILL-3 Tank No. 3 (Comb) 0.00 0.00 29.51 -14.76 0.00 0 0 0 0.0000

    DRILL-4 Tank No. 14 0.00 0.00 135.55 44.37 0.00 0 0 0 0.0000

    DRILL-5 Tank No. 15 0.00 0.00 134.27 -43.51 0.00 0 0 0 0.0000

    DRILL-6 Tank No. 32 0.00 0.00 195.45 38.38 0.00 0 0 0 0.0000

    DRILL-7 Tank No. 33 0.00 0.00 195.45 -38.38 0.00 0 0 0 0.0000

    Total - Drill Water 0.00 0.00 0.00 0.00 0 0 0 0.0000

    DIESEL FUEL:

    DIES-1 Tank No. 22 30.00 48.73 160.93 64.16 1.25 7843 3127 61 0.0533

    DIES-2 Tank No. 23 0.00 0.00 160.93 -64.16 0.00 0 0 0 0.0000

    DIES-3 Tank No. 26 0.00 0.00 165.16 13.00 0.00 0 0 0 0.0000

    DIES-4 Tank No. 27 0.00 0.00 164.71 -11.74 0.00 0 0 0 0.0000

    DIES-5 Fuel Oil Day Tank 73.00 33.71 155.20 3.01 18.03 5232 101 608 0.0000

    DIES-6 Emer. Day Tank 62.00 14.94 119.52 60.30 62.77 1785 901 938 0.0000

    Total - Diesel Fuel 97.38 152.60 42.40 16.49 14860 4129 1606 0.0533

    MISC. TANKS:

    MISC-1 Brine Tank No. 8a 0.00 0.00 105.76 36.46 0.00 0 0 0 0.0000

    MISC-2 Brine Tank No. 9a 0.00 0.00 105.76 -36.46 0.00 0 0 0 0.0000

    MISC-3 Base Oil Tank No. 24 0.00 0.00 164.99 39.05 0.00 0 0 0 0.0000

    MISC-4 Base Oil Tank No. 25 0.00 0.00 166.89 -42.06 0.00 0 0 0 0.0000

    MISC-5 Dirty Oil Tank No. 29 0.00 0.00 169.16 -24.00 0.00 0 0 0 0.0000

    MISC-6 Engine Lube Oil 0.00 0.00 155.17 -12.64 14.01 0 0 0 0.0000

    MISC-7 Mud Pump Room LO 0.00 0.00 134.17 -24.50 14.50 0 0 0 0.0000

    MISC-8 Skimmer Tank 0.00 0.00 215.71 -20.00 0.00 0 0 0 0.0000

    Total - Misc. Tanks 0.00 0.00 0.00 0.00 0 0 0 0.0000

    Copyright 2014 Cameron

    PAGE E-1

  • LeTOURNEAU HULL NO. 244

    SAMPLE INCLINE LOADING CONDITION

    V351

    Item Sounding Weight LCG TCG VCG Long'l. Trans. Vert. TFSC

    No: Bow Hull CL from BL Moment Moment Moment

    (ins) (Kips) (Ft.) (Ft.) (Ft.) (Ft-Kips) (Ft-Kips) (Ft-Kips) (Ft.)

    LIQUID MUD: 64.0 lb/ft3

    MUD-1 0.00 0.00 110.66 19.50 4.00 0 0 0 0.0000

    MUD-2 0.00 0.00 110.38 8.35 4.00 0 0 0 0.0000

    MUD-3 0.00 0.00 110.38 -8.35 4.00 0 0 0 0.0000

    MUD-4 0.00 0.00 105.16 -19.50 4.50 0 0 0 0.0000

    MUD-5 0.00 0.00 91.15 32.39 4.00 0 0 0 0.0000

    MUD-6 0.00 0.00 76.83 25.11 6.00 0 0 0 0.0000

    MUD-7 0.00 0.00 85.14 13.31 6.00 0 0 0 0.0000

    MUD-8 0.00 0.00 85.14 -13.31 6.00 0 0 0 0.0000

    MUD-9 0.00 0.00 76.83 -25.11 6.00 0 0 0 0.0000

    MUD-10 0.00 0.00 91.15 -32.39 4.00 0 0 0 0.0000

    SLUG-1 0.00 0.00 110.10 0.00 4.00 0 0 0 0.0000

    SLUG-2 0.00 0.00 110.66 -16.25 4.00 0 0 0 0.0000

    SLUG-3 0.00 0.00 110.66 -22.75 4.00 0 0 0 0.0000

    0.00 0.00 0.00 0.00 0 0 0 0.0000

    MUD PROCESSING:

    SAND-1 0.00 0.00 225.27 39.60 26.00 0 0 0 0.0000

    SAND-2 0.00 0.00 225.27 45.00 26.00 0 0 0 0.0000

    SAND-3 0.00 0.00 225.27 51.00 26.00 0 0 0 0.0000

    SAND-4 0.00 0.00 225.27 57.00 26.00 0 0 0 0.0000

    SAND-5 0.00 0.00 225.27 63.50 26.00 0 0 0 0.0000

    SAND-6 0.00 0.00 225.27 71.50 26.00 0 0 0 0.0000

    0.00 0.00 0.00 0.00 0 0 0 0.0000

    VOIDS:

    VD-1 0.00 0.00 91.15 32.39 0.00 0 0 0 0.0000

    VD-2 0.00 0.00 91.15 -32.39 0.00 0 0 0 0.0000

    VD-3 0.00 0.00 98.08 13.48 0.00 0 0 0 0.0000

    VD-4 0.00 0.00 99.06 -13.86 0.00 0 0 0 0.0000

    VD-5 0.00 0.00 149.16 13.00 0.00 0 0 0 0.0000

    VD-6 0.00 0.00 149.16 -13.00 0.00 0 0 0 0.0000

    VD-7 0.00 0.00 194.37 13.00 0.00 0 0 0 0.0000

    VD-8 0.00 0.00 194.37 -13.00 0.00 0 0 0 0.0000

    VD-9 0.00 0.00 149.42 -66.07 0.00 0 0 0 0.0000

    VD-10 0.00 0.00 149.42 66.07 0.00 0 0 0 0.0000

    VD-11 0.00 0.00 117.16 32.00 0.00 0 0 0 0.0000

    VD-12 0.00 0.00 161.16 -32.00 0.00 0 0 0 0.0000

    0.00 0.00 0.00 0.00 0 0 0 0.0000

    BULK MATERIAL:

    BULK-1 0.00 0.00 27.04 -9.00 26.40 0 0 0

    BULK-2 0.00 0.00 52.29 -33.71 26.40 0 0 0

    BULK-3 0.00 0.00 64.12 -38.66 26.40 0 0 0

    BULK-4 0.00 0.00 75.96 -43.60 26.40 0 0 0

    BULK-5 0.00 0.00 27.04 9.00 26.40 0 0 0

    BULK-6 0.00 0.00 52.29 33.71 26.40 0 0 0

    BULK-7 Cement Tank #3 0.00 0.00 64.12 38.66 26.40 0 0 0

    BULK-8 0.00 0.00 75.96 43.60 26.40 0 0 0

    0.00 0.00 0.00 0.00 0 0 0

    Pump Pit (Fwd)

    Cement Tank #4

    Total - Bulk Material

    Void No. 19

    Pump Pit (Aft)

    Cement Tank #2

    Total - Voids

    Barite Tank #2

    Barite Tank #3

    Barite Tank #4

    Cement Tank #1

    Void No. 35

    Barite Tank #1

    Void No. 34

    Void No. 9f

    Void No. 18

    Total - Liquid Mud

    Void No. 10

    Void No. 11

    Void No. 8f

    Dump Valve (Port)

    Dump Valve (Stbd)

    Slug Pit No. 2

    Mud Pit No. 5

    Mud Pit No. 7

    Mud Pit No. 8

    Desander

    Mud Pit No. 9

    Overflow

    Mud Pit No. 3

    Slug Pit No. 1

    Slug Pit No. 3

    Mud Pit No. 2

    Total - Mud Processing

    Sand Trap #1

    Degasser

    Desilter

    Sand Trap #2

    Mud Pit No. 6

    Mud Pit No. 10

    DESCRIPTION

    (VARIABLE

    LOAD)

    Mud Pit No. 1

    Mud Pit No. 4

    Copyright 2014 Cameron

    PAGE E-2

  • LeTOURNEAU HULL NO. 244

    SAMPLE INCLINE LOADING CONDITION

    V351

    Item DESCRIPTION Weight LCG TCG VCG Long'l. Trans. Vert.

    No: (VARIABLE Bow Hull CL from BL Moment Moment Moment

    LOAD) (Kips) (Ft.) (Ft.) (Ft.) (Ft-Kips) (Ft-Kips) (Ft-Kips)

    MACHINERY DECK VARIABLE:

    MCH-1 Engine Room 0.00 182.38 0.00 6.00 0 0 0

    Total - Machinery Deck Variable 0.00 0.00 0.00 0.00 0 0 0

    MAIN DECK VARIABLE:

    MDV-1 Drill Pipe - Main Dk. Pipe Rack 184.90 186.46 9.87 28.04 34477 1825 5185

    Total - Main Deck Variable 184.90 186.46 9.87 28.04 34477 1825 5185

    SHALE SHAKER VARIABLE

    SSV-1 Shale Shaker House 0.00 225.80 55.61 43.15 0 0 0

    Total - Shale Shaker Variable 0.00 0.00 0.00 0.00 0 0 0

    CANTILEVER VARIABLE

    CLV-1 BOP 163.50 226.58 20.47 42.00 37046 3347 6867

    CLV-2 Misc. Items 5.00 171.45 0.00 48.66 857 0 243

    Total - Cantilever Variable 168.50 224.95 19.86 42.20 37904 3347 7110

    DRILL FLOOR VARIABLE

    DFV-2 Misc. Drill Tools 8.00 222.93 0.00 69.50 1783 0 556

    Total - Drill Floor Variable 8.00 222.93 0.00 69.50 1783 0 556

    QUARTERS VARIABLE

    QTV-1 Crew and Effects 0.00 108.46 -6.74 46.02 0 0 0

    Total - Quarters Variable 0.00 0.00 0.00 0.00 0 0 0

    INCLINE WEIGHTS

    INC-1 Incline Weight #P1 21.85 147.87 -80.55 26.74 3231 -1760 584

    INC-2 Incline Weight #P2 21.87 154.98 -84.66 26.74 3389 -1851 585

    INC-3 Incline Weight #P3 21.89 147.87 -80.55 28.21 3237 -1763 618

    INC-4 Incline Weight #P4 21.91 154.98 -84.66 28.21 3396 -1855 618

    INC-5 Incline Weight #P5 21.94 147.87 -80.55 29.69 3244 -1767 651

    INC-6 Incline Weight #P6 22.18 154.98 -84.66 29.69 3437 -1878 658

    INC-7 Incline Weight #P7 22.20 147.87 -80.55 31.17 3283 -1788 692

    INC-8 Incline Weight #P8 22.22 154.98 -84.66 31.17 3444 -1881 693

    INC-9 Incline Weight #P9 22.24 147.87 -80.55 32.64 3289 -1792 726

    INC-10 Incline Weight #P10 22.27 154.98 -84.66 32.64 3451 -1885 727

    INC-11 Incline Weight #S1 22.05 147.87 80.55 26.74 3260 1776 589

    INC-12 Incline Weight #S2 22.05 154.98 84.66 26.74 3417 1866 589

    INC-13 Incline Weight #S3 22.05 147.87 80.55 28.21 3260 1776 622

    INC-14 Incline Weight #S4 22.05 154.98 84.66 28.21 3417 1866 622

    INC-15 Incline Weight #S5 22.05 147.87 80.55 29.69 3260 1776 655

    INC-16 Incline Weight #S6 22.05 154.98 84.66 29.69 3417 1866 655

    INC-17 Incline Weight #S7 22.05 147.87 80.55 31.17 3260 1776 687

    INC-18 Incline Weight #S8 22.05 154.98 84.66 31.17 3417 1866 687

    INC-19 Incline Weight #S9 22.05 147.87 80.55 32.64 3260 1776 720

    INC-20 Incline Weight #S10 22.05 154.98 84.66 32.64 3417 1866 720

    Total - Incline Weights 441.03 151.43 -0.02 29.70 66785 -10 13098

    Copyright 2014 Cameron

    PAGE E-3

  • LeTOURNEAU HULL NO. 244

    SAMPLE INCLINE LOADING CONDITION

    V351

    Item DESCRIPTION Sounding Weight LCG TCG VCG Long'l. Trans. Vert. TFSC

    No: (VARIABLE Bow Hull CL from BL Moment Moment Moment

    LOAD) (ins) (Kips) (Ft.) (Ft.) (Ft.) (Ft-Kips) (Ft-Kips) (Ft-Kips) (Ft.)

    PRELOAD: (NOTE: Any residual water in preload tank is considered as part of Variable Load.)

    PL-1 Tank No.1 (Comb) 72.00 241.81 7.69 0.00 3.00 1860 0 725 0.2561

    PL-2 Tank No.2 (Comb) 156.00 572.36 29.51 14.76 6.50 16890 8448 3720 0.1123

    PL-3 Tank No.3 (Comb) 0.00 0.00 29.51 -14.76 0.00 0 0 0 0.0000

    PL-4 Tank No.4 0.00 0.00 68.43 29.49 0.00 0 0 0 0.0000

    PL-5 Tank No.5 0.00 0.00 68.43 -29.49 0.00 0 0 0 0.0000

    PL-6 Tank No.6 0.00 0.00 98.44 49.82 0.00 0 0 0 0.0000

    PL-7 Tank No.7 0.00 0.00 98.44 -49.82 0.00 0 0 0 0.0000

    PL-8 Tank No.12 0.00 0.00 134.08 70.40 0.00 0 0 0 0.0000

    PL-9 Tank No.13 0.00 0.00 134.08 -70.40 0.00 0 0 0 0.0000

    PL-10 Tank No.20 0.00 0.00 162.15 86.97 0.00 0 0 0 0.0000

    PL-11 Tank No.21 0.00 0.00 162.15 -86.97 0.00 0 0 0 0.0000

    PL-12 Tank No.30 0.00 0.00 188.91 98.37 0.00 0 0 0 0.0000

    PL-13 Tank No.31 0.00 0.00 188.91 -98.37 0.00 0 0 0 0.0000

    PL-14 Tank No.40 0.00 0.00 210.97 94.72 0.00 0 0 0 0.0000

    PL-15 Tank No.41 0.00 0.00 210.97 -94.72 0.00 0 0 0 0.0000

    PL-16 Tank No.42 0.00 0.00 215.89 79.90 0.00 0 0 0 0.0000

    PL-17 Tank No.43 0.00 0.00 215.89 -79.90 0.00 0 0 0 0.0000

    PL-18 Tank No.44 0.00 0.00 215.58 62.29 0.00 0 0 0 0.0000

    PL-19 Tank No.45 0.00 0.00 215.58 -62.29 0.00 0 0 0 0.0000

    PL-20 Tank No.46 0.00 0.00 215.71 40.00 0.00 0 0 0 0.0000

    PL-21 Tank No.47 0.00 0.00 215.71 -40.00 0.00 0 0 0 0.0000

    PL-22 Tank No.48 0.00 0.00 215.71 13.00 0.00 0 0 0 0.0000

    PL-23 Tank No.49 0.00 0.00 215.71 -7.00 0.00 0 0 0 0.0000

    Total - Preload 814.18 23.03 10.38 5.46 18750 8448 4446 0.3683

    LEG VARIABLE LOAD:

    LV-1 Bow Donut 0.00 60.00 0.00 7.32 0 0 0

    LV-2 Port Donut 0.00 189.00 -71.00 7.32 0 0 0

    LV-3 Stbd Donut 0.00 189.00 71.00 7.32 0 0 0

    Total - Leg Variable 0.00 0.00 0.00 0.00 0 0 0

    Copyright 2014 Cameron

    PAGE E-4

  • LeTOURNEAU HULL NO. 244

    SAMPLE INCLINE LOADING CONDITION

    V351

    Item Weight LCG TCG VCG Long'l. Trans. Vert. TFSC

    No: Bow Hull CL from BL Moment Moment Moment

    (Kips) (Ft.) (Ft.) (Ft.) (Ft-Kips) (Ft-Kips) (Ft-Kips) (Ft.)

    VARIABLE LOAD SUMMARY:

    POT 290.53 129.64 12.56 3.00 37665 3649 872 0.00

    DRILL 0.00 0.00 0.00 0.00 0 0 0 0.00

    DIES 97.38 152.60 42.40 16.49 14860 4129 1606 0.05

    MISC 0.00 0.00 0.00 0.00 0 0 0 0.00

    MUD 0.00 0.00 0.00 0.00 0 0 0 0.00

    SHKR 0.00 0.00 0.00 0.00 0 0 0 0.00

    VD 0.00 0.00 0.00 0.00 0 0 0 0.00

    BULK 0.00 0.00 0.00 0.00 0 0 0

    PL 814.18 23.03 10.38 5.46 18750 8448 4446 0.37

    MCH 0.00 0.00 0.00 0.00 0 0 0

    MDV 184.90 186.46 9.87 28.04 34477 1825 5185

    SSV Shale Shaker Variable 0.00 0.00 0.00 0.00 0 0 0

    CTV Cantilever Variable 168.50 224.95 19.86 42.20 37904 3347 7110

    DVF 8.00 222.93 0.00 69.50 1783 0 556

    QTV 0.00 0.00 0.00 0.00 0 0 0

    INC Incline Weights 441.03 151.43 -0.02 29.70 66785 -10 13098

    2004.52 105.87 10.67 16.40 212223 21388 32873 0.42

    LIGHTSHIP WEIGHT: Rotary Position: -16.50 ft aft of the transom

    LS-1 Hull Basic 12117.54 143.21 -1.16 28.70 1735353 -14056 347773

    LS-2 Cantilever 0 1369.15 185.51 -1.98 40.93 253991 -2711 56039

    LS-3 Drill Floor 0 1692.74 221.89 -3.96 91.17 375602 -6703 154327

    LS-4 Legs (477 ft - 0 ft TOC) 8291.02 144.80 0.00 209.94 1200500 -19 1740622

    477Ft. Leg - Lightship Wt. 23470.45 151.91 -1.00 97.94 3565446 -23489 2298762

    VSUM 2004.52 105.87 10.67 16.40 212223 21388 32873 0.42

    VL 0.00 0.00 0.00 0.00 0 0 0

    25474.97 148.29 -0.08 91.53 3777670 -2101 2331634 0.42

    25474.97 148.29 -0.08 88.11 3777670 -2101 2244579 0.42

    Misc. Tanks

    Liquid Mud

    Drill Water

    Diesel Fuel

    DESCRIPTION

    (VARIABLE

    LOAD)

    Potable Water

    Incline 10.50

    CONDITIONS AFLOAT:

    Total - Variable Load

    Quarters Variable

    Preload

    477 Ft. Load/Displacement

    Leg Variable Load

    Main Deck Variable

    Machinery Deck Variable

    Mud Processing

    Voids

    Drill Floor Variable

    Deck Variable Load

    Bulk Material

    TOC

    LOADING SUMMARY:

    Copyright 2014 Cameron

    PAGE E-5

  • LeTOURNEAU HULL NO. 244

    SAMPLE INCLINE LOADING CONDITION

    V351

    Wind Velocity 12 Knots

    Leg Length 477 Feet Afloat 4095 Kips

    Tip of Can (TOC) Below BL 10.50 Feet Elevating & Preload 4095 Kips

    Centerline of Rotary 16.50 Feet Fwd Transom Drilling 8141 Kips

    Elevated Storm 4841 Kips

    Item UNITS

    No:

    STABILITY CALCULATION

    DISP 25,475 Kips

    DENS 64.00 Lbs/cu Ft

    DVOL 398,046 Cu Feet

    DRFT 15.79 Feet

    VCG 88.11 Feet

    LFSC 0.18 Feet

    TFSC 0.42 Feet

    MFSC 0.42 Feet

    KG 88.53 Feet

    MKG 91.84 Feet

    KGM 3.31 Feet

    TRIM CALCULATION

    LEN 243.08 Feet

    KML 256.90 Feet

    KGL 88.29 Feet

    GML 168.61 Feet

    LCB 146.16 Feet

    LCG 148.29 Feet

    TLEV 2.13 Feet

    TRIM 3.07 Feet

    HEEL CALCULATION

    WID 206.00 Feet

    KMT 151.82 Feet

    KGT 88.53 Feet

    GMT 63.29 Feet

    TCB -0.09 Feet

    TCG -0.08 Feet

    HLEV 0.01 Feet

    HEEL 0.02 Feet

    Incline @ Initial Position

    Maximum Allowable Variable Loads

    DESCRIPTION SOURCE

    Displacement From Load Form Page 5

    Water Density Observed

    Displacement Volume From Load Form Page 5

    Mean Draft (@ LCF) From Hydrostatics

    VCG (Uncorrected) From Load Form Page 5

    LFSC Sum From Load Form Page 5

    TFSC Sum From Load Form Page 5

    Maximum Free Surface Correction Larger of LFSC or TFSC

    Corrected KG KG = VCG + MFSC

    Allowable KG (Rig Move) Allowable KG Curve, Page B-3

    KG Margin KGM = MKG - KG

    Hull Length From Operating Manual Chapter I

    KML From Hydrostatics

    Corrected KGL KGL = VCG + LFSC

    GML GML = KML - KGL

    LCB From Hydrostatics

    LCG From Load Form Page 5

    Trimming Lever TLEV = LCG - LCB

    Trim (Feet) (+ Stern) TRIM = LEN x TLEV / GML

    Hull Width From Operating Manual Chapter I

    KMT From Hydrostatics

    Corrected KGT KGT = VCG + TFSC

    GMT GMT = KMT - KGT

    Heel (Feet) (+ Stbd) HEEL = HLEV x WID / GMT

    TCB From Hydrostatics

    TCG From Load Form Page 5

    Heeling Lever HLEV = TCG - TCB

    Copyright 2014 Cameron PAGE E-6

    TitleTable of ContentsRevisionsIntroduction1. Scope2. Terminology3. Significance and Use4. Pre-Stability Test Preparation5. Test Weights6. Deadweight Survey7. Inclining Procedure8. Drill Package Weight VerificationAppendix A - Equipment/ResponsibilitiesAppendix B - IllustrationsAppendix C - HydrostaticsAppendix D - FormsAppendix E - Preliminary Load-out