DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

Mar 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

1

Page 2: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

DART“It’s All Connected”

Timothy H. McKay, P.E.Senior Vice President

Rail Program Development

January 25, 2010

2

Page 3: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

AGENDA

• DART System Overview• Green Line Expansion (CM/GC)• Orange Line Expansion(DB)• Blue Line Expansion(DB)• Cotton Belt (PPP)• Rail Project Life Cycle• Lessons Learned

3

Page 4: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

Light Rail Expansion through 2018

Irving/DFW Corridor2011-2013

Rowlett Corridor2012

Northwest Corridor2010

Southeast Corridor2009-10

South Oak Cliff Extension2018

2nd Downtown Alignment2016

4

Page 5: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

• Daily average 1,475 workers- 95% local residents

• 3 major contracts- Total value - $1 Billion- Paid to date - $800 Million (through

November 30, 2009)- 80% complete to date (through

November 30, 2009)

• Safety Rates- Workforce hours to date – 9,890,209- DART Recordable 2.02 (National 5.4)- DART Cost Measurement Goal $.35 - Actual cost to date is $0.17

Green Line Construction

5

Page 6: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

DART Employees

• Photo “ID” Badge

– 4-Hour Construction Training

• Visitor Badge(s)

– Escort Required

– Non-Escort Required

Contractor Personnel

• Photo “ID” Badge

– Drug Test

– Criminal Background

– Social Security – Verification

– 4-Hour Construction Training

– Visitor Badge(s)

Construction Safety & Security Program

6

Page 7: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

Alternative ProjectDelivery Systems

Use of CM/GC’s• Early Involvement of Contractor to Assist in Validation of

Costs and Schedule• Collaboration With all Members of the Project Team• Reduction of Changes During Construction

7

Page 8: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

8

Orange Line Design-Build(Irving 1 & 2)

• Contractor: KSWRPKiewit, Stacy & Witbeck, Reyes, Parsons

• Contract Value: $430M

• Design: - Majority of Design Complete- Systems Design Underway

• Construction:- Ready to Cross Levee with Trinity

River Bridge- Site Prep for Station Construction- Excavation Underway in I-2

Page 9: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

Blue Line Design-Build(Rowlett 1)

• Contractor: Austin Bridge & Road

• Contract Value: $187M

• Design:

- Art & Design Nearing Completion

- Focus on Design of Bridge Structure

- Ongoing Utility & Drainage Efforts

• Construction:

- Clearing Efforts Completed

- Haul Road Installed

- Shaft Drilling at Rowlett Creek9

Page 10: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

Cotton Belt Project

• Project Objective Enhance Regional Rail• Provide Connections to:

- Red Line in Plano/Richardson- Green Line in Carrollton and DCTA A-train- Orange Line and The “T “ at DFW Airport- TRE in Ft Worth

10

Page 11: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

11

Page 12: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

DART Vehicle Concept

12

• Diesel Powered Multiple Unit (DMU)

• Meets Board Commitments to Dallas

• Meets DART Policy for Vehicle on Cotton Belt Corridor

• Complies with Federal Railroad Administration (FRA) Requirements

• Potential Regional and National Vehicle

Page 13: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

DFW Connection - Phased Approach

13

Page 14: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

CPRF to add project to

Financial Plan & System Plan

Includes documented:

Scope

Budget

Schedule

Risk Categories

Displayed on Project Portal

Turn-over to

Operations

Alternatives Analysis PE/D/FEIS Final Design Procurement Construction

Testing/

Start-up

Design Change Control (DCC) in effect

Change Control Board (CCB) in effect

Annual Project Reviews

Performed in January

CPRF submitted in March (if necessary)

Quarterly Reviews

10%

EE

ICE

5%

EE

95%

EE

65%

EE

ICE

VE Validation

Risk Assessment Validation

Negotiations on FFGA

30%

EE

System Planning

ROD &

FTA Decision

to Enter FD

FTA Decision

to Enter PE

Mitigation Monitoring

100%

EE

ICE

FFGA

Regional

Transporation

Plan

Tuesday, August 19, 2008

Page 1

Rail Project Implementation Lifecycle Summary - Federally Funded

PROJECT COST/ESTIMATING CONSIDERATIONSDesign Contingency

Function of design/estimating uncertaintiesConstruction Contingency

To fund Contract Changes Governed by CCB

Program/Project Contingency Function of Risks

Escalation

10% - 30%

Project Management Plan

Delivery Method

Packaging of Work

Organizational Struct.

Budget

Schedule

Value Engineering

Risk Assessment

Trigger DCC

Rail Project Lifecycle

14

Page 15: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

15

Page 16: DARTAGENDA •DART System Overview •Green Line Expansion (CM/GC) •Orange Line Expansion(DB) •Blue Line Expansion(DB) •Cotton Belt (PPP) •Rail Project Life Cycle Light Rail

16