Top Banner
Agenda I. Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’ + 5’) IV.Thermo-mechanical analysis – M. Delonca (25’ + 5’) V. BREAK (15’) V. Conceptual and detailed design – M. Fürtinger (25’ + 5’) VI.Controls for movable BIDs – R. Folch (10’ + 5’) VII.Manufacturing strategy – R. Folch (15’) VIII.Discussion – All (15’) 15.03.1 2 1 R. Folch EN/STI - BID Workpackage Review - March 2012 End 12:00 https://indico.cern.ch/conferenceDisplay.py?confId=181008
12

Agenda

Jan 04, 2016

Download

Documents

Julie Welch

Agenda. https://indico.cern.ch/conferenceDisplay.py?confId=181008. End 12:00. Workpackage overview – R. Folch (25’ + 5’) Functional requirements of the BIDs – R. Folch (5’ + 5’) FLUKA simulations - A. Christov (15’ + 5’) Thermo-mechanical analysis – M. Delonca (25’ + 5’) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Agenda

R. Folch EN/STI - BID Workpackage Review - March 2012 1

AgendaI. Workpackage overview – R. Folch (25’ + 5’)II. Functional requirements of the BIDs – R. Folch (5’ + 5’)III. FLUKA simulations - A. Christov (15’ + 5’)IV. Thermo-mechanical analysis – M. Delonca (25’ + 5’)V. BREAK (15’)V. Conceptual and detailed design – M. Fürtinger (25’ + 5’)VI. Controls for movable BIDs – R. Folch (10’ + 5’)VII. Manufacturing strategy – R. Folch (15’) VIII. Discussion – All (15’)

15.03.12

End 12:00

https://indico.cern.ch/conferenceDisplay.py?confId=181008

Page 2: Agenda

R. Folch EN/STI - BID Workpackage Review - March 2012 2

VI. Controls for the movable BIDs

15.03.12

• Devices concerned– Scrapers (beam shaping and diagnostic)– MEBT dump and Beam stoppers (safety relevant)

• Work statusDefine the limit of scope of the workpackageDefine the actuating systems and FE electronicsCreate the Xml files for BIS controlsDefine the controls and cabling schemes • Define the size and location of the patch panels

Page 3: Agenda

Master LayoutMA-00492-a-THA-V1.1

MEBT Dump

Scraper horizontal

Beam Stopper(4x)

Scraper vertical

Page 4: Agenda

Control scheme for the scrapers

Cone

ction

box

2 x Scraper Vertical (MR-0011-SCV-A)2 x Scraper Horizontal (MR-008-SCH-A)

< 10 m

Elec

tric

al a

ctua

tor

(Bru

shle

ss m

otor

)

DC supply& Encoder

Main control rack

WP limit

BIDBD

Intermediate control rack

10-30 m

BD?

15.03.12 R. Folch EN/STI - BID Workpackage Review - March 2012 4

Page 5: Agenda

5

Risk of radiation on scrapers drivers?

15.03.12 R. Folch EN/STI - BID Workpackage Review - March 2012

• CERN uses stepping motors with radiation hard resolvers, and has no data on the radiation sensitivity of the opto-encoders of the brushless motors

• CNAO uses brushless motors and does not consider radiation effects as a critical issue (no failure expected < 10Gy)

• MedAustron simulations for the ionizing dose rate < 0.1 Gy/y (scrapers losses not considered)

• MedAustron decision:– OK for brushless motors for scrapers– Design for easy replacing of the driving in case of failure

Page 6: Agenda

R. Folch EN/STI - BID Workpackage Review - March 2012 6

Beam interlock interface design

• Applicable to safety related devices– Beam stoppers (BST)– MEBT dump (BDM)

• Reference document

15.03.12

Page 7: Agenda

R. Folch EN/STI - BID Workpackage Review - March 2012 7

Definitions, channels, specifications

15.03.12

ES-100107-a-MMA v.1.3

Page 8: Agenda

R. Folch EN/STI - MACS Week - October 201108.2011 8

Beam Interlock System signals for the beam stoppers and the MEBT dump

04.10.11

BST BDM

Page 9: Agenda

9

XML files for the Interlock ControlThe XML files for the 4 beam stoppers and the MEBT dump are completed and uploaded on SVN according to WP CO procedure

15.03.12

Page 10: Agenda

Control scheme for the BST and the BDM

Compressed air supply

Pressure regulator

Electro-valve

Pressure sensor

Pneu

mati

c cy

linde

r

v

Beam Interlock System rack

BID patch panelBeam Intercepting Device

1 x MEBT Dump (ME-00-000-BDM-A)4 x Beam Stoppers (Tn-00-000-BST-A) n = 1, 2, 3, 4

1-3 m 10-30 m

WP limitBID CO

Pressure sensor (to CR?)

- IN (out of beam)

- OUT (BID is out of beam)

- OUTR (wired to CR for redundancy)

- Veto (in beam, ignore -IN)

OUT (BID is in the beam)

OUTR (wired to CR for redundancy)

(free)

Cable NEA 18

(free)

K

PLC

15.03.12 R. Folch E/STI - BID Workpackage Review - March 2012 10

Page 11: Agenda

R. Folch EN/STI - BID Workpackage Review - March 2012 11

Cables routing and patch panel

15.03.12

Proposal from D. Grenier based on Linac 4 design

Page 12: Agenda

R. Folch EN/STI - BID Workpackage Review - March 2012 12

AgendaI. Workpackage overview – R. Folch (25’ + 5’)II. Functional requirements of the BIDs – R. Folch (5’ + 5’)III. FLUKA simulations - A. Christov (15’ + 5’)IV. Thermo-mechanical analysis – M. Delonca (25’ + 5’)V. BREAK (15’)V. Conceptual and detailed design – M. Fürtinger (25’ + 5’)VI. Controls for movable BIDs – R. Folch (10’ + 5’)VII. Manufacturing strategy – R. Folch (15’) VIII. Discussion – All (15’)

15.03.12

End 12:00

https://indico.cern.ch/conferenceDisplay.py?confId=181008