1 AFTER MILESTONE C DECISION- WHAT’S NEXT? by Rick Decker Director, Engineering - 8 March 2006
25

AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

Sep 23, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

1

AFTER MILESTONE C DECISION-WHAT’S NEXT?

by Rick DeckerDirector, Engineering - 8 March 2006

Page 2: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

2

OUTLINE

• Chemical Biological Defense Program Environment• Big “A” Acquisition• DoD OSD Acquisition, Technology and Logistics Goals• Joint Service Sustainment• DoD Operating Environment• JPEO/JPM Responsibilities/Initiatives:

• Total Life Cycle Systems Management (TLCSM) Responsibilities

• Logistics Information Technology Initiative • Joint Logistics Advisory Council for CBD

(JLAC-CBD) Initiatives• The End State• TACOM LCMC/ECBC Partnership• Conclusions

Page 3: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

3

Required Capabilities, Science & Technology, and Acquisition

Page 4: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

4

CBDP Major Players

Dr. Kenneth J. KriegUnder Secretary of Defense(Acq, Tech, and Logistics)

Jean ReedSpecial Assistantfor CB Defense & Chem Demil

BG Stephen V. Reeves

JPEO-CBD

Dr. Charles Galloway

Director, JSTOMG Howard Bromberg

JRO-CBRND

Mr. Walter HollisJoint T&E

Executive Agent

BG Stan LillieJoint Combat

Developer

Dr. Dale KleinATSD(NCB)

Dr. James Tegnelia Director, Defense Threat Reduction Agency

Secretary of the Army (Executive Agent)

Dep. Under Sec. Army Army Chief of Staff Army Acquisition Executive

Mr. Andy Blankenbiller Program Analysis & Integration Office

ADM Evan M. ChanikDirector, J-8

General Peter Pace Chairman, Joint Chiefs of Staff

Army Chief of

Staff

GEN Benjamin GriffinArmy Materiel Command

MG Roger NadeauResearch Development and Engineering Command

Jim ZarzyckiDirector, Edgewood Chemical Biological Center

GEN Richard A. Cody Vice CoS, US Army

GEN James CartwrightCMD, USSTRATCOM

Dr Pete Nanos

MG Jeffrey Sorenson Deputy, Acq & Sys Mgt Assistant Secretary of the Army for Acq, Log & Tech

Dr. Tom Killian

Deputy Asst Secretary for R&T Chief Scientist

Page 5: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

5

Joint Program Executive Office forChemical and Biological Defense

Leadership Team

Page 6: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

6

Page 7: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

7

CAPABILITYNEED

CAPABILITYNEED

ACQUIREDEVELOP

CONTRACTTEST

PRODUCEFIELD

ACQUIREDEVELOP

CONTRACTTEST

PRODUCEFIELD

acquisitionaacquisition

OPERATE/SUSTAIN

UPGRADE/MODERNIZE

FMS

OPERATE/SUSTAIN

UPGRADE/MODERNIZE

FMS

RETIREDEMIL

RETIREDEMIL

ACQUISITIONAACQUISITION

D O T L M P FD O T L M P F ??

The ProcessThe Process

RESOURCESRESOURCES

Doctrine, Organizations, Training, Leader Development, Materiel, Personnel, Facilities

Page 8: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

8

GOALS AND OUTCOMES

• High Performing, Agile and Ethical Workforce

• Strategic and Tactical Acquisition Excellence

• Focused Technology to Meet Warfighting Needs

• Cost-Effective Joint Logistics Support for the Warfighter

• Reliable & Cost Effective Industrial Capabilities Sufficient to Meet Strategic Objectives

• Improved Governance and Decision Processes

Page 9: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

9

Joint Systems Acquisition Total Life Cycle Systems ManagementJoint Systems Acquisition Total Life Cycle Systems Management

Joint Sustainment –“The Torture Triangle”

Page 10: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

10

OPERATING ENVIRONMENT

• Service Title X Responsibilities• O&M Funding Owned by Services• Established Responsibilities, Policies, and

Processes• DoD “5000” Acquisition System

Responsibilities

Public Law No. 103-160, Section 1701 (50 USC 1522)- Coordinate and Integrate all DoD Chem Bio Defense Programs

- Annual Reports to Congress on readiness and plans to improve

Page 11: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

11

Total Life Cycle Systems Manager (TLCSM) Responsibilities

• Total Package Fielding – AR 700-142 “The TLCSM is responsible for programming and budgeting for the necessary funding.”

– Initial Support Packages/Spares– New Equipment Training– Second Destination Transportation to Hand off Site

• Readiness Reviews – Emphasize Roles and Importance of the JPM’s as the TLCSM

– Monthly Readiness Review • Internal – Continuing Issue Items Briefed at the Joint

Review– Joint Quarterly Readiness Review

• External – Brings our Customers into the Process

JPEO/JPM Must Work With DLA, Service Sustainment and Industry Partners

Page 12: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

12

Logistics Information Technology TLCSM Support

JPEO/JPM Establishing IT System

Page 13: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

13

Page 14: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

14

Page 15: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

15

Joint Logistics Advisor Council (JLAC) – Initiatives

• Joint Maintenance– Implement Joint Maintenance Concepts on Fielded Systems

Where Maintenance is Not Joint• Joint Equipment Assessment Program (JEAP)

– Formal Process for Equipment Surveillance and Assessment• Joint Materiel Fielding

– Integrate, Streamline and Standardize Four (4) Existing Processes into One (1) Executable Joint Process

• Joint Individual Protective Equipment Strategic Asset Management– Joint Individual Protective Equipment Strategic Asset Manager– Reduce War Reserve Requirements, Redundancies and

Mitigate Industrial Base Risks• Joint Training Working Group

– Training Plans and Requirements– New Equipment Training

• Joint Service Maintenance Tool

JPEO/JPM Working to Develop New Initiatives

Page 16: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

16

Joint Logistics Board (JLB) – Joint Sustainment Initiatives

AgileSustainment

OperationalEngineering

MultinationalLogistics

HealthProtection

InformationFusion

J Total Life Cycle Mgt

JDMAG **Peer-to-Peer

Joint Packaging DMSMS

JLBJLB

JLGJLG FL FCB *

DeploymentDistribution

Joint Aviation Logistics

(Peer-to-Peer)

Joint Ordnance

(Peer-to-Peer)

Materiel Readiness

LCM

JPEO-CBD – Within Materiel ReadinessLife Cycle Management (MRLCM)

DoD is Currently Reorganizing the JLB. The Chart Depicts the JLB’s Proposed Structure.

• * = Focused Logistics Functional Capabilities Board • ** = Joint Depot Maintenance Activity Group

Page 17: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

17

Joint Sustainment:The END-STATE

TOTAL LIFE CYCLE SYSTEMS MANAGEMENT (TLCSM)Concept

RefinementTechnology

DevelopmentSystem

Development &

Demonstration

Production & Deployment

Operations & SustainmentOperations & Sustainment

A B C

IT Enabled (UID, RFID, Serialization)IT Enabled (UID, RFID, Serialization)

Industrial Base Decision Support Tools (IBST)

Industrial Base Decision Support Tools (IBST)

Prognostics, Diagnostics, & Embedded…Prognostics, Diagnostics, & Embedded…

Equipment Assessment & DisposalEquipment Assessment & Disposal Joint Surveillance

Joint Maintenance

CBDE StrategicManagement

JACKS

Performance Based Joint Sustainment

Performance Based Joint Sustainment

Performing Based Logistics (PBL)Performing Based Logistics (PBL)

Page 18: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

18

1:4:2:1 Requirement

DOD IPEInventoryManager

Industrial Base Supply Chain

Process Model

Expendable Equipment Combat Consumption (E2C2)Model

Planning

OperationalExecution

Total Requirement

Determine overall requirement

Predict consumption

Determine incremental requirements

Optimal inventory and IB to meet req.

Distribution plans and strategies.

Funding req., strategies, plans

Service InventoryManagers

Manufacturers

Strategic Inventories

Depots Afloat

JPMOsJPMOs

JPMOsJPMOs

A concept for Integrating the Pieces for Joint TLCM

Life Cycle Management/Acquisition

ProductSupport

Integrator

Oversight

Management

Coordination/Communication

Joint EquipmentAssessmentProgram (JEAP)

• Surveillance• Shelf Life Management• Consolidated DOD Recovery

MEMSAIT

RLI

Serialization

UID/RFID

J-8 (JRO)

JointILA/MR

ModelingParameters

CWDE Marking

Guide

JACKS

JTAVRW

Center of

GravityEnablersRLI – Residual Life Indication; MEMS – Micro-electronic mechanical systems; AIT – Automatic Information Technology; UID – Unique Identification

JACKS – Joint Acquisition Knowledge System; JTAVRW – Joint Total Asset Visibility Reporting Warehouse; RFID – Radio Frequency Identification

Page 19: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

19

“Spiral” Development 2005 - 2030

IntegratedFootwear Solution (06)

AlternateFootwear Solution (06)

Joint Chemical Ensemble (12)

Joint Service GeneralPurpose Mask (06)

Self Detection Self Decon 20302005

Fully IntegratedWarrior as a Systems

WaaS

Individual Combat Clothingand Equipment

Joint Service Lightweight Integrated Suit Technology

Providing Increments of Capability

Hydration System

2006 2010 2020 2030

Page 20: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

20

TACOM LCMC/ECBC Partnership

Page 21: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

21

Defense Logistics Agency Support to Contractors

• Authorized by Public Law 107-314, Section 365• Implemented November 18, 2005

– USD Acquisition, Logistics and Technology Memorandum• Defense Logistics Agency (DLA) May

– Directly Contract with Weapons Systems Contractors• Distribution, Disposal, and Cataloging of Materiel • Must not Degrade Core Mission or Directed Workload

– Authority Expires September 30, 2007• Conditions

– Weapons Systems Contract Must Have Been Competitive– Support No More than Five (5) Weapon Systems Contracts– DLA Accepts No More than $100,000,000 for All Contracts– Contract Period No More than a Five (5) Years

Page 22: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

22

Bottom Line: Contractor Impacts Public Law 107-314, Section 365

• Contractors can Subcontract with DLA for Certain Work

– Subject to Conditions/ Limitations

• DLA Can Support Contractors on a Reimbursable Basis

– Cataloging

– Distribution

– Disposal

Page 23: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

23

PERFORMANCE BASED LOGISTICS (PBL)

• PBL Business Case Analysis Policy – August 18, 2005

– All Army ACAT Programs or Joint Programs Where the Army is Lead Service and/ or Will Transition to Army

• PBL Tool Kit

– Defense Acquisition University – https://acc.dau.mil/log

• Acquisition Community Connection Under “Logistics”

Page 24: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

24

CONCLUSION

• CBD is a Low-Density Critical Warfighting Commodity– Increasingly Technical and Complex

• Requires Joint Multi-Agency Strategic Management Approach – Supported by Current Service Consolidation

Efforts • Incremental Implementation Approach

– Developmental Items – Fielded Systems– Partnership between DLA, Service

Sustainment, Industry, Academia and JPMs Hold the Key to Joint CBD Sustainment

Page 25: AFTER MILESTONE C DECISION-€¦ · ADM Evan M. Chanik Director, J-8 General Peter Pace Chairman, Joint Chiefs of Staff Army Chief of ... - Annual Reports to Congress on readiness

25

Coffee with the Technical Director

Jim ZarzyckiNovember 2005

AN RDECOM LABORATORY

Preparing the warfighter to meet the chemical biological threat

An important part of fighting and winning the Global War on Terrorism

Rick DeckerDirector of Engineering

410-436-5600www.ecbc.army.mil

Gabe Patricio, JPEO703 681-0808

Robert Wattenbarger, JPMOIP703 432-3198