No construction waste, with high recycle value. 80% components can be re-used in next project. No cranes, skilled labor, and overhead are required. Excellent surface finish with more seismic resistance. 200 times repetition, no plastering, very cost-effective. 4~6 days each floor, monolithic pour(slab). Speed The advantages of this system are… Maintenance Quality Economy Recyclability Compatibility
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
No construction waste, with high recycle value.
80% components can be re-used in next project.
No cranes, skilled labor, and overhead are required.
Excellent surface finish with more seismic resistance.
200 times repetition, no plastering, very cost-effective.
4~6 days each floor, monolithic pour(slab). Speed
The advantages of this system are…
Maintenance
Quality
Economy
Recyclability
Compatibility
Pouring concrete
In-situ construction by aluminum formwork
Formwork engineering is not only technically challenging but also required to have practising professionals and expertise. We have a good team of designers, engineers, architects, trained workers at back stage, whose professional knowledge and dedication always gives satisfied solutions and trusted advice to our partners.
If you wish to use old formwork system from the past projects in new projects, our engineers could help you re-arrange the panels and components in such a way that maximize the utilization of formwork system itself, thereby minimize your expenditure in purchase of new one.
Apart from the sales of entire formwork system, we also like to manufacture the standard panels and components, such as 400*2400,400*2700mm, and other sizes upon customer’s request. OEM&ODM services are also available.
Quick glance at the formwork mock-up
Formwork system for high-rise buildings
Formwork system in African countries
Unexceptionally smooth after stripping
Integral and smooth finishing of wall and slab
Step 1:In we use state-of-art software to create best formwork system for your building project or business after receipt of the drawings(DWG format preferred).
Step 2:Our engineer team works closely with you to convert architectural plans to 3D shell models, the calculation of costing is carried out, we prepare and present the proposal. And then, you can execute the budget planning next.
Step 3:After you have approved the formwork solution, the final drawings and detailed work instruction are dispatched to start production.