Top Banner
Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential Setting in Louisiana October 2015 Steven Aufdenkampe – Norfolk Southern Tracey Hall - AECOM
9

Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

Jul 09, 2018

Download

Documents

phamkhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential Setting in Louisiana

October 2015

Steven Aufdenkampe – Norfolk SouthernTracey Hall - AECOM

Page 2: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

2

Aesthetic Impacts to the EnvironmentRailroads transport a variety of products from perishable goods to hazardous materialsDegradation of perishables:• Odor

• Ambient weather• Wind direction• Atmospheric conditions• Amount of material• Sub-surface spill conditions

• Visually Unpleasing

Page 3: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

3

New Orleans, Louisiana

SITE

Page 4: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

4

Spill Area

Page 5: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

5

“Spilled Goo”

Remedy could not:• Disturb or compromise the integrity of the tracks• Increase the odor• Produce runoff that may drain to drainage system

Page 6: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

6

Bench Scale and Pilot Study

Bench Scale Testing• Hot Water Flush

• 25o F• 75o F• 100o F• Steam

• Chosen temperature: 75o F

Field Pilot Study• Hot Water Flush• SuperAll (Surfactant)

Page 7: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

7

Full Scale Implementation

• One mobilization• No further odor complaints have been reported to LDEQ • LDEQ has closed the issue

Page 8: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

8

Conclusions

• Low tech approach often adequate• Chemicals or cleaners unnecessary• Avoid dig-and-haul• Non-quantitative regulatory• Track integrity consideration with remediation alternatives

Page 9: Aesthetic Impact Mitigation at a Sugar Spill Site in a ...railtec.illinois.edu/RREC/pdf/2015 RREC/44_Aufdenkampe.pdf · Aesthetic Impact Mitigation at a Sugar Spill Site in a Residential

9

Recommendations

• Preventative Measures• Sweepers• Inspections

• Immediate Cleanup