AES Corporation Energy Storage & Advancion ®
8

AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

Jul 31, 2018

Download

Documents

truongkien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

AES CorporationEnergy Storage & Advancion®

Page 2: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

2

AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid

Contains Forward Looking Statements

AES Proprietary and Confidential

Credit: GE

KilrootNorthern Ireland

Alamitos US‐CA 

Tait, US‐OH

Laurel Mountain US‐WV

Northern Ireland Project #2

AngamosChile Cochrane   

Chile   

Operations: 116 MWConstruction: 50 MWLate Stage Development: 218 MW

IPLUS‐IN 

Philippines   Project   

Texas   Project   

Dominican Republic Project

AdvancionTMApplications Center US‐PA

Warrior Run,US-MD

Zeeland, Netherland

s

Los Andes,Chile

Page 3: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

The AES Corporation.  All rights reserved.

Page 4: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

4

Initial project leading to over 100MW of energy storage in Chile

• Edison Award 2012 24 MW Los Andes ResourceAtacama, Chile

• Primary & secondary reserves• Contingency management

Impact: Avoided load shedding and 

emergency curtailment Increased energy production & 

reduced cost Increased system security  Inertia‐like performance

Energy Storage Supplying Critical Spinning ReservesAES Proprietary and Confidential

Page 5: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

5

Serving PJM Interconnection – world’s largest power market

98 MW Laurel Mountain Wind Farmwith 64 MW Storage Resource

West Virginia, USA

Adding System Reliability with WindAES Proprietary and Confidential

Page 6: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

6

AES Advancion Array Providing 20MW of flexibility to Netherlands Market

20 MW Zeeland ResourceVlissingen, Netherlands

• Primary Control Reserve for integrated market (DE, NL, CH, AU)

Impact: Reduce total reserve cost Fast, accurate reserves Increased system flexibility Opportunity to explore fast 

resource benefits Scalable 

Storage Serving TenneT and Integrated Reserve MarketAES Proprietary and Confidential

Page 7: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

7

Project Description:• 2x50 MW advanced battery array• Provides local capacity reliability• 4 hour duration• 24x7 power resource• No emission or water• Tolling PPA

100 MW Interconnection (rendered)200 MW of flexibility (discharge + charge)

AES Advancion Selected by SCE in Competitive RFP and Awarded a 20 Year PPA Contract AES Proprietary and Confidential

Page 8: AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

8

Project Description:• 2x50 MW advanced battery array• Provides local capacity reliability• 4 hour duration• 24x7 power resource• No emission or water• Tolling PPA

100 MW Interconnection (rendered)200 MW of flexibility (discharge + charge)

AES Energy Storage Offering to CaliforniaAES Proprietary and Confidential

Kiran KumaraswamyMarket Development DirectorAES Energy Storage571‐527‐[email protected]

AES Proprietary and Confidential