AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain
19

AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

Dec 15, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

AER’s Draft Decision for NSW distributors 2015-2019

Consumer Challenge Panel Response

AER Pre-determination Conference

8 December 2014

Bruce Mountain

Page 2: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

Outline

• Prices (from 1 July 2015)

• Profits

• Revenue

• WACC

• RAB

• Opex

• Capex

2

Page 3: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

Average network charges for households in NSW from 1 July 2015 will still be above Victoria average and compare poorly internationally

3

Source: EPRI, AER Draft Decision, Ofgem RIIO ED1 proposals, OECD (for PPP exchange rates), CME analysis

Page 4: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

NSW’s DNSPs have delivered remarkable pecuniary gains to their owner

4

* 2013/14 not included because interest rate data needed to calculate competitive neutrality fees no longer available

In 2012/13 NSW distributors’

pecuniary benefit per connection was

5.6 times higher than UK Power

Networks’ pre-tax profit per

connection.

Page 5: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

5

After the AER’s DD, AusGrid’s revenues will still be (much) higher than IPART allowed

IPART AER

Page 6: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

6

Likewise for Endeavour too (although gap not as large)

Page 7: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

And Essential’s increases relative to IPART’s last decision, much like AusGrid

7

Page 8: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

WACC: some progress, but still higher than IPART and even more so Ofgem. Why ?

8

* All Australian decisions rebased to use consistent 2014 Risk Free Rate

Page 9: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

DD Debt allowance is particularly problematic

9

Page 10: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

Following DD, NSW Regulated Asset Bases don’t decline in real terms

10

Page 11: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

11

And after DD, the gap between asset values in NSW, VIC and GB is still very large

Page 12: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

12

Progress has been made in respect of Endeavour’s opex allowance

Page 13: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

13

AusGrid is being allowed to charge users for as much opex as IPART allowed

Page 14: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

14

And likewise for Essential

Page 15: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

Compared to Vic DNSPs, the per customer DD opex allowances are still higher

15

Mainly urban

Mainly country

Page 16: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

16

Endeavour capex now back to first IPART control period allowance. This seems reasonable.

Page 17: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

17

AusGrid capex back to IPART allowances. This seems reasonable

Page 18: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

18

Likewise for Essential

Page 19: AER’s Draft Decision for NSW distributors 2015-2019 Consumer Challenge Panel Response AER Pre-determination Conference 8 December 2014 Bruce Mountain.

Summary of key points

• From CCP’s perspective, AER DD should set the high water mark for revenues, assets, WACC and expenditure. Compromises have already been made and back-tracking from here would be unwise.

• Opex and capex allowance seem roughly reasonable although some “adjustments” to the benchmarking to narrow the VIC-NSW gap is problematic and needs to be addressed.

• Allowance for Debt is too high. BBB calculations that do not reflect actual DNSP borrowing costs are flawed. The AER must have regard to actual borrowing costs.

• NSW DNSPs have recognised the significant inefficiencies that consumers have been pointing to for years. However, despite excessive costs, the regulatory outcomes have nonetheless delivered excessive profits. This must end. Shareholders, not consumers, must bear the consequence of inefficiency.

19