Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING GROUP M Montreal, Canada 18 – 21 November 2008 Data Communications Program Status (Presented by: Peter Muraca) SUMMARY This information paper is intended to provide status of on going activities within the FAA for the implementation of the Data Communications Program. ACP-WGM13/IP- 02 18 November 2008 Agenda Item: 1(a)
12
Embed
AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING GROUP M
AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING GROUP M Montreal, Canada 18 – 21 November 2008. Agenda Item: 1(a). Data Communications Program Status (Presented by: Peter Muraca). Topics. Program Update Current Program Activities Avionics Standards Development - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Federal AviationAdministration
International Civil Aviation Organization
INFORMATION PAPER
AERONAUTICAL COMMUNICATIONS PANEL (ACP)
13th MEETING OF WORKING GROUP M
Montreal, Canada 18 – 21 November 2008
Data Communications ProgramStatus
(Presented by: Peter Muraca)
SUMMARY
This information paper is intended to provide status of on going activities within the FAA for the implementation of the Data Communications Program.
ACP-WGM13/IP-0218 November 2008
Agenda Item: 1(a)
Data Communications Program – Status
ICAO ACP WG-M #132
Topics
• Program Update
• Current Program Activities– Avionics Standards Development– Air-Ground Communications System Acquisition– Specifications Development
• Next Steps (towards Final Investment Analysis)– Economic Analysis– SIR Development– Equipage Strategy– Prototype and Test– Implementation Strategy Planning
Data Communications Program – Status
ICAO ACP WG-M #133
• Successfully completed Initial Investment Decision – July 2008• Entering Final Investment Analysis phase
Program Update
Data Communications Program – Status
ICAO ACP WG-M #134
2010 20112008 2009
WP1 + WP2
WP1Draft
WP2Draft
StandardsPublication
SC-214/WG78Scope
SC-214/WG78Scope
WP1WP1 WP2WP2
ED-120/DO290Services
ED-120/DO290Services
D-TAXID-TAXI
D-OTISD-OTIS
FLIPINTFLIPINT
D-FLUPD-FLUP
4DTRAD4DTRAD
CPDLC for ATSA-ITPCPDLC for ATSA-ITP
SC-214/WG-78 Standards Development
WWW.FAA.GOV/GO/SC214WWW.FAA.GOV/GO/SC214
Data Communications Program – Status
ICAO ACP WG-M #135
Air / Ground Communications System Acquisition
• Conducted bilateral meetings with potential vendors throughout Summer 2008
• Released Request for Comment 30 Oct 08– Summarizes FAA's Data Communications operation environment– Continue to communicate with industry on the details of the service
acquisition
• Developing draft acquisition strategy paper to be released to industry for comment– The exact scope of the service and contract are still under development
Data Communications Program – Status
ICAO ACP WG-M #136
Specifications Development
• Specifications development activities– En Route SSD– Tower SSD– Communications Service Provider SSD– Infrastructure SSD– Maintenance, Monitoring and Control CONOPs/SSD
Data Communications Program – Status
ICAO ACP WG-M #137
Final Investment Analysis – Activities
• Economic Analysis– Cost estimation development for software development,
hardware procurement, air-ground network acquisition, equipage incentivization, etc.
– Develop understanding of system benefits to include operational scenarios
• SIR Development– Create acquisition documents for air-ground network– Release of Request for Proposal to industry– Proposal evaluation
• Coordination with overall NextGen rulemaking plan
• Prototype and Test– Services Validation– Security, HF– Aircraft / Flight test capabilities– Interoperability– Communication Infrastructure– Demonstrations– Foundation for formal T&E process
• Implementation Strategy Planning– Target ARTCCs to maximize benefit – Early stages – roll out plan / trade space analysis
- Develop and Release SIR- Receive and Evaluate proposals- Develop Interface Requirements- Mid-term Human Factors and Standards- Finalize Business Case Analyses- Complete JRC 2B, Final Investment Decision- Contract Awards
InvestmentAnalysis
ReadinessDecision
Key Sites:
Program Timeline
Data Communications Program – Status
ICAO ACP WG-M #1311
Controller Flight Crew
1.0 Ground User
Interface (GUI)
2.0 Ground Data
Processing (GDP)
3.0 Ground Message Delivery
(GMD)
4.0 Air-Ground
Message Delivery (AGMD)
5.0 Airborne Message Delivery
(AMD)
6.0 Airborne
Data Processing
(ADP)
7.0 Airborne
User Interface
(AUI)
FAA System Scope
Program Scope
User System Scope
• FAA System Scope– Program funds enhancements required to perform data communications in:
• Ground User Interface (e.g. ERAM/DSR display software)• Ground Data Processing (e.g. application software to create clearances)• Ground Data Delivery (e.g. wide area networking between ground facilities)• Ground components of A/G Message Delivery (e.g. radio, ground antenna)
• User System Scope– Users fund enhancements required to perform data communications in:
• Airborne components of A/G Message Delivery (e.g. aircraft radio, antenna)• Airborne Message Delivery (e.g. aircraft networking)• Airborne Data Processing (e.g. app s/w in comm & flight management units)• Airborne User Interface (e.g. cockpit displays & s/w)
System Scope
Data Communications Program – Status
ICAO ACP WG-M #1312