Top Banner
AePP Brief with New ACL Allan Yeh 3/01’2002 Purchasing Manager
20

AePP Brief with New ACL

Jan 21, 2016

Download

Documents

Ervin

AePP Brief with New ACL. Allan Yeh 3/01’2002 Purchasing Manager. Agenda. ACL Function and Operation Work Flow of PO System AePP Rule Others ACL: Access Control List VI: View & Logo, Acer  Wistron. Overview. What is AePP A dvanced eP rocurement P ortal - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AePP Brief with New ACL

AePP Briefwith New ACL

Allan Yeh 3/01’2002

Purchasing Manager

Page 2: AePP Brief with New ACL

2

AePP Brief (New ACL) 2/27’02

Agenda

•ACL Function and Operation•Work Flow of PO System•AePP Rule•Others

•ACL: Access Control List•VI: View & Logo, Acer Wistron

Page 3: AePP Brief with New ACL

3

AePP Brief (New ACL) 2/27’02

• What is AePPAdvanced eProcurement Portal a Web-based eProcurement application • PurposeA real time, single window platformTo enhances the efficiency of communication and

collaboration between Wistron and trading partners over internet

• ScopeInclude all Supplier and internet readyInclude Wistron WW Site and internet readyInclude all Buyer and all item

Overview

Page 4: AePP Brief with New ACL

4

AePP Brief (New ACL) 2/27’02

AePP Equipment Requirement

• Enter IP in Browser : hitech.wistron.com• Enter UID and Password to enter AePP• Browser must be IE5.0 (or above)• H/W Requirement

– P2 450MHz CPU– 128M Memory– 5M HDD Space

• Internet Bandwidth 56K (or above)

Page 5: AePP Brief with New ACL

5

AePP Brief (New ACL) 2/27’02

Purchase Order Process Flow

大型電腦WistronERP

AePP

Supplier

2. Send to AePP 3. Confirm PO

5. Buyer Accept PO and feedback to ERP5a. If Buyer does not accept PO, change the Req, repeat step 3、 4

4. Response PO

Buyer

1. Buyer release PO

Page 6: AePP Brief with New ACL

6

AePP Brief (New ACL) 2/27’02

Log in AePP

• IP : hitech.wistron.com (Test : hitech-test.wistron.com)• Enter User ID and Password, click “log in” to enter AePP

1.

3. 2.

Page 7: AePP Brief with New ACL

7

AePP Brief (New ACL) 2/27’02

Log in – the 1st time log-in AePP

• 1st log-in, have to change Password• Choice Membership and click change Password• Input Old Pwd, New Pwd and reCFM, click “Save ”

Page 8: AePP Brief with New ACL

8

AePP Brief (New ACL) 2/27’02

Ordering Function

1. Waiting Confirm PO2. Change PO Data3. Pass Due PO Report4. PO Data Report5. Open PO Report

Page 9: AePP Brief with New ACL

9

AePP Brief (New ACL) 2/27’02

Operation Step - Confirm PO

Click Purchase Order, Ordering and Waiting Confirm POClick the PO No. to CFM the PO

Page 10: AePP Brief with New ACL

10

AePP Brief (New ACL) 2/27’02

3. “Save”

4. Add Remark (If)

1. Change the CFM date.2. Split the PO (If)

Operation Step - Confirm PO

Page 11: AePP Brief with New ACL

11

AePP Brief (New ACL) 2/27’02

Operation Step - Split

“Split” the line, Total Qty must = Req Qty

Page 12: AePP Brief with New ACL

12

AePP Brief (New ACL) 2/27’02

Operation Step – Change PO

Enter PO Number, click “Query” and “PO_Number”

Page 13: AePP Brief with New ACL

13

AePP Brief (New ACL) 2/27’02

Operation Step – Change PO

Click “CHK” then click “Save”

4. Add Remark (If)

Page 14: AePP Brief with New ACL

14

AePP Brief (New ACL) 2/27’02

Operation Step – Change PO

Click “CHK” then click “Save”

4. Add Remark (If)

Page 15: AePP Brief with New ACL

15

AePP Brief (New ACL) 2/27’02

Operation Step – Pass Due Report

Page 16: AePP Brief with New ACL

16

AePP Brief (New ACL) 2/27’02

Operation Step – Pass Due Report

Page 17: AePP Brief with New ACL

17

AePP Brief (New ACL) 2/27’02

Operation Step – PO Data Report

Page 18: AePP Brief with New ACL

18

AePP Brief (New ACL) 2/27’02

Operation Step – PO Data Report

Page 19: AePP Brief with New ACL

19

AePP Brief (New ACL) 2/27’02

AePP P/O Rule - 1AePP P/O Rule - 1• Buyer is a key for AePP survive• PO CFM should within 48 Working Hrs• PO Qty can’t increase, should release new line or

new PO• PO can’t be cancelled(deleted), only Qty ==> 0• PO change (Qty, Req. Date, Price) have to get

Vendor reCFM then update ERP• Vendor check AePP PO data twice a day• Pass Due PO must be revised daily, couldn’t leave

PO reCFM passed.• One PO contain 10 ~ 20 lines (better operation)• Feedback the problem in eMail have better

describe with screen hard copy

Page 20: AePP Brief with New ACL

20

AePP Brief (New ACL) 2/27’02

AePP P/O Rule - 2AePP P/O Rule - 2• PO changed should add reason in Remark• PO Released, Vendor not yet responded or Buyer

not yet accepted, will be locked and RT can‘t be gen’d• if Vendor split PO, AePP PO line <> ERP

• PO changed in AePP, ERP PO line will be locked and RT can‘t be gen’d

• PO changed, can’t do another change before other one responded.

• Vendor split the PO only one time if Buyer didn't do any change.

• Ps. Time out on 30 min if no any operation in AePP