Template.ppt 2/17/2012 1 February 17, 2012 Advances in Water Pipeline Condition Assessment Presenter: Paul Schumi ISAWWA Engineering Power Hour O Agenda Introductions Asset Management Investigator™ LDS1000™ Deliverables Potential Applications
24

Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Jul 16, 2018

Download

Documents

vukien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

1

February 17, 2012

Advances in Water Pipeline Condition Assessment

Presenter: Paul Schumi

ISAWWAEngineering Power Hour

O

Agenda

Introductions

Asset Management

Investigator™

LDS1000™

Deliverables

Potential Applications

Page 2: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

2

O

� Wachs Companies since: 1883

� Wachs Water Services – Since 1999

� Professional Services Firm

� 200 Strong Work Force

� 80% Local Operations

� 750,000 Assets Served

� Distribution System Services

O

� The U.S. EPA Says:

� “There are 240,000 water main breaks per year in the U.S.”

� “The number of main breaks increases substantially near the end of the system’s service life”

Industry Challenges

Page 3: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

3

OO

Pipes do not deteriorate at a constant rate

1

2

3

4

5

10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Percent Effective Life Elapsed

PIPE DETERIORATION CURVE

Excellent

Good

Fair

Bad

Worst

Pip

e C

on

dit

ion

OO

AssetManagementAssetManagement

Monitor and maintain assets that

are of value to an organization.

Page 4: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

4

O

Asset Management Basics(WRF Model)

InventoryAssets

AssessCondition

DetermineResidual

Life

DetermineRRR $

& Timing

Set TargetLOS

AssignBRE Rating(Criticality)

DetermineAppropriateMaintenance

DetermineAppropriate

CIP

FundYour Strategy

Build the AMP

AssessCondition

O

Asset Management Basics(WRF Model)

InventoryAssets

AssessCondition

DetermineResidual

Life

DetermineRRR $

& Timing

Set TargetLOS

AssignBRE Rating(Criticality)

DetermineAppropriateMaintenance

DetermineAppropriate

CIP

FundYour Strategy

Build the AMP

AssessCondition

Page 5: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

5

O

Condition Assessment: Operability

� 40% of all water valves are inoperable

� 12% of all hydrants are inoperable; including inadequate flow

� 11% of all valves are buried or paved over

� 9% of all distribution valves are found in the wrong position; shut and open

� Transmission valves found shut…

Our Experience Tells Us

OO

Page 6: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

6

O

Leak DetectionExternal Technology

Analog and Digital Survey

� Ground Microphones

� Loggers

� Correlators

O

The Results

Page 7: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

7

O

Inspection Companies

� Technologies have come a long way in last 10 years

� Previously, age and break history were only guide to where there were issues

� Destructive Testing only option

� Coupons, sampling, emergency repairs.

� Gravity Sewer Lines well developed (CCTV).

� Pressurized lines - technologies available , but

generally disruptive, unreliable or expensive.

O

The Opportunity

� Utilities are demanding inspections with minimum disruption� Live insertion

� Utilities are demanding cost effective inspections� It needs to be financially viable to inspect and repair vs

replace► 10% of replacement cost

► Large diameter mains are expensive to inspect

► What $ per ft price is worth paying for small diameter lines

� Utilities are demanding low risk inspections� No lost systems

� No stuck systems

Page 8: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

8

OO

Investigator™LDS-1000™Investigator™LDS-1000™

O

Technical SpecificationsInvestigator LDS-1000

Pipe Material Any

Pipe Diameter Range 3” – 12” 16” and Larger

Insertion Requirement Fire Hydrant 2 “ Tap or Fitting

Leak Detection 0.5 gallons/hour

Minimum Flow Velocity 0 fps 1 fps

Direction of Travel Bi-Directional With the Flow

Inspection Distance Up to 300 ft Up to 3,000 ft

Degree of Bends 270o Depends on Flow

On-Board Sensors CCTV and Hydrophone + Sonde

Page 9: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

9

O

Specialized Tools

Investigator™• Non-Invasive Technology

• CCTV Video, Acoustic, w/Sonde

• Highly Accurate

O

Investigator™ Technology

� Designed for distribution mains (3” – 12” in diameter)

� Non destructive inspection

� No disruption to service

� Single pass acoustic, CCTV video and sonde mapping

� In-line system increases accuracy

Page 10: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

10

O

The Investigator

� Capable of traveling 100m

in each direction (with or without flow)

� Offers simultaneous leak and video inspection

� Needs a 1” access

� Enters system via: air valves, hydrants and pressure tappings

O

Advantages

� Operator is in control at all times

� Tethered inspection

� Operator has “eyes and ears”

� Ability to stop to look at features

� Less expensive than similar systems

� Every hydrant is an access point

Page 11: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

11

O

Accessing Hydrants

O

Houston, TX

Page 12: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

12

O

O

LDS-1000™

Condition Assessment of Large Diameter Transmission Mains

Page 13: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

13

O

LDS-1000™ Technology

� Designed for transmission mains

� No disruption to service

� Less expensive

� Single pass acoustic, CCTV video and

sonde mapping/tracking

� In-line system increases accuracy

� Global projects completed in Canada,

UK, Philippines and Australia

O

The LDS-1000

� Video and leak sensor (38.6mm)

� Needs 2” tap for insertion

� Wide angle optic, fix focus

� 16” and larger Transmission mains

Page 14: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

14

O

LDS-1000™ Key Components

• Cable & drum

• Disinfection system

• Motorized feed/retrieval

• Advanced sensor head

Operator control case with

acoustic/CCTV video/sonde

tracking software

Insertion tube

O

LDS-1000™ Access to Pipelines

� 2 inch (ID) tap

� Air valves

� Service fittings

� Pressure taps

Page 15: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

15

O

Protecting Water Quality

Chlorine feed system Disinfection contact chamber

O

Transmission Lines (1200mm pic)

� Superior camera technology

� Travels through valves, bends

� Travels in Low or No Flow

� Capable of 1km per

insertion

Page 16: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

16

O

Transmission Lines (600 mm pic)

� Enters System via: � Air Valves

� Gate Valves

� Sahara Chamber

� Pressure Tappings

� Ability to Map

Pipeline

OO

DeliverablesDeliverables

Page 17: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

17

O

Simultaneous Video and Acoustic

Clear PeakOver Leak Site

O

Page 18: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

18

O

Actual Inspections

O

Condition Assessment Information

� Full data report on inspection process, location and findings

� Tuberculation accumulation grading

� Video and audio provided on CD/DVD

Page 19: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

19

O

GIS Integration

� Clickable GIS pipeline

attributes

� GPS coordinates of

insertion points

� Electronic and acoustic

MPEG links

� Confirmation of

distance inspected from

location points

OO

Potential ApplicationsPotential Applications

Page 20: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

20

O

Condition Assessment

Investigator can identify:� Closed valves

� Undocumented valves

� Illegal service connections

� Undocumented fittings

� Pipeline material

� Improperly installed liner

� Faulty repairs

� Unknown diameter changes

� Pipe corrosion

� Pipe blockages & flow restrictions

� Damaged pipe joints

� Tuberculation levels

� Damages service connections

� Leaks

� Damaged pipe walls

� Air pockets

� Screw plugs

� Hardwood dowel repairs

� Operability of valves

� Debris accumulation

What else do you want to KNOW about?

O

In-Line Asset Locating

Closed gate valve Identification and location (GPS) of undocumented valve

Page 21: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

21

O

Tuberculation and Flow Restrictions

Early stage of tuberculation build-up at pipe joints and lips

Early stage of tuberculation build-up at pipe joints

O

Tuberculation and Flow Restrictions

Severe flow restrictions due to late stages of tuberculation build up. Leads to pressure loss.

Page 22: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

22

O

Joint Inspection

Corrosion at cast iron pipe joint Clean joint verification

O

Liner Inspection

Post liner quality inspection and verification.

Page 23: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

23

O

Validating Leaks with Investigator™

Tap located and confirmed not to be a leak Change of material confirmed not to be aleak as identified by correlation

O

Distribution System Confidence to Make the Right Investments

� Eliminates needs for excavations

� Eliminates replacement/lining of pipes that are

still in good condition

� Allows for comparison of pipeline degradation

over time

� Provides understanding of actual pipe

condition

� Maximize aging infrastructure investments

Page 24: Advances in Water Pipeline Condition Assessment · Residual Life Determine RRR $ & Timing Set Target LOS Assign BRE Rating (Criticality) Determine Appropriate Maintenance Determine

Template.ppt 2/17/2012

24

O

Investigator™ and LDS1000™ Conclusion

� Simplified condition assessment approach

� Proven technology with over 7,000 insertions

� Increased efficiencies through advanced sensor head –acoustic/video/sonde tracking

� Accurate and tangible information with each inspection

� Confidence in infrastructure renewal strategies

� Pressurized pipeline inspection - Seeing is believing!

OO

Questions?Questions?

Paul [email protected]

(630) 485-9870

Thanks!