Advanced Well Construction Techniques Utilizing Solid Expandable Technologies (SET®) Extreme Stents for Oil & Gas wells Pumps & Pipes 1 12 Nov 2007 Mark Holland NA Sales Mgr
17

Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Jan 13, 2015

Download

Technology

tmhsweb

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Advanced Well Construction Techniques Utilizing Solid Expandable Technologies (SET®)

Extreme Stents for Oil & Gas wells

Pumps & Pipes 1 12 Nov 2007

Mark HollandNA Sales Mgr

Page 2: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Overview

• Intro • Expandable casing statistics• Case Histories• What’s new

Page 3: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

On January 10, 1901 the famous Lucas Gusher blew in. Oil sprayed over 100 feet above the derrick for nine days until the well was capped.

Page 4: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Conventional Well Design

Several to many casing strings in a “tapered”

configuration

Each one decreases “diametric efficiency” by

~20%

Page 5: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

What and Where is Solid Expandable Technology? (SET®)

Page 6: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Operating Envelope for Expandable Casing

Inclination: 100o from vertical

Temperature: 400o F

Mud Weight: 19.8# / gallon

Depth: 28,750 ft

Hydrostatic: 23,300 psi

Length: 6, 867 ft

Page 7: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Cumulative Installation Footage

As of November 10, 2007798 Installations

100,000

200,000

300,000

400,000

500,000

600,000

700,000

No

v-9

9

Ma

r-0

0

Au

g-0

0

Ja

n-0

1

Ju

n-0

1

No

v-0

1

Ap

r-0

2

Se

p-0

2

Fe

b-0

3

Ju

l-0

3

De

c-0

3

Ma

y-0

4

Oc

t-0

4

Ma

r-0

5

Au

g-0

5

De

c-0

5

Ma

y-0

6

Oc

t-0

6

Ma

r-0

7

Len

gth

(in

fee

t) 238,535 m775,120 ft

Page 8: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

775,000 ft equals …

Traveling from Houston to Goliad

Page 9: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Opportunity vs. Need

9-5/8"

7-5/8"

Decision Point

Hole Size Preservation

Hole Size Survival

Opportunity

Need

Page 10: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Economics

Reduced drilling time from 140 to 48 days

Opportunity (planned)

Need (contingency)

Planned Expandable Key OffsetsM

easu

red

De

pth

3000

7000

11000

15000

19000

23000

27000

TechLimit

Page 11: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Case Histories

HPHT Well – Deep Shelf GOM

UD High Pressure – DW GOM

Page 12: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

HP/HT Well in GOM – 20’ Water Depth

Trouble ZoneMajor pressure regression - Losses

SolutionInstalled 9-5/8" x 11-3/4" expandable

ValueDrilled and evaluated virgin formation with sufficient hole size

Page 13: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

High Pressure Well in GOM – 3400’ Water Depth

Trouble Zone Low Margin Drilling in a

DW GOM wellSolution

Installed 7-5/8” x 9-3/8”Preserve hole size to TD

ValueDrilled and evaluated new formations in a frontier environment

Page 14: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

MonoDiameter™ and What is it?

The industry demands it: More challenging drilling environments Current available technology is limited Improved ROI Advanced well construction

Page 15: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

MonoDiameter™ Defined

Provide successive uniform ID over multiple liners

MonoDiameter™10.4" ID

Page 16: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Successful Field Appraisal Well

Enventure was operator Safely completed drilling

program Followed standard

operating procedures Well information

Drilled in Oklahoma Real-life well Completed April 2007

Successful installation First of its kind Continuation possible

DNV Certification

Page 17: Advanced Well Construction Techniques Utilizing Solid Expandable Technologies: Extreme Stents for Oil & Gass Wells, pumpsandpipesmdhc

Conclusions – What does this mean to us all?

ERD applications “One size fits all” Reduces the Carbon

Footprint of Drilling Ops Drill a more efficient well

Less cuttings, mud, cement, steel, rig size, etc