Top Banner
ADVANCED QUALIFICATION PROGRAM (AQP) LATAM AIRLINES GROUP 1 Humberto Lira Cap. B-767 AQP Manager Latam Airlines Group
104

ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Aug 30, 2018

Download

Documents

hadiep
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

ADVANCED QUALIFICATION

PROGRAM (AQP)

LATAM AIRLINES GROUP

1

Humberto Lira Cap. B-767 AQP

Manager Latam Airlines Group

Page 2: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

AGENDA

1.- Fases Programa AQP (Historia, Filosofía y Desarrollo)

2.- Desarrollo Currículos AQP

3.- Integración TEM-CRM en AQP

4.- Transición programa tradicional a AQP

5.- Estatus AQP LATAM AIRLINES GROUP

6.- Lecciones aprendidas en AQP punto de vista del explotador

7.- Conclusiones / Mejoras en la seguridad operaciónal implementación AQP

2

Page 3: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Fases Programa AQP

Historia

Filosofía

Desarrollo

3

Page 4: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

ACCIDENTS BY PRIMARY CAUSE WORLDWIDE COMMERCIAL JET -

HULL LOSS 1993-2002

4

Page 5: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

1987: FAA conforma un grupo de trabajo (Task Force).

Formado por Compañías, NASA, NTSB, sindicatos de pilotos.

Objetivo: Reducir al mínimo el error de piloto.

1988: Recomendaciones.

Base regulatoria para programas avanzados.

Instrucción/entrenamiento y evaluación.

Considera factores técnicos ,CRM y LOS.

1990: SFAR 58 - Programa de Cualificación Avanzado.

2014: 24 años de programas AQP

INICIOS DE AQP

5

Page 6: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

QUE ES AQP ?

Método voluntario

Alternativo para la cualificación, entrenamiento, y

certificación de:

Pilotos, instructores evaluadores

Personal de cabina, despachadores

Otro personal de operaciones

Entrenados o cualificados bajo el FAR 121 y 135

6

Page 7: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Incrementar la seguridad de las

operaciones aéreas.

Optimizar la instrucción, el entrenamiento

y la evaluación de las tripulaciones.

Igualar o exceder la efectividad del

programa tradicional

Responder a los cambios, tecnológicos,

operacionales, instruccionales

Objetivos

7

Page 8: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Cómo se logran:

Acondicionando los currículos a las operaciones de la

compañía. («Fly like you train, and train like you fly»)

Integrando el manejo de recursos de tripulación (CRM) y la

habilidad técnica (HT) en todos los currículos.

Capacitando y calibrando a los Instructores/Evaluadores.

Evaluando a las tripulaciones en situaciones simuladas

realistas y equivalentes (LOE´s), tanto en su HT como en

CRM.

Monitoreando la eficacia, identificando los cambios y

modificando los currículos de acuerdo al análisis de datos

(Performance Proficiency Data Base – PPDB)

AQP – Objetivos

8

Page 9: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CARACTERISTICAS AQP

AQP Se adapta a la cultura de la aerolinea

AQP responde al incremento de la carga de

trabajo cognitiva asociado con los aviones

modernos

AQP se adapta a cualquier tipo de avion antiguos

o de última generación

9

Page 10: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Conceptos AQP

Estandares de Cualificación se convierte en la nueva

base regulatoria (Qualification Standards)

Tareas no criticas se entrenan y evaluan con menos

frecuencia.

Las Tareas “Vigentes” se evaluan en la Linea de

vuelo

Instrucción y entrenamiento de los I/E es mejorada y

calibrada en cada periodo de evalución (Instructor

pilot continuing qualification (IPCQ)) 10

Page 11: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Quienes se deben entrenar en AQP

Capitanes y Primeros Oficiales

Instructores de vuelo y Simulador

Evaluadores designados

Inspectores de operaciones Aereas

(DGAC- ANAC) ...

11

Page 12: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Requerimientos AQP

Integracion CRM en curriculos Inducción; Cualificación;

Cualificación ( “Indoc”. “Qual” “CQ”)

Entrenamiento/Evaluacion FFHH en Operaciones

simuladas de Linea (LOS)

LOFT( Line operational evaluation)

SPOT (Special purpose operational training)

LOE ( Line operational evaluation)

12

Page 13: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Requerimientos AQP

Mejora continua entrenamiento I/Evaluadores (IPT-IPCQ)

Es mandatorio el uso de Line Oriented Evaluation ( LOE)

La colección de los datos de validaciones /evaluaciones

es obligatorio

El trabajo de desarrollo debe ser en coordinación

permanente con la A.A.

Se requiere un programa de seguimiento especial”Special

Tracking “

13

Page 14: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

AQP Challenges

Resistencia al cambio

Evaluación de habilidades CRM con el

mismo nivel de confiabilidad que las

habilidades técnicas ( Pilot Skills)

Programa de adquisición y análisis de datos

( Habilidades Técnicas /CRM )

Asignación y mantención de recursos

Desafíos AQP

14

Page 15: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Soluciones

Capacitación/Inducción programa AQP.

Desarrollo de herramientas para calibrar I/Evaluadores

( Ejercicios –Videos)

Complementar la calificacion “Pass/Fail” con una

escala de calificacion 1-4

Desarrollo de codigos de no competencia (“Reason

Code” Methodology) , para calificación 1(Data analysis)

Diseño metodologia para desarrollo de LOE´S basados

en “Even Set” (RRLOE- LA/LOE Designer)

Compromiso alta dirección y gerencias ops. con AQP

15

Page 16: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

EEUU (FAA)

Special Federal Aviation Regulation (SFAR 58 en su inicio

hasta Dic.2005)

Advisory Circular AC 120-54A FAA

Air Carrier Inspectors Handbook (FAA 8900.1,Vol.3,Ch. 21)

Far 121 Subpart “Y” – Advanced Qualification Program (01 Enero 2006)

Canada: Canadian Aviation Regulations (CARs)

Chile

DGAC DAN 121:

Capítulo “L” Programa de Cualificación Avanzada

Apéndice 7

Ecuador

RDAC Parte 121, Capítulo “T” Programa de cualificación avanzada (aqp)

CIRCULAR DE ASESORAMIENTO No. 121-114-2014

AQP – Normativa

16

Page 17: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Currículos requeridos:

Adoctrinamiento (Inducción) (INDO)

Cualificación (Q)

Inicial

Transición

Ascenso

Cualificación Contínua (CQ)

Recurrente

Recualificación

17

AQP – Normativa

Page 18: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Crew Resource Management (CRM)

• Training on and evaluation of skills and proficiency of each

person being trained under an AQP to use their CRM skills

and their technical skills in an actual simulated scenario. (AC

120-54A)

• The applicant shows competence in required technical

knowledge and skills (e.g., piloting or other) and crew

resource management (e.g., CRM or DRM)

• Line Operational Evaluation (LOE) means a simulated line

environment, the scenario content of which is designed to

test integrating technical and CRM skills. (QS)

AQP – Normativa

18

Page 19: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FAR 121Subpart Y Advanced Qualification Program

The intent of an LOE is to evaluate and

verify that an individual’s job knowledge,

technical skills, and CRM skills are

commensurate with AQP qualification

standards. The evaluation assesses both

technical and CRM skills.

19

Page 20: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Simuladores de Vuelo (SIM) y Flight Trainig Devices

(FTD):

Todo SIM y FTD usado en un Programa AQP, debe ser

evaluado por la Autoridad Aeronautica (AA)

Toda dependencia o elemento usado en un Programa AQP,

debe ser aprobado por la AA.

Cada dispositivo de instrucción aprobado para ser utilizado

en un AQP, debe ser parte de un programa continuo que

permita mantener su operatividad y funcionalidad para

realizar su función prevista de acuerdo a lo aprobado por la

AA.

20

AQP – Normativa

Page 21: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Colección de Data:

Establecer procedimientos que aseguren que la

Compañía entrega información suficiente, que

permite a la autoridad determinar si los

entrenamientos y las evaluaciones se están

efectuando para cumplir los objetivos del

currículum.

21

AQP – Normativa

Page 22: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Facetas del programa AQP

Normativa Metodologia

Sistema

Iniciativa de Seguridad

Cultura

Programa Voluntario de Instrucción/ Entrenamiento

22

Page 23: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

¿Preguntas?

23

Page 24: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

International Models of AQP

Australia: Implemented key elements of AQP and integrated them into a larger change management strategy, based on ability to maintain identified data on pilots

Bahrain: Adopted AQP as is.

Canada: Adapted AQP, but with reductions to the

data reporting requirements

New Zealand: Adopted Far 121 Subpart Y AQP

Chile : Adopted a Far 121 Subpart Y

AQP ( AS IS ) 24

Page 25: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

DESARROLLO CURRICULO

AQP

25

Page 26: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Fases del Programa AQP (I)

Phase I

Application

Phase II

Curriculum Development

Phase III

Curriculum

Implementation

Training System

Phase IV

Initial Operation

Phase V

Continuing Operation

Application

26

AQP Manager

Team AQP

Page 27: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

2

7

AQP TEAM LAN CARGO GROUP

Page 28: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Req. Operacionales/Entrenamiento AQP

FLT

OPS

REQ.

Manufacturers

Documents

FAA

Documents

Airline

Documents

NTSB/FOQA/

LOSA

Reports

Pilot Expertise

I/E

Flt Pubs

WHAT

HOW WHEN WHERE

1.- APLICATION

2. - TASK ANALYSIS

3. - QUALIFICATION STD.

4.- CURRICULUM

5. – ISD (Q-CQ-LOE)

6. - IMPL. /OPS. PLAN

7.- ANUAL REPORT

Training Ops Documentation

SV-APT/LOFT-MV-LOE –SPOT-LC

Validation/ Evaluation

28

Page 29: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Documentación AQP

DOCUMENTOS DE ADMINISTRACIÓN (Independiente)

Carta Aplicación

Sistema de diseño Instruccional (ISD)

Plan de Implementación y Ops. (I/O PLAN)

DOCUMENTOS DE LA BASE DE DATOS

Análisis de tareas (Task analysis)

Estándares de cualificación (Qualification Standars)

Currículo de Piloto / Currículo Inst./ Eval.

REPORTE ANUAL

Mantención del Programa AQP (Retroalimentación/Análisis)

Actualización equipos de entrenamiento

Cambios al currículo

29

Page 30: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

TASK ANALYSIS TA (Analisis de tareas)

-Es un proceso de análisis en el cual se desagrega un

trabajo a sus componentes básicos (tareas, subtareas

,elementos y sub-elementos que deben ser ejecutados).

-Se asocian las destrezas y conocimientos necesarios

para ejecutar esa tarea. (K,C,M,A)

Listado de tareas (Task Analysis TA)

30

Page 31: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Event Set #1 Event Set #7Event Set #2 Event Set #8

Event Set #6

Event Set #3

Event Set #5

Event Set #4

IQC0030C

FASES DE UN VUELO ( JOB)

• 1. Ground

• 2. Takeoff

• 3. Climb

• 4. Cruise

• 5. Descent

• 6. Approach

• 7. Landing

• 8. Taxi and Park

• 9. Supplementary procedures(non-phase specific)

• 10. CRM (non-phase specific)

31

Page 32: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Qual. Standards (QS)

Condiciones: 1.-Anormales

-Autothrottle disconnect

-Warning, caution and

advisory messages

2.-Configuración del Avión

-Flaps 5

-Flaps 15

-TO thrust

3.-Ambiente Natural

-Runway contaminated

-LVP

-Crosswind minimum 10

maximum 15

3.-Ambiente Operacional

-Reduced runway length

-Balanced length runway

-Close in Turn

-Noise Abatement Takeoff

4.-Procedure

-Improved climb

-Alternate CG 1 and 2

-Packs off takeoff

Estándares: 1.-Procedimientos

-In accordance with LAN FCOM, QRH, FCTM,

SOP´S

-Lan Operational Manual (MO)V) and MOE

2.- Maniobras

Maintains directional control on runway

throughout takeoff roll After liftoff, maintains

heading within ±10 degrees and after rolling

tendencies are controlled, establish a

positive climb and maintain airspeed within ±5

knots of the target airspeed, but not less than V2.

Maintains bank angle within prescribed parameters

appropriate to flight pattern

3.-Referencias

LAN FCOM, QRH, FCTM , SOP’s

LAN Flight Operations Manual (MOV), MOE and MOE

Ejemplo: Word-1

32

Page 33: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Task List / Task Analysis

• Generar un listado de tareas por cada fase

de vuelo

Ejemplo:

• 1 = Fase de Vuelo

• 1.1 = Tarea

• 1.1.1 = Sub- tarea

• 1.1.1.1 = Elementos (K, C, M, A)

33

Page 34: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Listado de Tareas / TA Hab. Tec.

2.0 Takeoff ( FASE DE VUELO )

2.1 Perform Pre-Takeoff Preparations (TAREA)

2.1.1 Perform Takeoff Preparation (Sub-tarea)

2.1.2 Perform Aircraft Systems Monitoring (Sub-tarea)

2.1.3 Assess Environmental Conditions (Sub-tarea)

2.2 Perform Takeoff (TAREA )

2.2.1 Perform Normal Takeoff (Sub-tarea)

2.2.1.1 [K, C] Monitor EICAS and engine indications and verify that the correct thrust is set

2.2.1.2 [K, M] Make the required callouts during takeoff.

2.2.1.3 K, C] Scan engine instruments to ensure proper performance

2.2.1.4[K, C] Recognize and announce the appropriate airspeeds as required

2.2.2 Perform Crosswind Takeoff (Sub-tarea)

2.2.3 Perform Reduced Visibility Takeoff (Sub-tarea) 34

Page 35: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

QUAL. STANDARDS QS (Estándares de Cualificación)

-Las condiciones bajo la cual la tarea es ejecutada

- Los parámetros o estándares definidos para la tarea

- Adicionalmente el QS “Reemplaza” la normativa FAR-ANAC-DGAC

por lo que es uno de los documentos mas importantes

Qual. Standards QS

35

Page 36: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Qualification Standards QS

Qualification standards son objetivos de competencia

asociados a una estrategia de evaluación

TPO (Objetivo de competencia terminal)

Es una tarea a la que se le ha aplicado:

.. Desempeño requerido/comportamiento

.. Condiciones

… Normales

… Anormales (Weather, operacionales)

.. Parámetros de desempeño (Tolerancias)

Critical / Currency (Critico / Vigente;uso frecuente)

SPO (Objetivo de competencia de soporte)

Es igual a un TPO asociado a una sub tarea

36

Page 37: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CRITICALIDAD/VIGENCIA

Crítico: Identifica un TPO/SPO en el cual, al ejecutar la maniobra con

resultado bajo estándar podría afectar adversamente la seguridad del

vuelo. Para ello se consideran la dificultad de la maniobra y la

consecuencia de un error en su desarrollo. Los TPO/SPO críticos deben ser

cumplidos más frecuentemente que los no críticos. Las opciones de

identificación son: “Sí” ó “No”.

Vigente: Identifica si el Piloto mantiene su competencia en el TPO/SPO a

través de su repetición durante las operaciones normales de línea. Las

opciones de identificación son: “Sí” ó “No”.

Tabla de Categorías de Maniobras Críticas/Vigentes de Currículo CQ.

La Categoría (1, 2, 3 ó 4) se aplica a cada maniobra o procedimiento, y se

refiere a la obligación de entrenar, validar, evaluar o muestrear esa

determinada maniobra o procedimiento dentro del período que se indica en

la columna TPO/SPO, de acuerdo a la combinación critico/vigente

37

Page 38: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CRITICALIDAD / VIGENCIA

Crítico Vigente Categoría TPO/SPO

Sí No 1 Entrenar, validar o evaluar en cada

Período Evaluación (12

Meses)

No No 2 Entrenar, validar o evaluar en cada

ciclo de CQ (24 Meses)

Sí Sí 3 Muestrear en primera mirada/MV/LOE

y/o LC en cada Periodo

Evaluación ( 12 meses)

No Sí 4 Muestrear en primera mirada/MV/LOE

y/o LC en c/ciclo CQ (24

Meses)

38

Page 39: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Qual. Standards (QS)

• TPO 2.1: Ejecutar Takeoff Procedure

• Avión: B-767

• Fase de vuelo: 2 Takeoff

• Tarea: 2.1: Ejecutar Takeoff Procedure

• Crew Position : PF, PNF

CA, FO

CA, CA

FO, FO (Simulator only-Q)

Critico: Yes

Vigente: Yes

• Desempeño Esperado:

The trainee will demonstrate the ability to perform a takeoff by:

- performing the Takeoff Procedure;

- maneuvering the aircraft to climb speed; and

- configuring the aircraft after select climb power for clean

configuration

Ejemplo: Word-1

.

39

Page 40: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

AQP

25 Abril 2012

INTEGRACION CRM

Currículos:

Inducción: Teoría Clases

Cualificación: Aplicación LOFT

Cualificación Continua: Clases,

Aplicación: SPOT;LOFT y LOE

Page 41: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

SEGUNDA MIRADA

41

Page 42: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

2° Mirada AQP

Detrás de cada problema técnico

está, casi siempre, presente un

factor humano contribuyente.

La importancia de descubrir los

factores humanos que contribuyen al

problema radica en que puede ser la

causa de éste. 42

Page 43: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FFHH (Comportamientos TEM- CRM QS)

Cap. 10 FFHH

1.- TEM ( Threat and Error management)

2.- Proceso de comunicación

3.- Liderazgo, Trabajo En Equipo y

Administración De La Carga De Trabajo.

4.- Conciencia situacional

5.- Planificación y Toma de Decisiones

6.- Automatización y Tecnología

7.- Autoevaluacíón

43

Page 44: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

LISTADO DE TAREAS FFHH

• FASE 10 MANEJO DE RECURSOS DE TRIPULACIÓN. ( FASE TRANVERSAL)

10.1 Desempeñarse como miembro de la tripulación en el proceso de la Administración de la

amenaza y el error (TEM). (TAREA)

10.1.1 Detectar y manejar la amenaza. (Sub-tarea)

- Reconoce la(s) amenaza(s) externa(s) antes de iniciar la maniobra

- Reconoce la(s) amenaza(s) interna(s) de la organización antes de iniciar la maniobra

- Reconoce el(los) error(es) externo(s)

- Reconoce la(s) amenaza(s) esperada(s) o conocida(s) antes de iniciar la maniobra

10.1.2 Detectar y manejar el error. (Sub-tarea)

- Aplica la(s) contramedida(s) adecuada(s) y oportuna(s) para corregir el/los error(es)

- Reconoce el/los error(es) de no cumplimiento intencional

- Reconoce el/los error(es) de procedimientos

- Reconoce el/los error(es) de operación

10.1.3 Detectar y manejar el estado no deseado. (Sub-tarea)

- Aplica la contramedida adecuada en forma inmediata

- Reconoce y define un estado no deseado

44

Page 45: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Qual. Standards (QS)

TPO 10.1 Desempeñarse como miembro de la tripulación en el proceso de la

Administración de la amenaza y el error (TEM)

Avión: B767

Fase de vuelo: 10 Manejo de Recursos de Tripulación- Factores Humanos

Tarea: 10.1 Desempeñarse como miembro de la tripulación en el proceso de la

Administración de la amenaza y el error (TEM)

Función, Tripulación: PF-PM, CP-FO, CP-CP, FO-FO

Crítico: Si

Vigente: Si

El piloto alcanzará la capacidad de desempeñarse como miembro de la tripulación en el

proceso de Administración de la amenaza y el error mediante:

- Detectar y manejar la amenaza

- Detectar y manejar el error

- Detectar y manejar el estado no deseado (E.N.D.)

45

Page 46: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

• Condiciones:

- Este comportamiento está presente en todos los momentos del vuelo

• Estándares:

- Todos los miembros de la tripulación deben demostrar la habilidad de integrar

todos los conceptos de TEM-CRM en un plan de acción cohesionado para un

exitoso manejo del error, que resulten en un mejoramiento de las capacidades

y reduzcan los riesgos en las situaciones no planificadas.

- Los comportamientos observables mínimos, para considerar un buen

desempeño en FFHH en cada maniobra, serán establecidos en el Job Aid.

Los conductas observables mínimas a cumplir serán definidas por el Team AQP

de acuerdo a la fase de vuelo ,diparador, distractores ,etc.

• Referencias:

- Manual de Operaciones LAN (MO)

- LAN FCOM, FCTM, SOPs.

- Manual TEM-CRM Latam.

46

Qual. Standards (QS)

Page 47: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Qual. Standards (QS)

47

• SPO 10.1.1: Detectar y manejar la amenaza

• Avión: B767

• Fase de vuelo: 10 Manejo de Recursos de Tripulación- Factores Humanos

• Tarea: 10.1 Desempeñarse como miembro de la tripulación en el proceso de

la Administración de la amenaza y el error (TEM).

• Sub-tarea: 10.1.1 Detectar y manejar la amenaza

• Función, Tripulación: PF-PM, CP-FO, CP-CP, FO-FO

• Conductas observables:

Page 48: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Qual. Standards (QS)

48

• Conductas observables:

- Contramedida de revisión

- Reconoce la(s) amenaza(s) externa(s) antes de iniciar la maniobra (TEM)

- Reconoce la(s) amenaza(s) interna(s) de la organización antes de iniciar la

maniobra (TEM)

- Reconoce el(los) error(es) externo(s) (TEM)

- Reconoce la(s) amenaza(s) latente(s) (TEM)

• Condiciones:

- Refiérase al TPO 10.1

• Estándares:

- Refiérase al TPO 10.1

Page 49: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

49

Como Evaluamos FFHH ( NOTECHS)

Conciencia

Situacional TEM

Toma de

Decisiones

Comportamientos TEM-CRM

Detec. Amenaza

Detec. END

Liderazgo, Tr. Equipo

y Adm. C.Tr.

Detec. Error

• Reconoce oportunamente la situación de E.N.D

• Muestra una conducta activa para detectar y corregir el E.N.D

• Describe correctamente el E.N.D

• Establece estrategias claras para no repetir el E.N.D.

• Aplica la contramedida en forma inmediata para salir del E.N.D

Category (TPO)

Element (SPO)

Behaviour (OB)

Page 50: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Calificación SPO FFHH

50

0

1

2

3

4

Page 51: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Calificación TPO FFHH

51

0

1

2

3

4

Page 52: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CURRICULO

Cualificación Continua

(Continuing Qualification)

“CQ”

Transición programa tradicional a AQP

Page 53: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Continuing Qualification Cycle

53

Page 54: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Pilot CQ Foot Print LAN

08:00 hrs 08: 00 hrs

Simulador LOE Briefing: CRM/Dispatch Line Operational Evaluation SPOT Debriefing

Simulador MV Briefing First Look Maneuver Validation Debriefing

Day 5

FTD-SIM APT / LOFT

(Aircraft Procedures Training) (Line Oriented Flight training)

Line Check

Day 6 Day 7 Day 8

08: 00 hrs

08:00 hrs 08: 00 hrs

Temas de Flota Sistemas del avión Temas Generales - Tiempo adverso

- Seguridad operac.

- (WEB)

- SV

Day 1

Temas de Flota Sistemas del avión SV (WEB)

Day 2 Day 3 Day 4

08:00hrs

Temas de Flota

Performance del avión

Temas Generales - Entr. de Seguridad - Esp. Operativas -Op. Baja Visibilidad. - WEB SV

Entrenamiento de Emergencia Entrenamiento anual de emergencias

08: 00 hrs

- Entr. CRM

54

Page 55: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Required Pilot Skills

Technical Skills

Procedural Knowledge

Systems Knowledge

Psychomotor Skill

Cognitive Skill

Comply With Checklists

Comply With Procedures

CRM Skills

Decision Making Planning

Situational Awareness Leadership

Workload Management Critical Thinking

Communication Error Mitigation

Team Building (TEM)

Automation

Airmanship

How do we assess these skills?

55

Page 56: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

VALIDACION DE SISTEMAS

• Proposito: Asegurar que el

piloto tiene un conocimiento

acepatable de los sistemas

del avión y aquellas materias

de competencia profesional.

• Se requiere un 80% en cada

sistema o materia para

obtener una calificación

“Complete”

56

Page 57: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Entren./Validación de Procedimientos (APT) • Proposito: Practicar,

entrenar y validar

procedimientos y

politicas de la compañia

( Sop, Mel, Despacho,

Wheather, Sistemas

Avion)

• Debe ser completado

para continuar con MV

• Se registra los datos en

PPDB

• Uso de “ JOB AID”

(Word-3 Apt)

Page 58: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CQ: Maneuver Validation

• Validación, no

chequeo

• Orientado a las

maniobras

• Puede Incluir FL

Page 59: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CQ: MV Repeticiones

• Repetición: Ejecución de 2° maniobra

– Maniobra inicial no se considera repetición

• Se puede repetir tantas veces como el tiempo

del simulador lo permita

• Se puede dar instruccion en repeticiones

• No se permite comentario/instruccion en la

manibra que se validara.

• Si no completa la validacion de maniobra

“Incompleto (Word-4 MV)”

59

Page 60: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Primera Mirada (First Look FL)

• FL puede ser efectuado en MV o Spot se

registra en base de datos primer intento

• Preguntas en de-briefing

• No se permite entrenamiento

• Registro de N° de repeticiones y “Reason

Code”

• Uso de “ Job Aid” (Word-5 FL)

60

Page 61: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Administración del LOE

61

Page 62: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

CQ: SPOT

• SPOT es entrenamiento hasta lograr la

competencia

• Escenario de un segmento de vuelo

• Puede incorparar una o varias

maniobras

• Se puede recolectar data FL

• Se puede utilizar para Cat II/III ; RNAV;

NATS. 62

Page 63: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

LOE

• Es mas completo que la evaluación

tradicional

• Evalua destrezas técnicas y

competencia de factores humanos

• Duracion entre 02:00 – 02:30 Hrs.

• Se evalúa la tripulación e individual.

63

Page 64: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

LOE Insatisfactorio

• Se Pueden repetir dos “Event SET”

(25%)

• El LOE se debe completar antes de

repetir.

• No se permiten comentarios o

instrucción

• Si es insatisfactorio se requiere

rentrenamiento y un Nuevo LOE

64

Page 65: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Administración LOE

• Estar famiiarizado con el Guión

• Despacho real

• Seguir el Guión como esta diseñado

• No instruir , no comentarios

• Tomar notas , “ JOB AID”

• Usar JOB AID como ayuda en el debrief e

ingresar datos a PPDB (Word-6 Loe pdf.)

65

Page 66: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

AQP Validation and Evaluation

Validation • System, Procedure and Maneuver Validation

• An assessment of an individual’s knowledge and skill

• Some training allowed

Evaluation • Line Operational Evaluation (LOE) and Line Check

• (Qualification and Continuing Qualification)

• Crew Evaluation

• Time management

• No training allowed

66

Page 67: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Advanced Qualification Program

¿Preguntas?

67

Page 68: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

LOS: Definiion

• AC 120-35C • An environment which is structured to allow and

encourage the application of technical and CRM concepts to a situation.

• Simulator training session

• “Line environment” setting

• Real time

68

Page 69: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Definitions:Three Types of LOS

LOFT

SPOT

LOE

69

Page 70: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Line Oriented Flight Training

• Not evaluated

• Not interrupted

• No input from instructor

LOFT

70

Page 71: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Special Purpose Operational Training

• Addresses specific requirements

• Full or partial flight

• Not evaluated

• Instructor intervention allowed

SPOT

71

Page 72: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

LINE OPERATIONAL EVALUATION

• LOE is a more stringent evaluation than traditional

check

• Tests and grades technical and CRM proficiency

• A focused approach to the management and

assessment of simulator sessions

• Uses “Event Set Methodology”

• Requires a higher degree of proficiency/Obs. by the

instructor/evaluator

LOE 72

Page 73: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Stages of LOS Development

• Identify CRM objectives

• Identify possible incidents

• Specify and develop event sets

• Evaluate and modify scenario

• Implement training

and evaluation

73

Page 74: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Calibración de I/E RTIS

(Videos)

VIDEO 1 Calibración

Page 75: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

VIDEO 1 Engine Failure

1. UNSATISFACTORY

2. ACCEPTABLE

3. PROFICIENT

4. ABOVE STANDARD

5 / 5

40%

60%

0% 0%

1 2 3 4

Page 76: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

REASON CODES

1. K = Systems Knowledge

2. M = Technique

/Execution/Motor

3. P = Procedural

4. CC = Crew

Coordination/CRM

5. A = Attitude

6. O = Other

1 / 5

0% 0%

100%

0% 0% 0%

1 2 3 4 5 6

Page 77: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

VIDEO 2 RTO

1. UNSATISFACTORY

2. ACCEPTABLE

3. PROFICIENT

4. ABOVE STANDARD

5 / 5

100%

0% 0% 0%

1 2 3 4

Page 78: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

REASON CODES

1. K = Systems Knowledge

2. M = Technique

/Execution/Motor

3. P = Procedural

4. CC = Crew

Coordination/CRM

5. A = Attitude

6. O = Other

5 / 5

0% 0%

80%

20%

0% 0%

1 2 3 4 5 6

Page 79: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

AQP

25 Abril 2012

Colección/Evaluación

DATA

Page 80: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

80

APT CMDTE (105) FO (105)

100 % COMPLETE 100 % COMPLETE

Rating Promedio N° Notas 1 Rating Promedio N° Notas 1

1.- REVIEW MEL ITEM 2,8 0 2,8 0

2.- BEFORE START PROCEDURES 2,7 1 2,7 1

3.- MANUAL ENGINE START) 2,6 3 2,6 3

4.- START VALVE MANUAL OPERATION 2,6 5 2,7 4

5.- TAKE OFF 2,6 3 2,7 1

6.- TCAS EVENT 2,4 2 2,6 4

7.- CARGO SMOKE 2,2 2 2,3 3

8.- PERFORM HOLD 2,3 3 2,5 4

9.- NON PRECISION APPROACH (VOR) 2,3 3 2,4 7

10.- GO AROUND TWO ENGINES 2,4 2 2,6 7

11.- CREW INCAPACITATION 0 0 2.4 6

12.- CAT I APPROACH 0 0 3 1

13.- AUTOMATIC LANDING 0 0 2,5 0

14.- TAKE OFF 2,8 1 2,8 0

15.- TCAS EVENT 2,7 0 2,5 0

16.- PERFORM HOLD 2,7 1 2,5 1

17.- NON PRECISION APPROACH (VOR) 2,5 3 2,3 3

18.- GO AROUND TWO ENGINES 2,6 3 2,5 1

19.-DC BUS 1+2 FAULT 2,6 0 2,5 0

20.-FUEL LEAK 2,6 1 2,5 1

21.-CREW INCAPACITATION 2,7 1 0 0

22.-CAT I APPROACH 2,6 1 0 0

23.-AUTOMATIC LANDING 2,7 0 0 0

24.-THRUST CONTROL FAILURE (SPOT) 2,7 0 2,7 0

Page 81: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

81

5

6

2

1 0

1

2

3

4

5

6

7

9.- NON PRECISION APPROACH (VOR) 10.- GO AROUND TWO ENGINES

REASON CODES APT FO

P = PROCEDURAL

CC = CREW COORDINATION/CRM

M = TECHNIQUE/EXECUTION/MOTOR

4

1 0

1

2

3

4

5

6

7

4.- START VALVE MANUAL OPERATION

REASON CODES APT CMDTE

P = PROCEDURAL

CC = CREW COORDINATION/CRM

M = TECHNIQUE/EXECUTION/MOTOR

Page 82: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

82

MV

CMDTE (117) FO (117)

100 % COMPLETE 99 % COMPLETE

1 % INCOMPLETE (1)

Rating Promedio N° Notas 1 Rating Promedio N° Notas 1

1.- GPWS 2,9 2 2,7 2

2.- NON PRECISION APPROACH 2,8 2 2,7 2

3.- WIND SHEAR (FIRST LOOK) 2,6 8 2,5 3

4.- FLAPS FAULT/LOCKED 2,7 4 2,5 5

5.- ILS APPROACH 2,9 0 2,7 0

6.- DOUBLE SYSTEM FAIL (G+B) 2,4 15 2,3 9

7.- MANUAL LANDING 2,8 0 2,5 0

8.- TAKE OFF 2,6 0 2,7 2

9.- ENGINE FAILURE DURING TAKE OFF 2,4 10 2,1 22

10.- GPWS 2,7 0 2,6 5

11.- NON PRECISION APPROACH 2,7 0 2,8 0

12.- WIND SHEAR (FIRST LOOK) 2,6 0 2,5 4

13.- DOUBLE SYSTEM FAIL (G+B) 2,7 0 2,5 10

14.- MANUAL LANDING 2,6 0 2,6 2

15.- VISUAL APPROACH 2,3 0 2,2 12

16.- EMERGENCY EVACUATION 2,4 9 2,4 10 17.- SMOKE/ SMOKE/FUME AVIONICS SMOKE AND OR SMOKE FUMES REMOVAL (SPOT)

2,6 1 2,5 1

18.- RNAV /RNP AR (SPOT) 2,7 2 2,6 2

Page 83: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

83

5 4

8

1

9

5

1 1 0

2

4

6

8

10

12

14

6.- DOUBLE SYSTEM FAIL (G+B) 9.- ENGINE FAILURE DURINGTAKE OFF

16.- EMERGENCY EVACUATION

REASON CODES MV CMDTE

P = PROCEDURAL

CC = CREW COORDINATION/CRM

M = TECHNIQUE/EXECUTION/MOTOR

O = OTHER

12

2 3

9 10

8 9

1 0

2

4

6

8

10

12

14

9.- ENGINE FAILUREDURING TAKE OFF

13.- DOUBLE SYSTEMFAIL (G+B)

15.- VISUALAPPROACH

16.- EMERGENCYEVACUATION

REASON CODES MV FO

P = PROCEDURAL

CC = CREW COORDINATION/CRM

M = TECHNIQUE/EXECUTION/MOTOR

O = OTHER

Page 84: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

ANALISIS LOE 1 B767 CQ 2012

14 Muestras ( 14 LOES)

Estadística por Fase De Vuelo (8)

Ejemplo solo:

FASE 1 OPERACIÓN EN TIERRA

FASE 6 APROXIMACION

FASE 7 ATERRIZAJE

ANALISIS LOE 1 CQ 2012

Page 85: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

ANALISIS LOE 1 – RATING POR FASE DE VUELO

2,9 2,8 3

2,8 2,7 2,6 2,5 2,8

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

RATING ETAPAS DE VUELO

85

Page 86: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FASE 1 – OPERACIÓN EN TIERRA

3 3 2,9

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

SPO 1.1.1: Analizar el plande vuelo y documentación

relacionada

SPO 1.1.3: Ejecutar lastareas requeridas enrelación a mercancías

peligrosas

SPO 1.3.1: Ejecutarprocedimiento Before taxi

Rating SPOs – FASE 1 Operación en tierra

3 3

2,8 2,8

3

2,8

2,7

2,75

2,8

2,85

2,9

2,95

3

3,05

SPO 10.2.1 Efectuar elbriefing (COM)

SPO 10.2.3 Transmitiradecuadamente lasdecisiones (COM)

SPO 10.5.1 Obtener yanalizar la información

(PTD)

SPO 10.5.2 Establecerprioridades y prever

resultados (PTD)

SPO 10.5.3 Establecercursos de acción (PTD)

SPO 10.1.2: Detectar ymanejar el error (TEM)

SPOs Factores Humanos - Fase 1 Operacion en tierra

86

Page 87: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FASE 1 – OPERACIÓN EN TIERRA

3 2,9 2,8

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

COM = Comunicación PTD = Planificación y toma

de decisiones

TEM = Administracion de la

amenaza y el error

Rating Promedio TPO Factores Humanos - Fase 1 Operación en Tierra

87

Page 88: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FASE 6 - APROXIMACION

2,6

0

0,5

1

1,5

2

2,5

3

3,5

4

SPO 6.1.4: Ejecutar una aproximaciónNO-ILS

Rating SPOs - Aproximación

2,8 2,8 2,8

2,1 2,1

0

0,5

1

1,5

2

2,5

3

3,5

4

SPO 10.2.2 Transmitir y/orecibir el contenido de la

información (COM)

SPO 10.3.1 Ejercerliderazgo en el puesto que

desempeña (LTC)

SPO 10.6.3 Usar el nivelapropiado de

automatización paradisminuir la carga de

trabajo (AAT)

SPO 10.6.4 Interactuarcorrectamente con los

sistemas automáticos (AAT)

SPO 10.1.2: Detectar ymanejar el error (TEM)

SPOs Factores Humanos - Fase 6 Aproximación

88

Page 89: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FASE 6 - APROXIMACION

2,8 2,8

2,5

2,1

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

COM =

Comunicación

LTC = Liderazgo,

trabajo en equipo yadministración de la

carga de trabajo

AAT =

Administración de laautomatización y la

tegnología

TEM =

Administracion de laamenaza y el error

Rating Promedio TPO Factores Humanos - Fase 6 Aproximación

89

Page 90: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FASE 7 - ATERRIZAJE

2,5 2,5 2,1

0

0,5

1

1,5

2

2,5

3

3,5

4

SPO 7.1.1: Ejecutar un aterrizaje manual SPO 7.1.3 Ejecutar un aterrizaje conviento cruzado

SPO 9.3.8.4:Ejecutar procedimientos no-normales de Protección contra el fuego

– CARGO FIRE

Rating SPOs - Fase 7 Aterrizaje

2,1

2,7 2,7 2,7

2 2,2 2,1

0

0,5

1

1,5

2

2,5

3

3,5

4

SPO 10.1.1:Detectar y manejarla amenaza (TEM)

SPO 10.2.2Transmitir y/o

recibir el contenidode la información

(COM)

SPO 10.2.3Transmitir

adecuadamente lasdecisiones (COM)

SPO 10.4.2Comprender lo queha percibido (CSI)

SPO 10.5.1 Obtenery analizar la

información (PTD)

SPO 10.5.3Establecer cursos de

acción (PTD)

SPO 10.1.2:Detectar y manejar

el error (TEM)

SPOs Factores Humanos - Fase 7 Aterrizaje

90

Page 91: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

FASE 7 - ATERRIZAJE

2,1

2,7 2,7

2,1

0

0,5

1

1,5

2

2,5

3

3,5

4

4,5

5

TEM =

Administracion de laamenaza y el error

COM = Comunicación CSI = Conciencia

Situacional

PTD = Planificación y

toma de decisiones

Rating Promedio TPO Factores Humanos - Fase 7 Aterrizaje

91

Page 92: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Que Generación de CRM ??? 1° Generación

Cockpit resource management

2° Generación

Cabin Crew resource management

3° Generación

Corporate ,Complete RM

4° Generación

Integración en Entrenamiento CRM/HT

. Base de Datos

. LOFT- LOE

5° Generación

. Error Humano es inevitable

. Modelo TEM (administración del Error)

. LOSA

6° Generación

. Integración CRM con el modelo TEM (Contramedidas)

AQP

92

Page 93: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Los seres humanos tenemos limitaciones. (Vulnerabilidad del piloto) Como consecuencia, las personas (incluso las personas COMPETENTES ) cometen errores. Hay factores externos al sitio de trabajo (sea o no la cabina de pilotaje), que inducen al error.

Existen amenazas externas contra la seguridad.

¿ PORQUE TEM ?

93

Page 94: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

NORMAL SITUATION

THREAT

CREW ERROR

UNDESIRED

AIRCRAFT STATE

INCIDENT/ACCIDENT

THREAT MANAGEMENT

AVOIDANCE / TRAP

Crew Error/MANAGEMENT

MITIGATE

UNDESIRED AIRCRAFT STATE

MANAGEMENT

MODELO TEM

94

Page 95: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

95

Page 96: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

96

Page 97: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

PREGUNTAS:

CUALES SON LAS AMENAZAS QUE ENFRENTABAN?

CUALES FUERON LOS ESTADOS NO DESEADOS ?

QUE ERRORES COMETIERON?

CUAL FUE EL DESENLACE?

QUE CONTRAMEDIDAS SE APLICARON?

97

Page 98: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

STATUS

PROGRAMA AQP

LATAM

98

Page 99: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

LECCIONES APRENDIDAS

CONCLUSIONES / MEJORAS

EN LA SEGURIDAD

OPERACIONAL

99

Page 100: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

“Dificultades en el camino”

• Autoridad Aeronáutica (reglamentación)

• Falta de Experiencia en programas AQP

• Sistemas informáticos Lan.

• Revisión de documentación A.A

• Simuladores de vuelo

• Asignación de I/E de acuerdo a disponibilidad (Rol v/s Dias AQP)

• Estructura de soporte programa AQP ( organozación, Salas)

• Facilidades a los Integrantes de Team AQP

• Asignación de Recursos insuficientes

• Resistencia al cambio)

• Falta de información adecuada” Marketing AQP” (Fase IV por fin!!)

• Copy –Paste

• Complejidad y detalle de la documentación

100

Page 101: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Costos del AQP

AQP NUEVO SISTEMA DE ENTRENAMIENTO

Documentación (1000 PAGINAS)

Procesos de recopilación de datos

Transición Instructores/evaluadores /tripulaciones/administrativos

Mantención nuevo sistema de entrenamiento 2-4 I/E 10-20 días Mes

Mantener el programa de estandarización/ calibración I/E

Mantener base de datos

Generar documentación de entrenamiento/evaluación anualmente

Desarrollar y mantener una estructura de soporte.

101

Page 102: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Beneficios AQP

Mejor Entrenamiento = Mejores Pilotos

• Pilotos califican AQP “ mas útil, real , Objetivo”

• Entrenamiento mejora competencia en la línea de vuelo

• “Entrenar como se vuela” “ Volar como

se entrena”

• Entrenamiento/evaluación de lo requerido

• Foco entrenamiento necesidades de Cia./flota

102

Page 103: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

Beneficios AQP

• Trabajo conjunto con Autoridad Aeronáutica

• Datos entrenamiento detallado en base de datos

• Evaluación de la efectividad del entrenamiento en Habilidades técnicas y CRM

• I/E son calibrados y evaluados

103

Page 104: ADVANCED QUALIFICATION PROGRAM (AQP) … AQP OACI... · -In accordance with LAN FCOM, QRH, FCTM, SOP ... 2.2.1 Perform Normal Takeoff (Sub-tarea) 2.2.1.1 [K, C] Monitor EICAS and

55%

17%

13%

7%

5%

0% 10% 20% 30% 40% 50% 60% 70% 80%

Tripulación (FFHH)

Avión

Clima

Misc./Otros

Aeropuerto/CTA

Mantenimiento 3%

Previous Boeing studies showed higher rates for

Flight Crew Error (FFHH):

1988 – 1997: 70%

1990 – 1999: 67%

1992 – 2001: 66%

1994 – 2003: 62%

1995 – 2005: 55%

Study by Boeing

Statistical Summary July 2008

Reducción tasas de accidentes 1988 - 2005

104