8/3/2017 1 EXCHANGING EXPERTISE SINCE 1893 NWEMS Advanced Metering – 4 Quad, TLC, PT/CT Correction August 2017| Track D | Matt Anthony, Schneider Electric EXCHANGING EXPERTISE SINCE 1893 » Fourquadrant metering Why do it? » CT/PT correction Why do it? Reading an instrument transformer test card Entering into meter software » System Loss/Transformer Loss Compensation What is it and why is it done? Using a spreadsheet to calculate coefficients 2 Agenda
14

Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

Jun 04, 2018

Download

Documents

lynguyet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

1

EXCHANGING EXPERTISE SINCE 1893 

NWEMS

Advanced Metering ‐ – 4 Quad, TLC, PT/CT Correction

August 2017|  Track D |  Matt Anthony, Schneider Electric

EXCHANGING EXPERTISE SINCE 1893 

» Four‐quadrant metering

– Why do it?

» CT/PT correction

– Why do it?

– Reading an instrument transformer test card

– Entering into meter software

» System Loss/Transformer Loss Compensation

– What is it and why is it done?

– Using a spreadsheet to calculate coefficients

2

Agenda

Page 2: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

2

EXCHANGING EXPERTISE SINCE 1893 

» This diagram shows the concept of quadrants for noting W, VAR, and VA

» There is a correlation to the meter's vector diagram

Relation to power factor:

– Q1=Lag (+W, +VAR)

– Q2=Lead (‐W, +VAR)

– Q3=Lag (‐W, ‐VAR)

– Q4=Lead (+W, ‐VAR)

3

Quadrants

EXCHANGING EXPERTISE SINCE 1893 

» Ratio Correction Factor

– Ratio of true ratio to the marked ratio

• Burden (secondary load) will affect the true ratio

• In the case of a CT, the primary current magnitude will affect the true ratio (i.e. 10% or 100% current)

» Phase Angle of an Instrument Tran

– The phase angle is the difference in minutes between the primary voltage or current and the secondary voltage and current

4

Terms of Accuracy Performance

Page 3: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

3

EXCHANGING EXPERTISE SINCE 1893 

» Phase Angle (continued)

– Phase angle is important because in order to calculate Watts, the angle is needed as shown in the equation below:

– W + E x I x Cos(e), where e is the phase angle

» Transformer Correction Factor (TCF)

– Correction for overall error due to both ratio and phase angle error

5

Terms of Accuracy

EXCHANGING EXPERTISE SINCE 1893 

» Current Transformer Parallelograms

– The results of the test must be within the outer parallelogram for the transformer to meet the 0.3 accuracy class at 10% of rated current

– The results of the test must be within the inner parallelogram for the transformer to meet the 0.3 accuracy class at 100% of rated current

6

Current TransformersANSI CT Accuracy Class

Page 4: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

4

EXCHANGING EXPERTISE SINCE 1893 

» Voltage Transformer Parallelogram

– 0.3 Accuracy class shown

– The results of a transformer test must be within the parallelogram for the transformer to meet the 0.3 accuracy class

7

Voltage TransformersANSI VT Accuracy Class

EXCHANGING EXPERTISE SINCE 1893 8

CT Transformer Correction Factor

For example, the overall correction will never exceed .3% at 100% rated current for a transformer in the 0.3 accuracy class. If the ratio correction factor is 1.003 the maximum allowable phase angle is +15.6 minutes.  The transformer correction factor is:

The corresponding ratio correction factor and phase angle for any point inside the 0.3 class parallelogram for 100% rated current will always give a transformer correction factor between .997 and 1.003.

Page 5: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

5

EXCHANGING EXPERTISE SINCE 1893 

For example, the overall correction will never exceed .3% for a transformer in the 0.3 accuracy class.  If the ratio correction factor is 1.003 the maximum allowable phase angle is – 15.6 minutes. The transformer correction factor is: 

The corresponding ratio correction factor and phase angle for any point inside the 0.3 class parallelogram will always give a transformer correction factor between .997 and 1.003.

9

VT Transformer Correction Factor

EXCHANGING EXPERTISE SINCE 1893 

» Correct for instrument transformer inaccuracies

» Corrections are typically applied to all values in the meter

» Values to enter in the meter software come from the instrument transformer test card

» Improves system accuracy

10

CT/PT Correction

Page 6: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

6

EXCHANGING EXPERTISE SINCE 1893 11

CT/PT Correction

Ratio  correction factor

Phase angle in minutes

EXCHANGING EXPERTISE SINCE 1893 

» What if the original test card is not available?

– Shop Test

• Knopp KC1500, for example

– Comparator will give phase angle and ratio correction valuesbelow:

– Field Test

• Test CTs in‐service to get the necessary data

– Be aware of the loading on the CTs

– May not be enough current to put CT in “sweet spot”

12

CT/PT Correction

Page 7: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

7

EXCHANGING EXPERTISE SINCE 1893 13

Correcting for CT/PT in Meter

EXCHANGING EXPERTISE SINCE 1893 

» Transformer loss compensation (TLC) is used when the billing point is on the high voltage side of a transformer and the metering point is on the low voltage side

» Through calculations in the meter, it is possible to account for the iron (core) loss and copper (load) loss associated with the transformation

14

Transformer Loss Compensation

Page 8: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

8

EXCHANGING EXPERTISE SINCE 1893 

» Can be used in combination with instrument transformer correction to maximize system accuracy

» It may be possible to show compensated and uncompensated values on the meter's display

» The information for calculating TLC is generally collected from the power transformer's nameplate

» Let's look at an example...

15

Transformer Loss Compensation

EXCHANGING EXPERTISE SINCE 1893 

» In order to calculate the TLC coefficients, we need to find out some information about the transformer

» Typically located in the transformer test report or on the nameplate

16

Transformer Loss Compensation

Page 9: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

9

EXCHANGING EXPERTISE SINCE 1893 

» We need to calculate the transformer var losses

17

Transformer Loss Compensation

EXCHANGING EXPERTISE SINCE 1893 

» System loss compensation (SLC) takes into account the load losses associated with a metering system

» May be composed of things like

» Transmission lines

» Substation conductors

» Each component can be characterized in terms of watt and varlosses and use to calculate the total load loss

18

System Loss Compensation

Page 10: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

10

EXCHANGING EXPERTISE SINCE 1893 

» One component of SLC is transmission line losses

» Let's consider an example

– Transmission line is 36 miles long and has a negligablecapacitive effect. At 60Hz and 50oC it has 0.306Ω resistance and 0.451Ωreactance per mile per line

19

System Loss Compensation

EXCHANGING EXPERTISE SINCE 1893 

» In the substation, there are losses associated with the conductors between the secondary of the power transformer and the metering point

» Example

– Total length = 156 ft

– Conductor resistance = 0.005Ω/1000 ft

– Conductor reactance = 0.09Ω/1000 ft

20

System Loss Compensation

Page 11: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

11

EXCHANGING EXPERTISE SINCE 1893 

» Current transformer ratio, CTR = 500:5 = 100:1

» Voltage transformer ratio, VTR = 7200:120 = 60:1

» Meter voltage rating, Vm

– Assume 120V

» Inom, meter test amps 

– TA = 5A

21

Watt Loss Constantson

EXCHANGING EXPERTISE SINCE 1893 

» Total load watt losses 

– TLW = FLW + LLW + CLW

» Total load var losses 

– TLV = FLV + LLV + CLV

» Let's summarize our calculations so far...

22

Total System Losses

Page 12: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

12

EXCHANGING EXPERTISE SINCE 1893 23

Var Loss Constants

EXCHANGING EXPERTISE SINCE 1893 

» When calculating the percentage loss constants for a delta load, the VT ratio and metered voltage is different from our previous example of wye load

24

SLC Calculations for Delta Load

Page 13: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

13

EXCHANGING EXPERTISE SINCE 1893 25

Calculating SLC via Spreadsheet

EXCHANGING EXPERTISE SINCE 1893 26

Some Use Cases

Page 14: Advanced Metering –4 Quad, TLC, PT/CT Correction€¦ · Advanced Metering ‐–4 Quad, TLC, PT/CT Correction ... Current Transformers ANSI CT Accuracy Class. ... Correcting for

8/3/2017

14

EXCHANGING EXPERTISE SINCE 1893 

Any questions before concluding?