Top Banner
Advanced Framing for Passive House Katy Hollbacher, P.E. | beyondefficiency.org June 28, 2009 Hosted by: Passive Buildings California Berkeley, California
21

Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Jun 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Advanced Framing for Passive House

Katy Hollbacher, P.E. | beyondefficiency.org June 28, 2009

Hosted by: Passive Buildings California Berkeley, California

Page 2: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Goals for Today

2

  Typical structural approach & issues

  Advanced Framing definition

  Benefits & relevance to Passive House

  How to do it!

Siegel & Strain

Page 3: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Typical Engineering Approach

3

  Linear process: little or no collaboration

  Lack of understanding of each others’ issues  “Architect designs things that

are expensive to engineer”  “Engineer doesn’t have any

sense of aesthetics”   Ignoring of energy &

resource implications

Page 4: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Resource Waste

4

  What is T24 ‘framing factor’?  25% (!)  Wasted resources  Added cost: materials, labor &

waste management

Page 5: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Energy Loss

5

  More wood= less insulation   More stuff=

 Harder to insulate  Harder to air seal  (Harder to get PH cert!)

  U.S. Department of Energy:  improve a wall’s effective R-value up to 30%  save 3-5% on heating and cooling costs

Page 6: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Framing Comparison

6

  USDE study:

Page 7: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

What Is Advanced Framing?

7

  Systems approach to design, engineering, and construction of wood-framed structures that:  Reduces lumber use  Minimizes wood waste  Maximizes a structure’s thermal efficiency…

  While maintaining structural integrity and meeting building codes!

Page 8: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Advanced Framing Principles

8

①  Consider energy efficiency when designing the structural system

②  Optimize layout for efficient material use ③  Use structural-rated wood materials to their

full approved capacities ④  Eliminate structural materials where non-

structural materials are adequate ⑤  Reduce the structural redundancies inherent

with conventional stick framing

Page 9: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Advanced Framing Measures

9

Page 10: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Modular Layout

10

  Lay out building on two foot module:  Maximize efficiency of 24 inch

framing and 4x8 sheet goods  Reduce materials, labor & waste  Increase energy performance

  Keep plans simple   Place openings on module   Provide detailed framing elevs.

U.S Department of Energy

Page 11: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Framing Greater than 16” o.c.

11

  19.2” or 24”

Page 12: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

CBC Table 2308.9.1"

12

Page 13: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Energy Heels on Roof Trusses

13

 General rule-of-thumb:  75% of attic insulation

height at outer edge of ext. wall

 More for Passive House?

  Structural considerations

Page 14: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Headers Sized for Load

14

  Rather than one option for worst-case scenario   None where there’s no load!

Yes

No

Page 15: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Insulated Headers

15

Page 16: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Header Hangers

  Jack/trimmer studs typically used to carry header loads

  Replace with framing anchors when adequate (often OK when replacing single jack stud)

16

Page 17: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Open Wall Corners

17

  3 or 4 studs typically used!   Use 2-stud detail with

non-structural backing to support drywall per CBC 2308.9.2.  Backing can be wood,

specified sheathing or panel materials, and “other approved devices”

Page 18: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

How do I start?

18

  Read Building Science Corp’s Using Wood Efficiently: From Optimizing Design to Minimizing the Dumpster research report:  www.buildingscience.com/documents/reports

  Read NRDC’s Efficient Wood Use in Residential Construction handbook:  www.nrdc.org/cities/building/rwoodus.asp

  Develop and discuss Advanced Framing goals in initial meetings

Page 19: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

Barriers to Advanced Framing

19

  Architect: it will limit my creativity and design options

  Engineer: I don’t want to do things a new way. I like to overdesign because I know what can happen in the field.

  Builder: I don’t want to introduce new techniques that might concern the inspector and slow down the project.

  Clients: more wood is better. I don’t want to pay more for added design & planning.

Page 20: Advanced Framing for Passive Housepassivehousecal.org/sites/default/files/media/2009-0628... · 2012-05-02 · Advanced Framing for Passive House June 28, 2009 Katy Hollbacher, P.E.

How to collaborate?

20

  Identify project goals.  Assemble quality team—and educate

them.  How will accountability by measured or

verified?