Adrian L. Bastianelli, IIIPaul C. MonteMichael C. Zisa

Joint Ventures

1

Page 2: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Presenters

• Adrian Bastianelli is the co-managing partner of P&A's Washington, DC office.

• Paul Monte is the co-managing partner in P&A's New York office.

• Mike Zisa is a partner in P&A's Washington, DC office.

2

Page 3: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Joint Ventures Generally

• Definition• Advantages of Using a Joint Venture• Liability of Joint Venture Partners– Joint and Several– Liability Between Joint Venture Partners

• Teaming Agreements vs. Joint Venture Agreements

3

Page 4: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Types of Joint Ventures

• Percentage Based• Line Item Joint Venture• JV that Subcontracts to a Partner• Design-Build Joint Venture• “Silent” Joint Venture• Small Disadvantaged Business Joint Ventures• Pre-Bid Joint Venture Agreements

4

Page 5: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

General Provisions

• Name• Members• Purpose• Bank Accounts• Licensing• Duration of Joint Venture• Ownership Interests

5

Page 6: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Form of Joint Venture

• Partnership• Consortium• Single Purpose Entity– LLC– Corporation

6

Page 7: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Capitalization

• Bidding Costs• Initial Capital Contributions• Additional Capital Contributions• Failure to Meet Cash Calls• Third Party Financing

7

Page 8: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Profits

• Definition of Profits• Costs Chargeable to Joint Venture• Repayment of Capital Contributions• Timing of Distribution• Books and Records

8

Page 9: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Management

• Managing Partner– Removal or Change of Managing Partner– Liability of Managing Partner

• Management Committee– Problems with 50/50 Vote

• Day to Day Operations– Project Manager

• Access to Information• Audit

9

Page 10: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Subcontracting

• Choice of Subs• Subcontracting to a Joint Venture Partner– Payment• How and When• Retention

– Payroll– Insurance

• Subcontracting Where Joint Venture Is a DBE

10

Page 11: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Manpower and Equipment

• Who Provides Manpower and Equipment– Skilled Labor– JV Partner Owned Equipment

• Who Provides Supervision– Choice of Project Management and Field Supt.

• Accounting for Supervision and Equipment– Agreed Rates– Tracking of Equipment Usage

11

Page 12: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Default of a Joint Venture Partner

• Types of Default Breach of a Specific Joint Venture Term

o Failure to Meet a Capital Callo Failure to Provide Resourceso Failure to Timely Perform

Other types of defaulto Failure to Meet Standard of Careo Breach of Implied Duty of Good Faith and Fair Dealingo Failure to Disclose

• Remedies for Default Notice Right to Cure Consequences of Default

12

Page 13: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Withdrawal or Dissolution

• Rare in Construction Joint Ventures• Notice to Owner, Subcontractors, and Surety• Continuing Liability of the Withdrawing

Partner

13

Page 14: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Insurance

• Who Provides– Subrogation Rights

• Coverage– General Liability– Workers’ Comp– Equipment– Builder’s Risk or Completed Operations– E&O

14

Page 15: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Bonding

• Underwriting Considerations– Review of All participants of the Joint Venture– Review of Joint Venture Agreement– "Angel Deals"– Additional Consideration for Certain Federal

Programs • Limited Number of Joint Venture Contracts• Statutory Requirements for Joint Venture• Consequences for Noncompliance

15

Page 16: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Bonding

• Indemnity Requirements– Indemnity Agreement– Joint and Several liability

• Issuing Bonds to a JV – Get the Name Right

• Potential Conflicts for Sureties & Bond Producers– Claims– Losses

• Business disputes

16

Page 17: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Disputes Between the Partners

• Disputes Between the Joint Venture and Third Parties Should be Addressed in the Joint Venture Agreement Cooperate With Each Other How Decisions Regarding Prosecution of the Claims Will Be Made

• Disputes Between Joint Venture Partners Day to Day Decisions Interpretation of the Agreement Defaults

• Special Defenses– Gross Negligence or Fraud– Limitations of Liability

17

Page 18: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Dispute Resolution Between the Partners

• Types of Decision Making Day-to-Day Operational Decisions – Project Manager Normal Course of Business Decisions – Management

Committee Disputes Between the JV Partners

• Disputes Consensual Decision Tie Breaker Mechanism

• Mediation• Arbitration/Litigation

18

Page 19: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Standard Form Agreements

• AGC• AIA• Other• Most Joint Ventures

Don't Use Standard Form Agreements

19

Page 20: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Design-Build Joint Ventures

20

Page 21: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Design-Build Joint Ventures

• Designers Role– Pre-Bid• Reliance on Design

– Post-Bid

• Format– Joint Venture – Partner at Risk– Subcontract

21

Page 22: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Design-Build Joint Ventures

• Considerations in Selection of Designer– Experience– Size– Insurance

• Designers Often Seek Limits on Liability• Fee Structure• Incentives

22

Page 23: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Design-Build Joint Ventures

• Design Obligations and Liability• Coordinating Design and Construction• Delay• Licensing• Errors and Omissions Insurance• Sureties Liability for Design Errors

23

Page 24: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Typical P3 Project Structure

24

Page 25: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Risk Transfer “Maximization”

• Political Risk• Downstream Risk Transfer Pressure• Design-Build +++• Design Build Risk Assumption– Design and Professional Standard of Care Issues– Permits and Approvals– Differing Site Conditions

• Utilities• Environmental

25

Page 26: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Owner's Role

• ROW• Utilities• Site Conditions• Permits• Time & Scope of Design Review– Conformity with Design Intent– Compliance with Standard Specifications– Nonconformance Reports

26

Page 27: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Warranties and Changes Orders

• Warrant Results & Success:– Design & Performance Criteria– Completed Operations– Tests

• Limited Change Orders– Impacts by Owner– Changed Conditions– Design Errors & Omissions

27

Page 28: Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.

Your Questions?

If you do not have the opportunity to have your question addressed during the seminar, you may

contact the presenter directly:

Adrian Bastianelli: [email protected] Monte: [email protected]

Mike Zisa: [email protected]

28