Top Banner
Non-Toll Revenue & Sectional Completion M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate
11

Additional slide ntr & sc

Nov 07, 2014

Download

Travel

giap0083

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Additional slide ntr & sc

Non-Toll Revenue & Sectional Completion

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

Page 2: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

Page 3: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

Page 4: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

CNG / Patrol Station adjacent to superhighway which having tenancy agreement with NHA are one of the Non-Toll-Revenue.

Upon taking-over of site, the tenancy agreement of CNG / Patrol Station owner will transfer to Concessionaire and the rental will be collected by the Concessionaire through out the 28 years concession period.

Page 5: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

Existing Restraurent adjacent to superhighway which having tenancy agreement with NHA are one of the Non-Toll-Revenue.

Upon taking-over of site, the tenancy agreement of Existing Restraurent owner will transfer to Concessionaire and the rental will be collected by the Concessionaire through out the 28 years concession period.

Page 6: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

De-acceleration Lane

Acceleration Lane

Service Lane

Fencing

Page 7: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

The monthly rental of existing buried utilites (cables & etc…) within the NHA ROW are being collected by NHA.

Such Rental will later be collected by Concessionaire upon taking over of site .

Page 8: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

Advertising along the Motorway will enable concessionaire to generate NTR.

Page 9: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

Page 10: Additional slide ntr & sc

M9 – MOTORWAY Non-Toll-Revenue (NTR) & Sectional Completion Certificate

KARACHI

HYDERABAD

Application of Quarry Land (1,500 acres) hasbeen submitted to Mines & Mineral Dept of Sindh for Base CampSetup & Quarry Plant Setup.

Strategy in the planning to assign full-swing construction team in between Nooribad & Hyderabad to archieve 50% continuous stretch

1) Nooribad – Hyderabad : semi urban & rural area, less disturbance in term of land acquisition & traffic diversion.

2) To finish the mentioned rutting road destress area to gain favor and confidence from motorist.

Page 11: Additional slide ntr & sc

M9 – MOTORWAY KEY ENGINEERING FEATURES

~ THANK YOU ~