IFB 9740 (Addendum #1) ADDENDUM NO. 1 DATE: April 6, 2015 TO: ALL BIDDERS OWNER: University of Central Missouri (UCM) Department of Procurement & Materials Management Southeast Complex Building A 415 East Clark Street Warrensburg, MO 64093 SUBJECT: Addendum #1 for IFB 9740 (Dehumidification Unit Replacement Project) _____________________________________________________________________________ THIS ADDENDUM IS ISSUED AS PART OF THE BID DOCUMENTS FOR THIS BID AND AMENDS ONLY THOSE ITEMS SPECIFICALLY DEFINED HEREIN. PLEASE ACKNOWLEDGE THE RECEIPT OF THIS ADDENDUM ON THE ATTACHMENT A BID FORM. ______________________________________________________________________________ This addendum forms a part of the Bid Documents and modifies the Bidding Documents dated March 18, 2015 with clarification noted below. In preparing bids, the Bidder shall take into consideration the following items. Information shown herein supersedes requirements issued under previous date. Clarifications: Mechanical Sheet Revisions: M101 The remote interface unit control panel for the new dehumidification unit was relocated to the roof penthouse at the top of the roof access ladder. Questions: Question: There have apparently been patches where the existing Pool-Pak and Roof Curb meet. How is this to be addressed? Response: It will be the contractor’s responsibility to re-flash the top of the roof curb and insure the integrity of the seal between the Roof Curb and New Pool-Pak. Question: Does the existing Pool-Pak and associated Lines contain Glycol? Response: No. Question: Are there Isolation Valves? If so, where? Do they Operate? Response: Yes, there are means by which to isolate the Pool Water Supply and Return as well as the Hot Water Supply and Return. They are in the Pool Equipment and Mechanical Rooms in the Basement. All operated the last time they were used. Question: Sheet M101, Demo Plan Note #8 calls for the removal the existing temperature sensor, wiring and conduit. How far back the existing conduit to be removed? Response: Cut the existing conduit behind the Supply dust to provide an unobtrusive transition between the older and new conduit, as it then extends to the new sensor location.
4

ADDENDUM NO. 1 DATE: April 6, 2015 OWNER: University · PDF fileOWNER: University of Central Missouri (UCM) ... Mechanical Sheet Revisions: M101 ... Question: Where is the New

Mar 06, 2018

Download

Documents

dinhtram
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ADDENDUM NO. 1 DATE: April 6, 2015 OWNER: University  · PDF fileOWNER: University of Central Missouri (UCM) ... Mechanical Sheet Revisions: M101 ... Question: Where is the New

IFB 9740 (Addendum #1)

ADDENDUM NO. 1 DATE: April 6, 2015

TO: ALL BIDDERS

OWNER: University of Central Missouri (UCM)

Department of Procurement & Materials Management

Southeast Complex Building A

415 East Clark Street

Warrensburg, MO 64093

SUBJECT: Addendum #1 for IFB 9740 (Dehumidification Unit Replacement Project)

_____________________________________________________________________________

THIS ADDENDUM IS ISSUED AS PART OF THE BID DOCUMENTS FOR THIS BID AND AMENDS ONLY

THOSE ITEMS SPECIFICALLY DEFINED HEREIN. PLEASE ACKNOWLEDGE THE RECEIPT OF THIS

ADDENDUM ON THE ATTACHMENT A – BID FORM.

______________________________________________________________________________

This addendum forms a part of the Bid Documents and modifies the Bidding Documents dated March 18, 2015 with

clarification noted below.

In preparing bids, the Bidder shall take into consideration the following items. Information shown herein supersedes

requirements issued under previous date.

Clarifications:

Mechanical Sheet Revisions:

M101 – The remote interface unit control panel for the new dehumidification unit was relocated to the roof

penthouse at the top of the roof access ladder.

Questions:

Question: There have apparently been patches where the existing Pool-Pak and Roof Curb meet.

How is this to be addressed?

Response: It will be the contractor’s responsibility to re-flash the top of the roof curb and insure the

integrity of the seal between the Roof Curb and New Pool-Pak.

Question: Does the existing Pool-Pak and associated Lines contain Glycol?

Response: No.

Question: Are there Isolation Valves? If so, where? Do they Operate?

Response: Yes, there are means by which to isolate the Pool Water Supply and Return as well as the

Hot Water Supply and Return. They are in the Pool Equipment and Mechanical Rooms in

the Basement. All operated the last time they were used.

Question: Sheet M101, Demo Plan Note #8 calls for the removal the existing temperature sensor,

wiring and conduit. How far back the existing conduit to be removed?

Response: Cut the existing conduit behind the Supply dust to provide an unobtrusive transition

between the older and new conduit, as it then extends to the new sensor location.

Page 2: ADDENDUM NO. 1 DATE: April 6, 2015 OWNER: University  · PDF fileOWNER: University of Central Missouri (UCM) ... Mechanical Sheet Revisions: M101 ... Question: Where is the New

IFB 9740 (Addendum #1)

Question: May the existing conduit be reused?

Response: Other than the section of conduit and box being removed with the existing temperature

sensor. All other conduit is to remain. Removed conduit is to be discarded and not re-used.

Question: Where is the New Temperature Sensor to be located?

Response: Refer to Sheet M101, Plan Note #3.

Question: Is a Test and Balance Report required?

Response: As this is the specified unit is a direct replacement for the existing equipment, the

conventional Test and Balance Report will not be required.

M101 - Updated Drawing:

Page 3: ADDENDUM NO. 1 DATE: April 6, 2015 OWNER: University  · PDF fileOWNER: University of Central Missouri (UCM) ... Mechanical Sheet Revisions: M101 ... Question: Where is the New
Page 4: ADDENDUM NO. 1 DATE: April 6, 2015 OWNER: University  · PDF fileOWNER: University of Central Missouri (UCM) ... Mechanical Sheet Revisions: M101 ... Question: Where is the New

IFB 9740 (Addendum #1)

By the order of: Roderick M. Woolen

Buyer of Record

END ADDENDUM