  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    1/16

    Name of the School : Adarsha Ma. Vi.Location : Bhadrabas, Kathmandu

    No. of Storey : 3

    S.N. Items Unit Nos Length(m) Total Length(m) Breadth(m) Height(m) Q

    1.1 Site Clearance and necessary arrangement for Works L.S.

    1.2 Dismantling Works

    1.2.1 Demolition Works for RCC Slab

    Top Floor Roof Slab, Beam 1 10.671 1.500 6.860 0.101 1

    Pillars 4 0.229 1.000 0.229 2.744

    Cub.m 1

    1.2.2 Demolition of Brick Masonary in Cement Mortar

    Stair Case Wall 6 1.753 0.229 2.744Top Floor 2 9.756 0.229 2.744 1

    2 4.268 0.229 2.744

    4 2.439 0.101 2.744

    2

    Deduction for Openings

    D3 3 0.762 0.229 2.134

    W8 6 0.610 0.229 0.610

    D3 3 0.762 0.128 2.134

    2 1.220 0.229 2.134

    Total Cub.m 1

    1.2.3 Removing of existing doors/windows

    Doors 7

    WINDOWS 8

    Nos

    4 Wire Mesh jacketing

    4.1

    Scrappingof strong mortared plaster that con not be easily

    remove by hand tools without additional hammering,

    raking joint upto 10mm surface dressing etc.

    Building 1 Long Side 2 43.750 8.588 7

    Short Sides 2 11.890 8.588 2

    Building 2 Long Side 2 17.683 8.588 3

    Ministry of Education

    Department of Education

    Sanothimi, Bhaktapur

    Seismic Vulnerability Assessment and Retrofit Design of School Building in KathmanduDistrict

    Type of Building : Load Bearing Wall, RCC Roof

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    2/16

    Short Sides 2 12.957 8.588

    Deduction for Openings

    D1 12 1.220 2.134

    D2 3 1.220 2.134

    W1 14 1.220 1.372

    W4 10 1.220 1.220

    W5 10 0.915 1.372

    W6 8 1.829 1.677

    W2 2 1.524 1.372

    W3 1 0.762 1.524

    Sq.m Total

    4.2 4.75mm . Anchor bars @ 600mm/cc staggered 1

    Deduction for openings

    Nos

    4.3 4.75mm @150 mm c/c both way Torsteel Mesh

    Sq.m 1362.258

    4.4

    50mm th. micro concreting in 1:1.5:3 (25mm th outer

    coat over 25mm th first coat)

    Sq.m 1362.258

    4.5 12.5 mm thk. Leveling plaster coat in 1:3 C/S

    Sq.m Total

    4.6 Two coat of weather coat paints over one cooat of primer

    Sq.m Total

    5 Construction of vertical/Horizontal Bands Ground Floor

    5.1

    Scrappingof strong mortared plaster that con not be easily

    remove by hand tools without additional hammering,

    raking joint upto 10mm surface dressing etc.

    Ground Floor

    Grid A-A 2 5.714 11.428

    Grid B-B 2 5.714 11.428

    Grid C-C 2 5.714 11.428

    Grid D-D 2 21.866 43.732

    Grid E-E 2 21.866 43.732

    Grid 1-1 2 5.940 11.880

    Grid 2-2 2 5.940 11.880

    Grid 3-3 1 5.940 5.940

    Grid 4-4 2 15.660 31.320

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    3/16

    Grid 5-5 2 15.660 31.320

    214.088 2.363

    Deduction for Voids & Openings

    D1 5 1.220 2.134

    W1 4 1.829 1.220

    W2 1 1.500 1.220

    W3 1 0.750 1.220

    W4 3 1.219 1.220

    W5 3 1.000 1.220

    W6 3 2.000 1.220

    Total

    First Floor

    Grid A-A 2 5.714 11.428

    Grid B-B 2 5.714 11.428

    Grid C-C 2 5.714 11.428

    Grid D-D 2 21.866 43.732

    Grid E-E 2 21.866 43.732

    Grid 1-1 2 5.940 11.880

    Grid 2-2 2 5.940 11.880

    Grid 3-3 1 5.940 5.940

    Grid 4-4 2 15.660 31.320

    Grid 5-5 2 15.660 31.320

    214.088 2.363

    Deduction for Voids & Openings

    D1 5 1.220 2.134

    W1 4 1.829 1.220

    W2 1 1.500 1.220

    W3 1 0.750 1.220

    W4 3 1.219 1.220

    W5 3 1.000 1.220

    W6 3 2.000 1.220

    Total

    Second Floor

    Grid A-A 2 5.714 11.428

    Grid B-B 2 5.714 11.428

    Grid C-C 2 5.714 11.428

    Grid D-D 2 21.866 43.732

    Grid E-E 2 21.866 43.732

    Grid 1-1 2 5.940 11.880

    Grid 2-2 2 5.940 11.880

    Grid 3-3 1 5.940 5.940

    Grid 4-4 2 15.660 31.320

    Grid 5-5 2 15.660 31.320

    214.088 2.363

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    4/16

    Deduction for Voids & Openings

    D1 5 1.220 2.134

    W1 4 1.829 1.220

    W2 1 1.500 1.220

    W3 1 0.750 1.220

    W4 3 1.219 1.220

    W5 3 1.000 1.220

    W6 3 2.000 1.220

    Total

    Grand Total Sq.m

    5.2 8mm dia Bars for Bands

    5 nos bars/band Ground Floor Vertical Bands 78 2.363 184.299 5.000 0.395

    5 nos bars/band First Floor Vertical Bands 78 2.515 196.189 5.000 0.395

    5 nos bars/band Second Floor Vertical Bands 28 2.744 76.829 5.000 0.395

    5 nos bars/band Ground Floor Horizontal Bands 5 80.744 403.720 5.000 0.395

    5 nos bars/bandFirst Floor Horizontal Bands 5 84.994 424.970 5.000 0.395

    5 nos bars/band Second Floor Horizontal Bands 5 37.140 185.701 5.000 0.395

    1471.707

    10% for bending, binding, laps,wastage, etc

    4.75mm dia Stirrups @ 150 c/c

    9891 0.600 0.139

    10% for bending, binding, laps,wastage, etc

    kg

    5.3

    50mm th. micro concreting in 1:1.5:3 (25mm th outer

    coat over 25mm th first coat)

    Sq.m

    5.4 12.5 mm thk. Leveling plaster coat in 1:3 C/S

    Sq.m

    5.5 Two coat of distemper over one coat of primer

    Sq.m

    5.6

    PCC 1:1.5:3 work concrete pocket for anchoring Vertical

    Bands Cub.m 110 0.600 0.400 0.075

    6 Relocating existing doors/windows no 4

    7 Two coat of white wah on Ceiling Surface

    3 21.951 7.012

    3 9.756 8.232

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    5/16

    sq.m

    8 Column, Footing & Beam Jacketing

    8.1 Earth work in Excavation for Footing of Column 8 1.850 1.850 0.850

    8.2 Reinforcement bar

    10mm dia Re-bar @125c/c 256 1.850 0.620

    16mm dia bar 64 1.500 1.580

    8mm dia bar Stirrups@ 150 c/c 56 2.400 0.395

    10% for bending, bimding, Wastage, etc.

    kg

    8.3 PCC 1:2:4

    Footing 8 1.850 1.850 0.250

    Column pad 8 0.600 0.600 0.600

    cub.m

    8.4 Column Beam Jacketing (Steel)

    ISA 45x45x6 HoriZontal 15 1.240

    ISA 30x30x4 260 1.240

    ISA 45x45x6 HoriZontal 4 2.744

    ISA 30x30x4 80 2.744

    Kg

    8.5 Beam Jacketing (Steel)

    ISA 30x30x4 2 23.880

    ISA 30x4 120 0.930

    Kg

    8.6

    50mm th. micro concreting in 1:1.5:3 (25mm th outer

    coat over 25mm th first coat)

    Column Beam Jacketing 21 2.744 1.240

    Beam Jacketing 3 23.880 0.930

    cub.m

    8.8 12.5 mm Plaster in 1:3 c/s

    Column Beam Jacketing 21 2.744 1.240

    Beam Jacketing 3 23.880 0.930

    Sq.m

    Sub Total

    Contengency @5% Sub Total

    Total

    Vat 13% of Total

    Grand Total including Contengency, Contractors

    Overhead and VAT

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    6/16

    Location : Bhadrabas, Kathmandu

    Type of Building : Load Bearing Wall, RCC Roof

    No. of Story : 3 (Three)

    S.N. Items Unit Quantity Unit Rate Total Amount Remarks

    1.1 Site Clearance and necessary arrangement for Works Ls 1.000 1000.00 1000.00

    1.2 Dismantling Works

    1.2.1 Demolition Works for RCC Slab Cub.m 11.621 4743.75 55125.22

    1.2.2 Demolition of Brick Masonary in Cement Mortar Cub.m 16.851 914.25 15405.62

    1.2.3 Removing of existing doors/windows nos 15.000 799.54 11993.10

    2

    Earth Work in Excavation for construction of beam below

    existing Ground level Outer Side Cub.m 97.747 355.35 34734.37

    2.1 Demolition of existing floor, excavation of earth anddisposing upto 30 meters Inner Side Cub.m 61.893 355.35 21993.76

    2.2 PCC (1:1.5:3) (M20) Work for beam Cub.m 22.130 11245.12 248849.59

    2.3 Formwork for beam Sq.m 92.183 798.29 73588.85

    2.4 Flat Brick Soling for Base of Beam Sq.m 159.246 579.59 92297.41

    2.5 Reinforcement bar for Beam Kg 4598.822 111.06 510745.17

    3 Earth Filling in Compaction Cub.m 137.511 506.63 69667.00

    3.1 Flat Brick soling works Sq.m 109.519 579.59 63476.03

    3.2 PCC 1:2:4 for floor Cub.m 10.434 9680.70 101011.72

    3.3 20 mm thick Screeding Works in 1:4 C/S Sq.m 136.899 310.76 42542.59

    3.4 3mm thick cement Puning in 1:1 C/S Sq.m 136.899 163.69 22408.92

    4.1 #REF! Cub.m #REF! #REF! #REF!

    4.2 #REF! Cub.m #REF! #REF! #REF!

    4.3 #REF! Sq.m #REF! #REF! #REF!

    4.4 #REF! Sq.m #REF! #REF! #REF!

    5 Wire Mesh jacketing

    5.1

    Scrappingof strong mortared plaster that con not be easily

    remove by hand tools without additional hammering, raking

    joint upto 10mm surface dressing etc. Sq.m 1362.258 175.09 238517.81

    5.2 4.75mm . Anchor bars @ 600mm/cc staggered nos 5000.000 49.32 246599.98

    5.3 4.75mm @150 mm c/c both way Torsteel Mesh Kg 1362.258 274.27 373626.59

    5.4

    50mm th. micro concreting in 1:1.5:3 (25mm th outer coat

    over 25mm th first coat) Cub.m 1362.258 752.39 1024949.54

    5.5 12.5 mm thk. Leveling plaster coat in 1:3 C/S Sq.m 1362.258 268.26 365439.42

    5.6 Two coat of weather coat paints over one cooat of primer Sq.m 1362.258 194.12 264441.59

    6 Construction of vertical/Horizontal Bands Ground Floor

    6.1

    Scrappingof strong mortared plaster that con not be easily

    remove by hand tools without additional hammering, raking

    joint upto 10mm surface dressing etc. Sq.m 1397.198 175.09 244635.34

    6.2 8mm dia Bars for Bands Kg 3113.301 111.06 345763.18

    6.3 12.5 mm thk. Leveling plaster coat in 1:3 C/S Sq.m 1397.198 268.26 374812.25

    6.4 Two coat of distemper over one coat of primer Sq.m 1397.198 106.30 148522.11

    6.5

    PCC 1:1.5:3 work concrete pocket for anchoring Vertical

    Bands Cub.m 1.980 11245.12 22265.34

    Seismic Vulnerability Assessment and Retrofit Design of School Building in KathmanduDistrict

    Ministry of Education

    Department of Education

    Sanothimi, Bhaktapur

    Name of the School: Adarsha Ma Vi

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    7/16

    7 Relocating existing doors/windows nos 4.000 1890.00 7560.00

    8 Two coat of white wah on Ceiling Surface Sq.m 702.707 22.43 15761.71

    9 Column, Footing & Beam Jacketing

    9.1 Earth work in Excavation for Footing of Column Cub.m 23.273 355.35 8270.06

    9.2 Reinforcement bar Kg 548.249 111.06 60888.55

    9.3 PCC 1:2:4 Cub.m 8.573 10246.01 87839.04

    9.4 Column Beam Jacketing (Steel) Kg 1146.334 117.50 134694.20

    9.5 Beam Jacketing (Steel) Kg 195.107 117.50 22925.08

    9.650mm th. micro concreting in 1:1.5:3 (25mm th outer coatover 25mm th first coat) Cub.m 138.079 752.39 103889.23

    9.7 12.5 mm Plaster in 1:3 c/s Sq.m 138.079 268.26 37041.06

    9.8

    Steel I- Beam support for Slab deflection Control with 4mm

    angle Plates, 10mm Bolt & Anchor rod weld with Plate and

    RCC Beam Kg 726.649 117.50 85381.30

    9.9 Two Coat Of Enamel Paints Sq.m 34.284 212.36 7280.55

    0.00

    0.00

    0.00

    Sub Total #REF!

    Contengency @ 5% & 15% Overhead of Sub Total #REF!

    Total #REF!

    Vat 13% of Total #REF!#REF!

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    8/16

    Rate in NRS 710.00 1,659.57 220.00

    Cement River Sand Back fillign soil

    Bag Cum Cum

    1.00 Earthwork

    Earthwork in backfilling with supply of soil Cum 1.05

    2.00 Flooring and Plaster works20mm thick plaster in 1:4 Sqm 0.162 0.022

    5.00 RCC Works

    5.01 P.C.C. M15 (1:2:4) Cum 6.00 0.45

    5.04 12mm thk plywood Formwork (can use upto 3 times) Sqm

    S.NO.Particulars Unit

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    9/16

    1,836.12 7.50 15.00 80.80 90.00 1,022.20 1,076.00 1,540 99

    Aggregate Local Brick Chimney Brick Reinfrmnt B. Wire 19mm W.plywd Flagstone Metal props Nails

    Cum Nos Nos Kgs Kg Sqm Sqm Nos Kgs

    0.89

    0.2475 0.0722 0.3651

    RATE ANALYSIS WITHOUT VAT

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    10/16

    24,696 2,205 Net Total 525 375 375 Net Total

    Sallo bit Brick bats Material S. Worker Labor Helper Labor T & P Scafold

    Cum Cum Amt. NRs Nos Nos Nos Amt. NRs 5% 5%

    231.00 0.70 262.50 13.13

    151.53 0.140 0.190 144.75 7.24 7.24

    6,640.95 0.50 3.50 1,575.00 1,464.75

    0.0036 488.75 0.27 0.41 294.80 14.74

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    11/16

    Total

    Mat.+Lbr Total Overhead

    15%

    506.63 75.99 582.62

    310.76 46.61 357.37

    9,680.70 1,452.11 11,132.81

    798.29 119.74 918.04

    Total Amount

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    12/16

    Rate in NRS 4,200.00 800.00

    epoxy 0.58kg 12mm drilling bit

    0.5kgs nos

    10 Drilling works

    10.1 Drilling holes 18mm x75mm screws at exisitng RCC

    foundation

    nos

    10.2 Drilling holes 12mm x75mm screws at exisitng RCC

    Columns

    nos 0.25

    10.3 Drilling holes 12mm x150mm screws at exisitng

    RCC Slab for extending jacketed column

    nos 0.25

    11 Grouting works

    11.1 Epoxy grouting in drilled holes in existing RCC

    foundation upto 75mm

    nos

    0.1

    11.2 Epoxy grouting in drilled holes in exisitng RCCcolumns upto 75mm

    nos0.08

    11.3 Epoxy grouting in drilled holes in exisitng RCC slabs

    for extending jacketed column

    nos

    0.08

    11.4 Bonding Lattex bond chemical to bond old & new

    concrete surface

    Sqm

    12 Dismantle works

    12.1 Dismantleing PCC parts Cum

    12.2 Dismantling/chipping off cement plaster work on

    concrete/wall surface Sqm

    12.3 Dismantling of exisitng brick work safely Cum

    12.4 Dismantling/relocating exisitng windows/Doors job

    12.5 Dismantling RCC/RBC Cum

    13 Roofing works

    13.1 Providing & fixing 50mm Dia black pipe truss Kgs

    13.2 Providing & fixing 1.2mm thk Corrugated/Plain fiber

    glass sheet over truss Sqm

    14 Wood works

    14.1 Salwood work in chukhat for D/W, holdfast, screws,

    holdfast concreting also Cum

    S.NO.

    Particulars Unit

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    13/16

    1,250.00 1,250.00 905.15 100.00 300.00 1,270.00

    18mm drilling bit Hi-bond chemical Lattex hi-bond chemical 50mm Black pipe Metal Primercorrugated/Pl

    ain fiber glass

    nos kgs kgs Kgs Ltrs kgs

    0.1

    0.95

    1 0.044

    1.2

    RATE ANALYSIS

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    14/16

    46.00 7.85 5.00 176,400.00 900.00 110.00 300.00 400.00 450.00 450.00

    8mm nut

    boltsJ hooks

    Bitumen

    washerSalwood Holdfast Screws Primer Enamel Int. Emulsion Weathercoat

    Nos Nos Nos Cum Nos Nos Ltrs Ltrs Ltrs Ltrs

    3 2.5 5.5

    1.1 92 184

    ITHOUT VAT

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    15/16

    Net Total 600.00 400.00 400.00Net Total

    Material Skilled Worker Labor Helper Labor Tools & Plants Scafolding

    Amount NRs Nos Nos Nos Amount NRs 5% 5%

    125.00 0.100 40.00 2.00 2.00

    200.00 0.100 40.00 2.00 2.00

    200.00 0.200 80.00 4.00 4.00

    -

    420.00 0.1 60.00 3.00 3.00

    336.00 0.1 60.00 3.00 3.00

    336.00 0.1 60.00 3.00 3.00

    859.89 0.25 1.000 550.00 27.50 27.50

    - -

    - 4.000 1,600.00

    - 0.108 43.20 2.16 2.16

    - 2.000 800.00 40.00 40.00

    - 1 3.000 1,800.00 90.00

    - 11.000 4,400.00

    - -

    113.20 0.04 0.050 44.00

    1,709.13 0.135 0.150 141.00

    297,080.00 34 3.4 21,760.00 165.18

  • 7/30/2019 Adarsha Ma. Vi. Final(Sept).xlsx

    16/16

    TotalTotal

    Amount

    Material+Lbr Total Overhead

    15%

    169.00 25.35 194.35

    244.00 36.60 280.60

    288.00 43.20 331.20

    - -

    486.00 72.90 558.90

    402.00 60.30 462.30

    402.00 60.30 462.30

    1,464.89 219.73 1,684.63

    - -

    1,600.00 240.00 1,840.00 279.68 Sqm

    47.52 7.13 54.65

    880.00 132.00 1,012.00

    1,890.00 283.50 2,173.50

    4,400.00 660.00 5,060.00

    - - -

    157.20 23.58 180.78

    1,850.13 277.52 2,127.64

    319,005.18 47,850.78 366,855.95