    PresentationPresentation

    onon

    Infrastructure & PowerInfrastructure & Power

    The 2nd Annual Euromoney India Europe Investment Forum

  • 8/9/2019 ADANI Presentation

    2/24

    2

    Safe Harbour

    Except for the historical information contained herein, statements in this presentation and the

    subsequent discussions, which include words or phrases such as will, aim, will likely

    result, would, believe, may, expect, will continue, anticipate, estimate, intend,

    plan, contemplate, seek to, future, objective, goal, likely, project, should,

    potential, will pursue and similar expressions or variations of such expressions may

    constitute "forward-looking statements". These forward-looking statements involve a number

    of risks, uncertainties and other factors that could cause actual results to differ materially

    from those suggested by the forward-looking statements. These risks and uncertainties

    include, but are not limited to our ability to successfully implement our strategy, our growth

    and expansion plans, obtain regulatory approvals, our provisioning policies, technological

    changes, investment and business income, cash flow projections, our exposure to market

    risks as well as other risks. The Company does not undertake any obligation to update

    forward-looking statements to reflect events or circumstances after the date thereof.

  • 8/9/2019 ADANI Presentation

    3/24

    3

    Adani Group

    2 Listed entities : Combined Market Cap of USD 9.3 Bn as of 26th June 08

    AEL MPSEZL

    PowerGeneration

    Energy

    RealEstate

    Agro

    Port SEZ

    ICDs Logistics

    Power : Thermal Power Plant - 9900 MW

    Realty: Commercial + Residential 38 Mn Sq. Ft.

    Energy: Oil & Gas Exploration 2 On Shore Blocks (Thailand) &

    2 On Shore Blocks (India) + City Gas Distribution + Mining

    Agro: Edible Oil Refinery, Grain Silos, CA Storage

    Port: Mundra Port & Dahej Port

    SEZ: Special Economic Zone - Mundra

    ICDs : Dry Port Network

    Logistics: Container Train Operations

  • 8/9/2019 ADANI Presentation

    4/244

    Port SectorPort Sector -- OverviewOverview

  • 8/9/2019 ADANI Presentation

    5/245

    Indian Ports

    Source: National Maritime Development Programme, Indian Ports Association, India infrastructure report

    ~55

    %

    ~45%

    CAGR : 11%

    CAGR: 9%

    Indian Ports growing at a CAGR of 11% for last 5 Years

    07-08 Total Cargo Handled ~ 704 mmt (Major: 519 mmt & Non

    Major: 185 mmt) YoY 11.9%

    Only 2 privately owned fully operational land lord ports:

    Mundra & Pipavav Cargo Handled 32.9 mmt (18%)

    Current Capacity 765 mmt Operating at 92%

    Existing Capacity Shortfall of 150 mmt

    Planned Capacity addition 1575 mmt by FY 2012

  • 8/9/2019 ADANI Presentation

    6/246

    Cargo at Indian Ports 2008

    Source: Individual Port Web Sites

    65 65

    57 57 57 56

    42

    36 3529

    2115

    12

    Kand

    la

    Viza

    g

    Kolka

    ta

    Chenna

    i

    Mumba

    iJNPT

    Para

    dip

    N.Ma

    nglore

    Mormug

    ao

    Mund

    ra

    Tutic

    orin

    Cochin

    Enno

    re

    mntonnes

    I II

    III IV

    V

    I II III IV V VI VII VIII IX X XI XII XIII

  • 8/9/2019 ADANI Presentation

    7/247

    Mundra PortMundra Port The Preferred DestinationThe Preferred Destination

    Deept Draft Multimodal Hinterland Connectivity Diversified Cargo Profile

    MUNDRA

    DAHEJ

  • 8/9/2019 ADANI Presentation

    8/248

    Mundra Port 1993 Mundra Port 2008

    Mundra Port Then and Now

  • 8/9/2019 ADANI Presentation

    9/249

    Mundra Port Connectivity :

    Not just Road

    also

    Rail, Air & Pipeline

  • 8/9/2019 ADANI Presentation

    10/2410

    Advantages

    Mundra Delhi vis a vis Mumbai - Delhi

    218 Km Distance Advantage

    With Bhildi Luni; Mundra vis a vis Mumbai

    from Bhatinda 438 Km

    Bhildi Luni Gauge Conversion expected to

    be completed by Mar 09

    Double stacking on trains from Mundra

    Mundra Port: Rail Linkage

  • 8/9/2019 ADANI Presentation

    11/2411

    SPM - Crude and POL Pipe Line Network

    Mathura

    Guwahati

    HaldiaKoyaliKandla

    Bhatinda Panipat

    Barauni

    Viramgam

    Digboi

    Chaksu

    Sidhpur

    Bina

    NaharkatiaNumaligarh

    Bongaigaon

    Katihar

    Mundra

    ParadipMumbai

    BombayHigh

    Heera

    Navagan

    Ankleshwar

    IOCL Crude Pipe Line From Mundra to PanipatHPCL Mundra - Delhi Product Pipe - Line

    HPCL Proposed Crude Pipeline

    Barmer

    Mundra Port emerging as the Port Hub for Oil and Gas Industry

    Delhi

    IOCLs earlier Crude Pipe Line From Vadinar toMathura Panipat

    Single Point Mooring

  • 8/9/2019 ADANI Presentation

    12/24

    12

    Mundra Port: Air Connectivity

    Private Commercial Airport A Reality in Making

  • 8/9/2019 ADANI Presentation

    13/24

    13

    Terminal 1 & 2: 8 cargo berths & 1 barge berth - handling both dry & liquid bulk

    Mechanised System for cargo handling: Storage ~ 800,000 sq.mts. ; 342,000 Kilo Ltrs liquid storage

    Container Terminal 1: Two berths Capacity 1.25 million TEUs p.a

    Container Terminal 2: Two berths Capacity 1.25 million TEUs p.a; capable of handling Car Exports

    Single Point Mooring: Panipat refinery being expanded to 15MT from 12 MT by June 2009.

    Marine Operations: 8 Tugs for marine operations ;

    Railway facilities: For bulk & container cargo

    Storage Facility: Bulk 8 Lac Sq. mtrs of Open Storage & 1.37 Lac Sq. mtrs Closed Warehouse & 81

    Tanks Farms with capacity of 3.45 Lac Kilo Litres

    Facilities

    BULK (DRY & LIQUID) 8 Berths CONTAINER 4 Berths CRUDE 1 SPM

    Effective handling capacity of about 50 55 Mn Tons

  • 8/9/2019 ADANI Presentation

    14/24

    14

    Container

    29%

    C rude Oil

    24%

    M etals &

    M inera l

    12%

    Fertil iser7%

    C o a l

    14%

    Foodgrain

    6%

    Liquid

    2%P OL

    6%

    Highlights 2007-0807- 08

    Total Volume: 28.8 mmt

    *Figures in brackets for the year 06-07

    Revenue Rs. 846 Crs (Rs. 587 Crs)*; YoY : 44.1%

    EBIDTA Rs. 562 Crs (Rs. 319 Crs)*; YoY : 76.3%

    EBIDTA Margin 66.4% (54.2%)*

    PBT Rs 355 Crs (Rs 175 Crs)*; YoY : 103.0%

    Tax provision Rs. 149 Crs Incl. Deferred Tax of Rs 130 Crs

    (Rs. -12 Crs due to reversal of deferred tax)*

    PAT Rs. 213 Crs (Rs.187 Crs)* ; YoY : 13.9%

    EPS (Post IPO on fully diluted basis) Rs. 5.69 (Rs. 5.20)*

  • 8/9/2019 ADANI Presentation

    15/24

    15

    Power : Sector OverviewPower : Sector Overview

  • 8/9/2019 ADANI Presentation

    16/24

    16

    Overview Indian Power Sector & Availability of Coal Reserves

    India: 5th Largest Electricity Producer & 7th Largest Consumer But Lowest Per Capita Consumption

    Total Generation Capacity : 1,41,500 MW (Central: 33% ; State 53% ; Private 14%)

    Consumers : Industry 35.6%; Domestic 25.8% ; Agriculture 22.4%

    Transmission & Distribution Loss as of 2005-06 : 34.54%

    Coal continues to play important role in the energy mix for India

    Around 68% of the capacity addition in the XI Plan to be through Coal as a primary fuel

    India enjoys worlds third largest coal reserves ; ~ 287 Bn Tonnes as of Jan 07

    Source: CEA, Power Scenario at a Glance, Mar. 08 & www.eia.doe.gov

  • 8/9/2019 ADANI Presentation

    17/24

    17

    Power Potential on Hand

    Investments Required:

    USD 270 Bn Investment Required for achieving the target set for 2012 (Power for All):

    Generation : USD 160 Bn

    Transmission & Distribution : USD 100 Bn

    Renovation & Modernization : USD 10 Bn

    As per planning commission additional capacity required 85 98 GW by 2012 & about 290 353 GW by

    2022

    Average capacity addition target achieved for last 10 Five Year Plans ~ 66%

    Plan to Replicate in next 5 Yrs more than what has been accomplished in last 25 Years

  • 8/9/2019 ADANI Presentation

    18/24

    18

    Indian Power Sector : Under - Served

    18408

    14240

    8459 82317442

    6756 6425

    23401684

    618

    Canada United

    States

    Japan France Germany UK Russia Brazil China India

    Lowest Per Capita Consumption

    8%

    12%

    9%

    13%

    0%

    2%

    4%

    6%

    8%

    10%

    12%

    14%

    End 9th Plan (1997-2002) End 10th Plan (2002 - 2007)

    Energy Shortage Peak Shortage

    Increasing Shortage Over Yrs

    Target Per Capita Consumptionof 1000 Kwh by 2012

    Installed Capacity

    India China

    Population

    140 GW 622 GW

    1.134 Bn 1.313 Bn

    Capacity added in last 7 Yrs 303 GW30 GW

  • 8/9/2019 ADANI Presentation

    19/24

    19

    9,900 MW by 2012 13 : Integrated in Power Sector Value Chain

    Disclaimer Clause:

    Adani Power Limited is proposing subject to receipt of requisite approvals, market conditions and certain other consideration, a public issue of its equity shares and has filed a Draft Red

    Herring Prospectus with the Securities and Exchange Board of India. A copy of the Draft Red Herring Prospectus is available on the website of Adani Power Limited at

    www.adanipower.com, on the website of Securities and Exchange Board of India at www.sebi.gov.in and the website of Global Co-Ordinator and Book Running Lead Manager at

    www.dspml.com and the respective websites of Book Running Lead Managers at www.enam.com, www.sbicaps.com, www.icicisecurities.com, www.sski.co.in, www.jmfinancial.in,

    www.kotak.com and www.morganstanley.com. This presentation is not an offer of equity shares or any other security of Adani Power Ltd., for sale in the United States. Any equity

    shares or other security of Adani Power Limited may not be offered or sold in the United States absent registration under applicable U.S. Securities laws or an exemption from

    registration requirements under such laws. The proposed offering of equity shares has not been and will not be registered under United States Securities Act of 1933, as amended (the

    Act), and accordingly any offer or sale of these securities may be made only in reliance on an available exemption from, or in a transaction not subject to, the registration requirements

    of the Act.

    Adani Group Forays into Power

  • 8/9/2019 ADANI Presentation

    20/24

    20

    Rationale For Entry into Thermal Power Generation

    Power TradingCoal TradingShip

    Owning

    PowerGeneration Transmission

    Exclusive Mining

    Contracts in

    Indonesia

    Mining Blocks -

    in India

    One of the largest

    trader of coal in India

    Importing 7.24 mMT

    during FY 2007

    2 capesize

    vessels

    ordered

    to be

    delivered by

    2010

    Thermal Power Plants:

    4620 MW : Mundra

    1980 MW : Tiroda

    1980 MW : Dahej

    1320 MW : Kawai

    Third largest

    power trader in

    India for FY 07,

    1.84 Bn Units

    Traded

    Mundra:

    413 Kms 400 KV DC

    Tiroda:

    225 Kms 400 KV DC

    140 Kms 400 KV DC

    Dahej:

    75 Kms 220 KV DC

    275 Kms 400 KV DC

    Kawai:

    100 Kms 400 KV DC

    200 Kms 400 KV DC

    Coal Mining

    http://images.google.co.in/imgres?imgurl=http://www.coaltrade.org/images/hillcoal.GIF&imgrefurl=http://www.coaltrade.org/Fundamentals%2520of%2520Coal%2520Trading.htm&h=355&w=534&sz=25&hl=en&start=8&um=1&tbnid=gZj-i2vv8yHk3M:&tbnh=88&tbnw=132&prev=/images%3Fq%3Dcoal%2Btrading%26svnum%3D10%26um%3D1%26hl%3Den%26cr%3DcountryIN%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://www.wsn.org/transmission_line/powerline2a_smallglow.JPG&imgrefurl=http://www.wsn.org/transmission_line/index.html&h=458&w=369&sz=47&hl=en&start=6&tbnid=a_fMYf_pfj8nQM:&tbnh=128&tbnw=103&prev=/images%3Fq%3Dtransmission%2Bline%2B%26gbv%3D2%26svnum%3D10%26hl%3Den%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://www.wsn.org/transmission_line/powerline2a_smallglow.JPG&imgrefurl=http://www.wsn.org/transmission_line/index.html&h=458&w=369&sz=47&hl=en&start=6&tbnid=a_fMYf_pfj8nQM:&tbnh=128&tbnw=103&prev=/images%3Fq%3Dtransmission%2Bline%2B%26gbv%3D2%26svnum%3D10%26hl%3Den%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://www.wsn.org/transmission_line/powerline2a_smallglow.JPG&imgrefurl=http://www.wsn.org/transmission_line/index.html&h=458&w=369&sz=47&hl=en&start=7&tbnid=a_fMYf_pfj8lQM:&tbnh=128&tbnw=103&prev=/images%3Fq%3Dtransmission%2Bline%26gbv%3D2%26svnum%3D10%26hl%3Den%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://www.coaltrade.org/images/hillcoal.GIF&imgrefurl=http://www.coaltrade.org/Fundamentals%2520of%2520Coal%2520Trading.htm&h=355&w=534&sz=25&hl=en&start=8&um=1&tbnid=gZj-i2vv8yHk3M:&tbnh=88&tbnw=132&prev=/images%3Fq%3Dcoal%2Btrading%26svnum%3D10%26um%3D1%26hl%3Den%26cr%3DcountryIN%26sa%3DG
  • 8/9/2019 ADANI Presentation

    21/24

    21

    Kawai

    1320 MW

    Mundra4620 MW

    1980 MWDahej

    Tiroda 1980 MW

    Projects An Overview

  • 8/9/2019 ADANI Presentation

    22/24

    22

    Location

    Mundra

    (4620 MW)

    Ph I: 660 MWPh II: 660 MWPh III: 1320 MWPh IV: 1980 MW

    Land in Possession Sea WaterAgreement signedwith AEL

    (Backed by Mining

    Contracts)

    PPA done for 2000 MW with

    Gujarat State Utility

    &

    Submitted bid to Haryana State

    Utility : 1425 MW

    Tiroda(1980 MW)

    Plant Land in Possession

    +

    Applied for additional Land

    River Water Coal Mine allocated

    at Lohara West &

    Extension for 1000

    MW

    Submitted bid to Maharashtra

    State Utility : 1420 MW

    Dahej(1980 MW) Applied For

    Sea Water & River

    Water

    Agreement signed

    with AEL

    (Backed by Mining

    Contracts)

    Long Term PPAs & Merchant

    Sales to be arranged.

    Kawai(1320 MW)

    Applied For & MOU with

    AEL for Govt. Support

    River WaterMOU signed with

    Rajasthan Govt.*

    Land WaterOff take

    Key Project Components - Status

    Fuel Supply

    *In terms of the MOU the Rajasthan Government will use best possible efforts to facilitate the provision of coal.

    http://images.google.co.in/imgres?imgurl=http://www.ga.gov.au/education/facts/images/farm.jpg&imgrefurl=http://www.ga.gov.au/education/facts/tenure.htm&h=672&w=630&sz=109&hl=en&start=1&tbnid=Xz5DigLm52f4NM:&tbnh=138&tbnw=129&prev=/images%3Fq%3Dland%26gbv%3D2%26hl%3Den%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://dnrc.mt.gov/wrd/water_proj/hydro/Tostondam.jpg&imgrefurl=http://dnrc.mt.gov/wrd/water_proj/hydro/hydropower.asp&h=450&w=600&sz=79&hl=en&start=17&tbnid=TZ_cbzthGZSyBM:&tbnh=101&tbnw=135&prev=/images%3Fq%3Dpower%2Bproject%2Bland%26gbv%3D2%26hl%3Denhttp://images.google.co.in/imgres?imgurl=http://www.wsn.org/transmission_line/powerline2a_smallglow.JPG&imgrefurl=http://www.wsn.org/transmission_line/index.html&h=458&w=369&sz=47&hl=en&start=6&tbnid=a_fMYf_pfj8nQM:&tbnh=128&tbnw=103&prev=/images%3Fq%3Dtransmission%2Bline%2B%26gbv%3D2%26svnum%3D10%26hl%3Den%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://www.wsn.org/transmission_line/powerline2a_smallglow.JPG&imgrefurl=http://www.wsn.org/transmission_line/index.html&h=458&w=369&sz=47&hl=en&start=6&tbnid=a_fMYf_pfj8nQM:&tbnh=128&tbnw=103&prev=/images%3Fq%3Dtransmission%2Bline%2B%26gbv%3D2%26svnum%3D10%26hl%3Den%26sa%3DGhttp://images.google.co.in/imgres?imgurl=http://dnrc.mt.gov/wrd/water_proj/hydro/Tostondam.jpg&imgrefurl=http://dnrc.mt.gov/wrd/water_proj/hydro/hydropower.asp&h=450&w=600&sz=79&hl=en&start=17&tbnid=TZ_cbzthGZSyBM:&tbnh=101&tbnw=135&prev=/images%3Fq%3Dpower%2Bproject%2Bland%26gbv%3D2%26hl%3Denhttp://images.google.co.in/imgres?imgurl=http://www.ga.gov.au/education/facts/images/farm.jpg&imgrefurl=http://www.ga.gov.au/education/facts/tenure.htm&h=672&w=630&sz=109&hl=en&start=1&tbnid=Xz5DigLm52f4NM:&tbnh=138&tbnw=129&prev=/images%3Fq%3Dland%26gbv%3D2%26hl%3Den%26sa%3DG
  • 8/9/2019 ADANI Presentation

    23/24

    23

    Projects Funding Arrangement

    Particulars Rs Crs

    Total Project Cost 43,139

    Debt 34,504

    Debt Tied Up 27,316

    Balance Debt Required 7,188

    Equity 8,635

    Equity Brought In 1,800

    Balance Equity Required 6,835

  • 8/9/2019 ADANI Presentation

    24/24

    24

    Thank YouThank You