Adam Airbase Package 2 Facts Project Description Construction of parallel taxiway, apron, substation, airfield lighting, sunshade for typhoon City/Country Client Ministry of Defence, Muscat Contract Value € 52,08 Mio. Construction Period 11/2014 - 05/2016 (18 Months) .
1

Adam Airbase Package 2 - STRABAG International...Adam Airbase Package 2 Facts Project Description Construction of parallel taxiway, apron, substation, airfield lighting, sunshade for

Feb 16, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Adam Airbase Package 2

    Facts Project DescriptionConstruction of parallel taxiway, apron, substation, airfield lighting, sunshade for typhoon

    City/Country

    Client

    Ministry of Defence, Muscat

    Contract Value

    € 52,08 Mio.

    Construction Period

    11/2014 - 05/2016 (18 Months)

    .