-
ACTIVE 2018-2021 STIPSTATEWIDE TRANSPORTATION IMPROVEMENT
PROGRAM
ACTIVE STIPPRINTED7/6/2018
For information on projects included in this document, please
contact ODOT at
https://www.oregon.gov/ODOT/TD/STIP/Pages/STIPDocs.aspx#2018-2021_STIP
O R E G O N D E P A R T M E N T O F T R A N S P O R T A T I O
N
http://www.oregon.gov/odot/Pages/index.aspx
-
2018-2021 Active STIP CLACKAMAS
Name: Clackamas County Regional Freight ITS Key: 18001
Description Improves the reliability of the regional freight
system by reducing freight delays in known congested areas through
a variety of ITC system enhancements.
Region: 1
MPO: Portland Metro MPO Work Type: OP-ITS
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2020 2014
Total $347,199.00 $1,699,120.00 $204,879.00 $2,251,198.00
Fund 1 ACP0 $311,541.66 M230 $954,458.91 M230 $89,621.43
Match $35,657.34 $109,242.09 $10,257.57
Fund 2 L230 $570,161.47 L23E $51,097.02
Match $65,257.53 $5,849.00
Fund 3 L230 $43,118.98
Match $4,935.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0149 Approval
Date: 10/30/2017
Requested Action: Slip CN to 2019. Update name and description
to match MTIP.
2018-2021 Active STIP CLACKAMAS
Name: SMART Employer Outreach Program 2013 Key: 18119
Description Travel options including vanpooling, riding transit,
bicycling, walking and telecommuting. Region: 1
MPO: Portland Metro MPO Work Type: TR-OPS
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
0.00 REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $79,000.00 $79,000.00
Fund 1 Z230 $70,887.00
Match $8,113.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0087 Approval
Date: 10/31/2017
Requested Action: Slip the OT phase to 2018
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 2 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: US26: SE 282nd Ave (Boring Rd) Oxing Key: 18583
Description Increase the clearance on US26 under the SE 282nd
Ave (Boring Rd) Structure (Bridge no. 09381) and perform joint and
deck work on the structure.
Region: 1
MPO: Portland Metro MPO Work Type: BRIDGE, PRESRV
Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
17.52 to 17.58 0.06 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2015 2017 2018 2018
Total $1,095,000.00 $608,000.00 $3,028,339.02 $50,000.00
$4,781,339.02
Fund 1 M001 $982,544.00 M240 $384,044.40 Z001 $2,715,085.35 S010
$50,000.00
Match $112,456.00 $43,955.60 $310,753.67
Fund 2 Z231 $161,514.00 OTH0 $2,500.00
Match $18,486.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0373 Approval
Date: 12/28/2017
Requested Action:Add an OT phase of $50,000 by reducing CN to
$4,655,000 and adding $15,000 from Region 1 Reserves.
2018-2021 Active STIP CLACKAMAS
Name: OR99E RAILROAD TUNNEL ILLUMINATION AND ITS Key: 18759
Description Upgrade the illumination systems of the roadway and
pedestrian tunnels that pass under the railroad. Install a Variable
Message Sign (VMS) south of the tunnel.
Region: 1
MPO: Portland Metro MPO Work Type: OP-SSI
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
12.60 to 12.65 0.05 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2018
Total $453,000.00 $1,487,000.00 $1,940,000.00
Fund 1 Z240 $406,477.00 ACP0 $1,334,285.00
Match $46,523.00 $152,715.00
Footnote: $1,940,000 Total R1 Ops funding
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 3 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: OR99E:Rockfall - Oregon City Tunnel to Old Canemah Park
Key: 18769
Description Inspect and repair mesh. Scale slope behind mesh
removing loose rock and vegetation. Rock bolting as needed and
clear catchment area / roadside ditch
Region: 1
MPO: Portland Metro MPO Work Type: OP-SLD
Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
12.62 to 12.87 0.25 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
13.15 to 13.36 0.21 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
13.82 to 14.06 0.24 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2018 2018
Total $391,000.00 $1,772,999.34 $200,000.00 $2,363,999.34
Fund 1 Z240 $350,844.30 Z240 $1,590,912.31 S010 $200,000.00
Match $40,155.70 $182,087.03
Fund 2
Match
Footnote: $1,889,000 Total R1 Operations funding
Most Recent Amendment ApprovedAmendment No: 18-21-0709 Approval
Date: 2/15/2018
Requested Action:Update the project name to OR99E:Rockfall -
Oregon City Tunnel to Old Canemah Park. Update project location
mile points from 13.82-14.06 to 13.15-13.36.
2018-2021 Active STIP CLACKAMAS
Name: OR212: SE Richey Rd - US26 Key: 18772
Description Paving of the highway in conjunction with targeted
deeper pavement repairs within the project limits. Missing or
non-compliant ADA sidewalk ramps will be brought up to standard.
Drainage and storm water treatment improvements may be required.
Culvert at Deep Creek to be replaced.
Region: 1
MPO: Portland Metro MPO Work Type: OPERAT, PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
6.85 to 8.87 2.02 OR-212 CLACKAMAS-BORING REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2015 2018 2018 2019
Total $1,480,591.00 $306,500.00 $150,000.00 $3,037,000.00
$4,974,091.00
Fund 1 ACP0 $628,110.00 Z002 $248,152.80 Z001 $134,595.00 ACP0
$2,725,100.10
Match $71,890.00 $28,402.20 $15,405.00 $311,899.90
Fund 2 Z001 $459,050.60 ACP0 $26,869.65
Match $52,540.40 $3,075.35
Fund 3 L05E $241,374.00
Match $27,626.00
Footnote: $3,124,091 Total R1 Preservation funds, $700,000
HB2017 and $1,150,000 R1 Operations
Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval
Date: 5/14/2018
Requested Action:Increase the Right of Way phase estimate by
$76,500, moving funds from project key 18780. Add a Utility
Relocation phase, using savings from the region 1 fix-it
program.
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 4 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: OR99E: S Pine St - SW Berg Parkway (Canby) Key: 18775
Description Repave this section of highway, replace signs,
signal loops, install pedestrian push buttons and construct
sidewalk curb ramps. Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
20.60 to 21.86 1.26 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2015 2021 2021
Total $894,555.01 $177,000.00 $5,036,000.00 $6,107,555.01
Fund 1 Z231 $533,494.21 ACP0 $158,822.10 ACP0 $4,518,802.80
Match $61,060.80 $18,177.90 $517,197.20
Fund 2 M231 $269,190.00
Match $30,810.00
Footnote: $300,000 Preservation, $594,555 R1 Shelf Ready and
$5,213,000 HB2017
Most Recent Amendment ApprovedAmendment No: 18-21-0900 Approval
Date: 4/19/2018
Requested Action:Add the project to the 2018-2021 STIP. Add
Right of Way and Construction phases.
2018-2021 Active STIP CLACKAMAS
Name: S Ivy Street (Canby) Key: 18805
Description Construct sidewalks and bike lane on S Ivy Street
between OR-99E and Lee Elementary School and install a signal at
the intersection with Township Road.
Region: 1
MPO: Non-MPO Work Type: BIKPED
Applicant: CITY OF CANBY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2017 2019 2020
Total $293,000.00 $211,000.00 $1,684,806.00 $2,188,806.00
Fund 1 Z302 $234,400.00 ACP0 $168,800.00 ACP0 $1,347,845.00
Match $58,600.00 $42,200.00 $336,961.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0601 Approval
Date: 1/25/2018
Requested Action: Slip RW to 2019 and CN to 2020
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 5 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: Boones Ferry Rd: Oakridge Rd/Reese Rd - Madrona St Key:
18809
Description Full reconstruction of Boones Ferry Road from south
of Madrona Street to north of Reese Road/Oakridge Road. Crosswalks,
signals, pedestrian signals, sidewalks, planter strips and a median
with stormwater treatment. Left turn lanes on side streets.
Region: 1
MPO: Portland Metro MPO Work Type: OPERAT
Applicant: CITY OF LAKE OSWEGO Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2015 2016 2018
Total $4,723,657.01 $5,300,000.00 $22,590,000.00
$32,613,657.01
Fund 1 LZ2E $2,507,076.86 OTH0 $4,074,100.08 OTH0
$22,590,000.00
Match $286,946.17
Fund 2 OTH0 $1,491,739.03 ACP0 $1,100,000.00
Match $125,899.92
Fund 3 Z030 $392,923.14
Match $44,971.81
Footnote: Total Federal Award of $4M Enhance Funds
Most Recent Amendment ApprovedAmendment No: 18-21-1068 Approval
Date: 6/20/2018
Requested Action: Increase the Construction phase estimate by
$2,900,000 in local funds.
2018-2021 Active STIP CLACKAMAS
Name: OR211: OR213 - S Ona Way (Molalla) Key: 18811
Description Construct a 6ft shoulder and sidewalk on the north
side of OR211. Remove ditches. Install inlets and storm pipe.
Relocation of utilities and replace culvert and guardrail at Bear
Creek.
Region: 1
MPO: Non-MPO Work Type: BIKPED
Applicant: CITY OF MOLALLA Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
11.47 to 11.89 0.42 OR-211 WOODBURN/ESTACADA REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2015 2019 2019 2019
Total $800,000.00 $139,204.00 $30,000.00 $1,893,359.00
$2,862,563.00
Fund 1 M240 $462,943.99 ACP0 $80,416.92 OTH0 $30,000.00 ACP0
$1,661,574.00
Match $52,986.01 $9,204.08 $190,175.00
Fund 2 M2E1 $228,976.22 OTH0 $49,583.00 OTH0 $41,610.00
Match $35,766.78
Fund 3 OTH0 $19,327.00
Match
Footnote: $1,683,911 Fed Enhance funds and $750,000 HB2017
funds
Most Recent Amendment ApprovedAmendment No: 18-21-0547 Approval
Date: 12/31/2017
Requested Action:Add $750,000 to the CN phase. Slip RW, UR and
CN to 2019.
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 6 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: Sandy transit operations center phase II bus barns Key:
18821
Description Construct Bus Barns. Region: 1
MPO: Non-MPO Work Type: TRANST
Applicant: CITY OF SANDY Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $570,000.00 $570,000.00
Fund 1 Z231 $510,000.00
Match $58,372.00
Fund 2 OTH0 $1,628.00
Match
Footnote:
Most Recent Amendment ApprovedAmendment No: 15-18-2865 Approval
Date: 9/19/2017
Requested Action: Slip the OT phase to 2018
2018-2021 Active STIP CLACKAMAS
Name: US26: Ten Eyck Rd/Wolf Dr - Vista Loop (Sandy) Key:
18823
Description Construct sidewalks and widen pavement for bike
lanes. Install street lighting and landscaping. Region: 1
MPO: Non-MPO Work Type: BIKPED
Applicant: CITY OF SANDY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
24.60 to 25.50 0.90 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2019 2020
Total $273,687.00 $400,000.00 $1,573,702.00 $2,247,389.00
Fund 1 M002 $245,579.35 ACP0 $341,573.40 ACP0 $1,331,967.37
Match $28,107.65 $39,094.60 $152,449.63
Fund 2 OTH0 $19,332.00 OTH0 $89,285.00
Match
Footnote: $1,919,119 Federal MTEP
Most Recent Amendment ApprovedAmendment No: 18-21-0537 Approval
Date: 12/31/2017
Requested Action: Slip RW to 2019 and CN to 2020
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 7 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: US26: Beaver Creek Culvert Repair Key: 18999
Description Repair 2 culverts Region: 1
MPO: Non-MPO Work Type: CULVRT
Applicant: ODOT Status: PROJECT UNDER CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
28.30 to 28.33 0.03 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2017 2018 2018
Total $242,000.00 $20,000.00 $462,200.09 $125,000.00
$849,200.09
Fund 1 M2E2 $217,146.60 M2E2 $17,946.00 Z232 $414,732.14 S010
$125,000.00
Match $24,853.40 $2,054.00 $47,467.95
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0759 Approval
Date: 2/9/2018
Requested Action: Reduce the Construction phase by $125,000 and
move the funds to create an Other phase.
2018-2021 Active STIP CLACKAMAS
Name: Jennings Ave: OR99E to Oatfield Rd Key: 19276
Description Construct a curb tight sidewalk on the north side of
the road and bike lanes on both sides of the road. Region: 1
MPO: Portland Metro MPO Work Type: BIKPED
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2017 2019 2020
Total $650,000.00 $450,000.00 $2,940,213.00 $4,040,213.00
Fund 1 Z230 $583,245.00 ACP0 $403,785.00 ACP0 $2,638,253.12
Match $66,755.00 $46,215.00 $301,959.88
Fund 2
Match
Footnote: $3,625,283 Federal STP funds
Most Recent Amendment ApprovedAmendment No: 18-21-0622 Approval
Date: 2/12/2018
Requested Action:Slip the Right of Way phase to federal fiscal
year 2019 and the Construction phase to federal fiscal year 2020
for delivery.
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 8 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SE 129th Avenue - bike lane and sidewalk project Key:
19280
Description Construct sidewalk and add bike lanes Region: 1
MPO: Portland Metro MPO Work Type: BIKPED
Applicant: CITY OF HAPPY VALLEY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2019 2020
Total $895,007.02 $100,000.00 $2,806,000.00 $3,801,007.02
Fund 1 M301 $435,612.90 ACP0 $89,730.00 ACP0 $2,212,830.92
Match $49,857.85 $10,270.00 $253,268.08
Fund 2 M3E1 $364,647.23 OTH0 $339,901.00
Match $41,735.51
Fund 3 35B0 $2,829.66
Match $323.87
Footnote: $1,366,918 Federal TAP-Urban and $1,738,727 STP-Urban
award
Most Recent Amendment ApprovedAmendment No: 18-21-0623 Approval
Date: 2/12/2018
Requested Action:Slip the Right of Way phase to federal fiscal
year 2019 and the Construction phase to federal fiscal year 2020
for delivery.
2018-2021 Active STIP CLACKAMAS
Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT
2016 Key: 19305
Description 5307 Funds for Preventative Maintenance, Associated
Improvements and Bus Fleet Replacement FY16 Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $550,000.00 $550,000.00
Fund 1 FF91 $440,000.00
Match $110,000.00
Footnote: 5307 Funds
Most Recent Amendment ApprovedAmendment No: 15-18-2820 Approval
Date: 9/15/2017
Requested Action: Slip to 2018
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 9 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT
2017 Key: 19306
Description 5307 Funds for Preventative Maintenance, Associated
Improvements and Bus Fleet Replacement FY17 Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $510,644.00 $510,644.00
Fund 1 FF94 $408,515.20
Match $102,128.80
Footnote: 5307 Funds
Most Recent Amendment ApprovedAmendment No: 15-18-2821 Approval
Date: 9/18/2017
Requested Action: Slip to 2018
2018-2021 Active STIP CLACKAMAS
Name: SMART ASSOCIATED IMPROVEMENTS & PREVENTATIVE MAINT
Key: 19307
Description 5307 Funds for Preventative Maintenance, Associated
Improvements and Bus Fleet Replacement FY18 Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $625,000.00 $625,000.00
Fund 1 FF91 $500,000.00
Match $125,000.00
Footnote: $500,000.00 Federal 5307 Funds
Most Recent Amendment ApprovedAmendment No: 15-18-136 Approval
Date: 7/10/2015
Requested Action: Name and description change.
2018-2021 Active STIP CLACKAMAS
Name: 5307 FY18 ASSOCIATED TRANSIT IMPROVEMENTS (1%) Key:
19312
Description 1% Of Sec 5307 Appropriations For Transit Amenities
Improvements Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $6,250.00 $6,250.00
Fund 1 FF91 $5,000.00
Match $1,250.00
Footnote: $5,000 Federal 5307 funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 10 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: 5310 FY16 - Senior & Disabled Key: 19314
Description Services & Facility Improvements for Elderly
& Disabled Customers FY16 Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $20,008.00 $20,008.00
Fund 1 F160 $16,006.00
Match $4,002.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0636 Approval
Date: 4/30/2018
Requested Action:Slip project to federal fiscal year 2018 for
delivery and add project to the 2018-2021 STIP. Reduce project cost
by $20,112 to match final federal award of $16,006 per 1/27/17
award letter.
2018-2021 Active STIP CLACKAMAS
Name: 5310 FY17 - Senior & Disabled Key: 19315
Description Services & Facility Improvements for Elderly
& Disabled Customers FY17 Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $20,636.00 $20,636.00
Fund 1 F160 $16,509.00
Match $4,127.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0637 Approval
Date: 4/30/2018
Requested Action:
Slip project to federal fiscal year 2018 for delivery and add
project to the 2018-2021 STIP. Reduce project cost by $22,828 to
match final federal award of $16,509 per 2/13/17 & 12/14/17
award letters.
2018-2021 Active STIP CLACKAMAS
Name: 5310 FY18 - SENIOR & DISABLED Key: 19316
Description Services & Facility Improvements for Elderly
& Disabled Customers FY18 Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $45,693.00 $45,693.00
Fund 1 F160 $36,554.40
Match $9,138.60
Footnote: $41,000 Federal 5310 funds (89.73 match)
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 11 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: 5339 FY15 - Bus and bus facilities (capital) Key:
19318
Description Bus and bus facility upgrades (FY15) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $57,045.00 $57,045.00
Fund 1 FF30 $45,636.00
Match $11,409.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0490 Approval
Date: 1/26/2018
Requested Action: Update project funding to reflect FTA
award.
2018-2021 Active STIP CLACKAMAS
Name: 5339 FY16 - Bus and bus facilities (capital) Key:
19319
Description Bus and bus facility upgrades (FY16) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $54,417.50 $54,417.50
Fund 1 FF30 $43,534.00
Match $10,883.50
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0491 Approval
Date: 1/26/2018
Requested Action: Update project funding to reflect FTA
award.
2018-2021 Active STIP CLACKAMAS
Name: 5339 FY17 - BUS AND BUS FACILITIES (CAPITAL) Key:
19320
Description Bus and Bus Facility Upgrades (FY17) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $81,250.00 $81,250.00
Fund 1 FF30 $65,000.00
Match $16,250.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 15-18-2844 Approval
Date: 9/19/2017
Requested Action: Slip other phase to 2018
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 12 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: 5339 FY18 - BUS AND BUS FACILITIES (CAPITAL) Key:
19321
Description Bus and Bus Facility Upgrades (FY18) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $87,500.00 $87,500.00
Fund 1 FF30 $70,000.00
Match $17,500.00
Footnote: $70,000 Federal 5339 award
2018-2021 Active STIP CLACKAMAS
Name: PORTLAND TO MILWAUKIE LIGHT RAIL (FY18) Key: 19350
Description This project extends light rail from PSU in downtown
Portland to Milwaukie and north Clackamas County. It includes a
multi-modal bridge carrying light rail, streetcar, buses, bicycles
and pedestrians.
Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS, MULTNOMAH
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $200,000,000.00 $200,000,000.00
Fund 1 FF31 $100,000,000.00
Match $100,000,000.00
Footnote: $100,000,000 Federal 5309 Funds
2018-2021 Active STIP CLACKAMAS
Name: SUNRISE SYSTEM: INDUSTRIAL AREA FREIGHT ACCESS Key:
19354
Description Funding for a new two-lane state highway to provide
freight access to the Clackamas Industrial Area and a multiuse path
connecting to the I-205 multiuse path
Region: 1
MPO: Portland Metro MPO Work Type: MODERN
Applicant: CLACKAMAS COUNTY Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $9,213,195.00 $9,213,195.00
Fund 1 M230 $8,267,000.00
Match $946,195.00
Footnote:
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 13 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: OR212: Rock Creek - Richey Rd Key: 19355
Description Pavement repair and resurfacing. Sidewalk corner
ramp upgrades to current standards. Region: 1
MPO: Portland Metro MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
0.30 to 6.85 6.55 OR-212 CLACKAMAS-BORING REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2018 2019
Total $1,364,795.00 $173,314.00 $5,334,287.00 $6,872,396.00
Fund 1 ACP0 $495,125.65 ACP0 $128,596.00 Z001 $4,195,444.00
Match $56,669.35 $14,718.00 $480,187.00
Fund 2 L050 $448,650.00 Z001 $26,919.00 ACP0 $591,012.00
Match $51,350.00 $3,081.00 $67,644.00
Fund 3 Z002 $280,854.90
Match $32,145.10
Footnote: $5,661,945 Total R1 Preservation funds and $1,210,451
HB2017 funds
Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval
Date: 5/14/2018
Requested Action:Increase the Right of Way phase estimate by
$143,314, moving funds from project key 18780. Reduce the
Construction phase estimate by $100.00.
2018-2021 Active STIP CLACKAMAS
Name: OR212: UPRR Structure - Rock Creek Key: 19356
Description Repave roadway and upgrade sidewalk corner ramps to
current standards. Region: 1
MPO: Portland Metro MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
5.20 to 8.19 2.99 OR-212 CLACKAMAS REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2018 2019
Total $1,329,610.00 $124,917.00 $4,261,282.00 $5,715,809.00
Fund 1 L050 $672,975.00 Z001 $62,502.33 Z001 $3,622,776.07
Match $77,025.00 $7,153.67 $414,642.93
Fund 2 Z240 $389,078.25 ACP0 $49,586.00 ACP0 $200,872.27
Match $44,531.75 $5,675.00 $22,990.73
Fund 3 Z230 $131,005.80
Match $14,994.20
Footnote: $ 5,058,336 Total R1 Preservation funds and $657,473
HB2017 funds
Most Recent Amendment ApprovedAmendment No: 18-21-0961 Approval
Date: 5/14/2018
Requested Action: Increase the Right of Way phase estimate by
$55,261, adding funds from project key 18780.
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 14 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: Canby (M J Lee) Ferry Bank Stabilization and ITS Key:
19641
Description Stabilize north side roadway approach; install ITS
improvements Region: 1
MPO: Non-MPO Work Type: SPPROG
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016 2019 2020 2016
Total $235,000.00 $25,000.00 $108,059.50 $402,305.50
$770,365.00
Fund 1 M950 $188,000.00 M950 $20,000.00 OTH0 $83,875.50 M950
$321,844.40
Match $47,000.00 $5,000.00 $80,461.10
Fund 2 M950 $19,347.00
Match $4,837.00
Footnote: Federal Ferry Boat Program Project
Most Recent Amendment ApprovedAmendment No: 18-21-1079 Approval
Date: 5/29/2018
Requested Action:Increase the Preliminary Engineering phase by
$90,000, the Right of Way phase by $5,000 and the Other phase by
$120,937.50. Decrease the Construction phase by $177,852.50.
2018-2021 Active STIP CLACKAMAS
Name: I-205: Stafford Rd - OR99E Key: 19786
Description Complete the environmental assessment and project
development to add a third lane in each direction between Stafford
Road and OR43 and a forth lane on the Abernethy Bridge to help
separate through traffic.
Region: 1
MPO: Portland Metro MPO Work Type: MODERN, OPERAT
Applicant: ODOT Status: PLANNING ACTIVITY
Location(s)
Mileposts Length Route Highway ACT County(s)
3.30 to 9.50 6.20 I-205 EAST PORTLAND FREEWAY REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2016
Total $15,000,000.00 $15,000,000.00
Fund 1 Z460 $11,527,500.00
Match $972,500.00
Fund 2 OTH0 $2,500,000.00
Match
Fund 3
Match
Footnote: $2.5M Freight funds approved by OTC 03-17-16, $10M
Freight funds approved by OTC on 8/17/17 & $2.5M Metro's
Regional Flexible Funds bonded through TriMet per IGA 31954. Total
project cost estimated at $499.6 (including bridge widening &
seismic retrofit)
Most Recent Amendment ApprovedAmendment No: 18-21-0874 Approval
Date: 5/31/2018
Requested Action: Increase the Planning phase by $2,500,000,
adding TriMet funds.
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 15 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: Wilsonville mass transit program (15-17) Key: 19911
Description Category A vehicle replacement - 1 vehicle Region:
1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: CITY OF WILSONVILLE Status: NON-CONSTRUCTION
PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $425,001.00 $425,001.00
Fund 1 ACP0 $381,353.40
Match $43,647.60
Footnote:
Most Recent Amendment ApprovedAmendment No: 15-18-2843 Approval
Date: 9/19/2017
Requested Action: Slip to 2018
2018-2021 Active STIP CLACKAMAS
Name: OR217/OR224: bridge rail retrofit Key: 19918
Description Bridge rail retrofit bridges 16134, 16143, 09623
Region: 1
MPO: Portland Metro MPO Work Type: BRIDGE
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
2.39 to 2.45 0.06 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS
2.41 to 2.57 0.16 OR-217 BEAVERTON-TIGARD REGION 1 ACT
WASHINGTON
2.95 to 3.09 0.14 OR-224 BEAVERTON-TIGARD REGION 1 ACT
WASHINGTON
2.95 to 3.09 0.14 OR-224 BEAVERTON-TIGARD REGION 1 ACT
WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2017 2018
Total $325,000.00 $1,627,000.00 $1,952,000.00
Fund 1 Z001 $291,622.50 Z240 $1,459,907.10
Match $33,377.50 $167,092.90
Footnote:
Most Recent Amendment ApprovedAmendment No: 15-18-1144 Approval
Date: 10/5/2016
Requested Action: Add new project per June 2016 OTC
approval.
2018-2021 Active STIP CLACKAMAS
Name: US26: WEBBER - E CHERRYVILLE Key: 20210
Description Repave roadway, upgrade ADA to current standards,
and upgrade guardrail/signs as needed. Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
30.40 to 32.50 2.10 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019 2021
Total $569,598.00 $3,797,314.00 $4,366,912.00
Fund 1 Z001 $511,100.29 Z001 $3,407,329.85
Match $58,497.71 $389,984.15
Footnote:
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 16 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: US26: ZIGZAG - RHODODENDRON Key: 20211
Description Repave roadway, upgrade ADA to current standards,
and upgrade guardrail/signs as needed. Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
42.54 to 44.10 1.56 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019 2019 2020
Total $215,019.00 $9,951.00 $1,433,459.00 $1,658,429.00
Fund 1 Z001 $192,936.55 Z001 $8,929.03 Z001 $1,286,242.76
Match $22,082.45 $1,021.97 $147,216.24
Footnote:
2018-2021 Active STIP CLACKAMAS
Name: OR35: US26 - WHITE RIVER Key: 20213
Description Design for roadway repaving, ADA upgrades, signs,
and guardrail replacement as needed. Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS
Location(s)
Mileposts Length Route Highway ACT County(s)
57.20 to 61.70 4.50 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $421,980.00 $421,980.00
Fund 1 Z001 $378,642.65
Match $43,337.35
Footnote: Design only project - R1 Shelf Program = $351,000,
Preservation Program = $70,980
2018-2021 Active STIP CLACKAMAS
Name: OR43: Arbor Dr - Hidden Springs Rd Key: 20329
Description Construct a new cycle track and sidewalk along OR-43
from Arbor Dr to Hidden Springs Rd and construct about 7,500 sq ft.
of new road extending Hidden Springs Rd to Old River Rd.
Region: 1
MPO: Portland Metro MPO Work Type: BIKPED
Applicant: CITY OF WEST LINN Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
8.04 to 9.22 1.18 OR-43 OSWEGO HIGHWAY REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2019 2020
Total $841,248.00 $439,779.00 $4,837,176.00 $6,118,203.00
Fund 1 Z301 $563,720.28 Z001 $294,695.75 Z230 $2,999,999.62
Match $64,520.31 $33,729.25 $343,363.38
Fund 2 OTH0 $213,007.41 OTH0 $111,354.00 OTH0 $1,224,579.00
Match
Fund 3 Z001 $241,583.67
Match $27,650.33
Footnote: $1,100,000 Federal MTEP Award and $3,000,000 Metro
RFFA Urban STBG
Most Recent Amendment ApprovedAmendment No: 18-21-0962 Approval
Date: 6/19/2018
Requested Action:
Update the project name to OR43: Arbor Dr - Hidden Springs Rd.
Update the project location mile points from 8.02-9.10 to
8.04-9.22.
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 17 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SYSTEMIC SIGNALS AND ILLUMINATION (CLACKAMAS) Key:
20336
Description Safety projects at various locations. Work may
include illumination, intersection work, bike and pedestrian
improvements, ADA upgrades, signal work, signs, warnings, striping,
medians, utility relocation, and other safety improvements.
Region: 1
MPO: Portland Metro MPO Work Type: SAFETY
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2018 2018 2020
Total $175,600.00 $19,500.00 $2,900.00 $900,900.00
$1,098,900.00
Fund 1 ZS30 $161,938.32 ZS30 $17,982.90 ZS30 $2,674.38 ZS30
$830,809.98
Match
Fund 2 OTH0 $13,661.68 OTH0 $1,517.10 OTH0 $225.62 OTH0
$70,090.02
Match
Footnote: $ 1,013,405 Federal ARTS award
2018-2021 Active STIP CLACKAMAS
Name: EAST SYSTEMIC SIGNALS AND ILLUMINATION (MOLALLA) Key:
20337
Description Install illumination, advance intersection warning
signs with street names, transverse rumble strips on approaches,
and increase triangle sight distances at the intersections of
OR-213 at Toliver and OR-211 at Ona Way.
Region: 1
MPO: Non-MPO Work Type: SAFETY
Applicant: CITY OF MOLALLA Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
11.80 to 11.81 0.01 OR-211 WOODBURN/ESTACADA REGION 1 ACT
CLACKAMAS
15.71 to 15.73 0.02 OR-213 CASCADE SOUTH REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2018 2020
Total $43,700.00 $2,900.00 $82,100.00 $128,700.00
Fund 1 ZS30 $40,300.14 ZS30 $2,674.38 ZS30 $75,712.62
Match
Fund 2 OTH0 $3,399.86 OTH0 $225.62 OTH0 $6,387.38
Match
Footnote: $ 118,687 Federal ARTS award
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 18 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: East Systemic Signals and Illumination (ODOT) Key:
20339
Description Illumination, intersection work, bike and pedestrian
improvements, ADA upgrades, signal work, signs, warnings, striping,
medians, utility relocation, and other safety improvements at
various locations.
Region: 1
MPO: Non-MPO, Portland Metro MPO Work Type: SAFETY
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
0.14 to 16.10 15.96 OR-213 CASCADE SOUTH REGION 1 ACT
CLACKAMAS
0.68 to 5.36 4.68 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS
5.38 to OR-211 EAGLE CREEK/SANDY REGION 1 ACT CLACKAMAS
7.41 to 22.89 15.48 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2018 2020
Total $552,100.00 $66,900.00 $2,590,075.00 $3,209,075.00
Fund 1 MS30 $509,146.62 ZS30 $66,900.00 ZS30 $2,590,075.00
Match $42,953.38
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-1046 Approval
Date: 6/4/2018
Requested Action:
Increase the Preliminary Engineering phase estimate by $2,700
and the Construction phase estimate by $30,375, moving funds and
scope from project key 20400. Add new project location from project
key 20400, mile point 5.38 on OR-211.
2018-2021 Active STIP CLACKAMAS
Name: RUMBLE STRIPS (ODOT) Key: 20341
Description Install centerline rumble strips and install
shoulder rumble strips on I-5, I-84, OR-43, US-26, OR-8, I-205,
I-405, OR-99E, US-30, US-30BY, OR-217, OR-213, OR-211, OR-224,
HWY-173 (Timberline), OR-212, OR-281, and OR-282.
Region: 1
MPO: Portland Metro MPO Work Type: SAFETY
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, HOOD RIVER, MULTNOMAH,
WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2019
Total $150,600.00 $950,854.00 $1,101,454.00
Fund 1 MS32 $150,600.00 ZS30 $950,854.00
Match
Footnote: $ 1,101,454 Total ARTS funding
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 19 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: US-26: SE Kelso Rd - Frog Lake Sno Park Key: 20362
Description Rehabilitation and replacement of culverts. Region:
1
MPO: Non-MPO Work Type: CULVRT
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
21.10 to 57.60 36.50 US-26 MT HOOD REGION 1 ACT CLACKAMAS
57.60 to 62.15 4.55 US-26 WARM SPRINGS REGION 1 ACT
CLACKAMAS
57.70 to 57.80 0.10 US-26 MT HOOD REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019 2020
Total $491,003.00 $2,455,015.00 $2,946,018.00
Fund 1 ACP0 $359,819.99 ACP0 $2,014,451.96
Match $41,183.01 $230,563.04
Fund 2 Z240 $80,757.00 Z001 $188,433.00
Match $9,243.00 $21,567.00
Footnote: $300,000 Culvert and $2,646,018 HB2017 funds
Most Recent Amendment ApprovedAmendment No: 18-21-0895 Approval
Date: 5/1/2018
Requested Action:
Update the project location mile points and the project name.
Increase the Preliminary Engineering phase by $401,003 and the
Construction phase by $2,245,015. Slip the Preliminary Engineering
phase to federal fiscal year 2019 for delivery.
2018-2021 Active STIP CLACKAMAS
Name: RURAL INTERSECTION AND CURVE WARNING (CLACKAMAS) Key:
20398
Description Install and or update advance warning signs,
intersection signs, and other street signs and safety treatments at
various rural intersections, roadway departures and curves
throughout Clackamas County.
Region: 1
MPO: Portland Metro MPO Work Type: SAFETY
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2018 2019
Total $278,500.00 $2,900.00 $1,488,769.00 $1,770,169.00
Fund 1 ZS30 $256,832.70 ZS30 $2,674.38 ZS30 $1,372,942.77
Match
Fund 2 OTH0 $21,667.30 OTH0 $225.62 OTH0 $115,826.23
Match
Footnote: $ 1,632,450 Federal ARTS award
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 20 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: OR224 AT LAKE/HARMONY Key: 20454
Description Replace overhead flasher with ground mounted advance
flashers. Region: 1
MPO: Portland Metro MPO Work Type: OP-SSI
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
2.40 to 2.50 0.10 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020 2021
Total $55,128.00 $53,950.00 $109,078.00
Fund 1 Z240 $49,466.35 Z001 $48,409.34
Match $5,661.65 $5,540.66
Footnote: $ 109,078 Total Operations allocation
2018-2021 Active STIP CLACKAMAS
Name: OR99E: CLACKAMAS RIVER (MCLOUGHLIN) BRIDGE Key: 20472
Description Design for a future construction project to paint
structure. Region: 1
MPO: Portland Metro MPO Work Type: BRIDGE
Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS
Location(s)
Mileposts Length Route Highway ACT County(s)
11.13 to 11.27 0.14 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $250,000.00 $250,000.00
Fund 1 Z002 $224,325.00
Match $25,675.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 15-18-2161 Approval
Date: 6/14/2017
Requested Action: Advance Preliminary Engineering to current
STIP.
2018-2021 Active STIP CLACKAMAS
Name: I-205 at OR43 Key: 20475
Description Design for full illumination rebuild Region: 1
MPO: Portland Metro MPO Work Type: OP-SSI
Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS
Location(s)
Mileposts Length Route Highway ACT County(s)
8.70 to 8.90 0.20 I-205 EAST PORTLAND FREEWAY REGION 1 ACT
CLACKAMAS
11.20 to 11.40 0.20 OR-43 OSWEGO HIGHWAY REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $143,044.00 $143,044.00
Fund 1 Z233 $128,353.38
Match $14,690.62
Footnote: R1 Shelf Program - $ 143,044 Total Operations
allocation for design only.
Most Recent Amendment ApprovedAmendment No: 15-18-2261 Approval
Date: 6/14/2017
Requested Action: Advance PE from 2018 to 2017
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 21 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SE Jennings Ave at SE Addie St (Clackamas) Key: 20476
Description Install traffic separators with associated striping,
illumination, and signal coordination work. Region: 1
MPO: Portland Metro MPO Work Type: SAFETY
Applicant: CITY OF PORTLAND Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2020
Total $14,300.00 $23,100.00 $37,400.00
Fund 1 ZS30 $14,300.00 ZS30 $23,100.00
Match
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0880 Approval
Date: 6/19/2018
Requested Action:
Reduce the project by $859,100, moving scope and funds to
project keys 20304, 20334, and 20335. Update project name to SE
Jennings Ave at SE Addie St (Clackamas) to reflect reduced
scope.
2018-2021 Active STIP CLACKAMAS
Name: OR213 AT MP 15.71 (TOLIVER RD) Key: 20478
Description Design roundabout at intersection of OR-213 and
Toliver road. Region: 1
MPO: Non-MPO Work Type: SAFETY
Applicant: ODOT Status: PROJECT FUNDED THROUGH FINAL PLANS
Location(s)
Mileposts Length Route Highway ACT County(s)
15.70 to 15.72 0.02 OR-213 CASCADE SOUTH REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $700,000.00 $700,000.00
Fund 1 ZS32 $700,000.00
Match
Footnote: $ 700,000 Total Safety allocation
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 22 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: Region 1 Bike Ped Crossings Key: 20479
Description Bike and pedestrian improvements on 82nd Ave
(OR-213), McLoughlin (OR-99E), Powell (US-26) OR8 at Baseline.
Includes RRFBs, medians, illumination, crosswalks, tree
trimming/removal, bike lane striping, sidewalks, ADA upgrades, and
other improvements.
Region: 1
MPO: Portland Metro MPO Work Type: BIKPED, SAFETY
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
2.07 to 2.07 0.00 US-26 MT HOOD REGION 1 ACT MULTNOMAH
5.60 to 5.60 0.00 OR-213 CASCADE NORTH REGION 1 ACT
MULTNOMAH
6.87 to 11.14 4.27 OR-99E PACIFIC HWY EAST REGION 1 ACT
CLACKAMAS
7.38 to 7.38 0.00 US-26 MT HOOD REGION 1 ACT MULTNOMAH
16.57 to 16.57 0.00 OR-8 TUALATIN VALLEY HIGHWAY REGION 1 ACT
WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2017 2019 2020
Total $581,600.00 $74,000.00 $1,643,400.00 $2,299,000.00
Fund 1 MS30 $276,660.00 ACP0 $74,000.00 MS30 $1,643,400.00
Match $23,340.00
Fund 2 ZS30 $281,600.00
Match
Footnote: $1,149,000 Total Safety allocation and $1.150,000 AT
leverage funds. Draft K20520 and K20521 combined into this
project.
Most Recent Amendment ApprovedAmendment No: 18-21-0579 Approval
Date: 2/12/2018
Requested Action: Slip the Right of Way phase to federal fiscal
year 2019 for delivery.
2018-2021 Active STIP CLACKAMAS
Name: I-205: Abernethy Bridge - SE 82nd Dr Key: 20508
Description Remove and replace asphalt surface to repair rutted
pavement. Region: 1
MPO: Portland Metro MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
9.31 to 13.80 4.49 I-205 EAST PORTLAND FREEWAY REGION 1 ACT
CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2018 2020
Total $810,000.00 $994.00 $5,136,294.00 $5,947,288.00
Fund 1 Z002 $746,982.00 Z001 $916.67 Z001 $4,736,690.33
Match $63,018.00 $77.33 $399,603.67
Footnote: $5,947,288.00 total IM allocation
Most Recent Amendment ApprovedAmendment No: 18-21-0171 Approval
Date: 12/28/2017
Requested Action: Increase PE funding
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 23 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: OR224 Clackamas Hwy: MP 31.8 - 32.8 Key: 20675
Description Resurface section of roadway. Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: ODOT Status: PROJECT SCHEDULED FOR CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
31.80 to 32.80 1.00 OR-224 CLACKAMAS REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2018
Total $96,052.00 $1,167,744.00 $1,263,796.00
Fund 1 G20E $86,187.46 G20E $1,047,817.00
Match $9,864.54 $119,927.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-0972 Approval
Date: 6/8/2018
Requested Action:Increase the Construction phase estimate by
$399,331, adding additional Federal Lands Access program (FLAP)
funds.
2018-2021 Active STIP CLACKAMAS
Name: E SALMON RIVER RD: US26 - MT HOOD NATIONAL FOREST Key:
20780
Description Repave and restripe roadway, replace guardrails
Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020 2020
Total $50,000.00 $443,099.00 $493,099.00
Fund 1 OTH0 $27,711.00 OTH0 $242,497.00
Match
Fund 2 G20E $19,999.92 G20E $180,000.17
Match $2,289.08 $20,601.83
Footnote:
2018-2021 Active STIP CLACKAMAS
Name: LOLO PASS ROAD Key: 20781
Description Stabilize and improve Lolo Pass Rd by extending
existing revetment (barrier) and by repaving road Region: 1
MPO: Non-MPO Work Type: PRESRV
Applicant: CLACKAMAS COUNTY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019 2020
Total $188,017.00 $3,864,386.00 $4,052,403.00
Fund 1 OTH0 $165,728.00 G20E $3,221,921.65
Match $368,763.35
Fund 2 G20E $19,999.92 OTH0 $273,701.00
Match $2,289.08
Footnote:
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 24 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: MOLALLA AVE: BEAVER CREEK RD TO OR213 Key: 20810
Description Project includes 10 ft wide ADA compliant sidewalks,
street trees, and pedestrian level street lighting along the west
side of the corridor. Project also includes continuous bike lanes,
transit amenities, street furnishing, and improved access
management.
Region: 1
MPO: Portland Metro MPO Work Type: BIKPED
Applicant: CITY OF OREGON CITY Status: PROJECT SCHEDULED FOR
CONSTRUCTION
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018 2019 2020
Total $1,401,389.00 $521,023.00 $6,062,967.00 $7,985,379.00
Fund 1 OTH0 $1,401,389.00 OTH0 $521,023.00 OTH0
$6,062,967.00
Match
Footnote: RFFA 19-21 Award. Proposed for defederalization
through $3,800,632 fund swap with TriMet
2018-2021 Active STIP CLACKAMAS
Name: I-5 OVERCROSSING: SW BARBER - SW TOWN CENTER LOOP Key:
20816
Description Design a 14 ft wide pedestrian and bicycle bridge
spanning 290 ft over SW Boones Ferry Rd and I-5, connecting SW
Barber St with SW Town Center Loop West. Project includes retaining
walls, public art, utility relocation and stormwater runoff
treatment
Region: 1
MPO: Portland Metro MPO Work Type: BIKPED
Applicant: CITY OF WILSONVILLE Status: PROJECT FUNDED THROUGH
FINAL PLANS
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $1,727,405.00 $1,727,405.00
Fund 1 Z230 $1,155,000.07
Match $132,194.93
Fund 2 Z301 $395,000.43
Match $45,209.57
Footnote: RRFA 19-21 Award of $1,550,000 Federal ($395,000 TAP
and $1,155,000 STP)
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS PURCHASE (2019) Key: 20818
Description Bus Purchase Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $4,286,416.00 $4,286,416.00
Fund 1 FF30 $3,429,133.00
Match $857,283.00
Footnote: $ 3,429,133 Federal 5339 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 25 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS PURCHASE (2020) Key: 20819
Description Bus Purchase Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $4,372,144.00 $4,372,144.00
Fund 1 FF30 $3,497,716.00
Match $874,428.00
Footnote: $3,497,716 Federal 5339 funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS PURCHASE (2021) Key: 20820
Description Bus Purchase Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $4,459,587.00 $4,459,587.00
Fund 1 FF30 $3,567,670.00
Match $891,917.00
Footnote: $ 3,567,670 Federal 5339 Funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2019) Key:
20821
Description Capital Maintenance For Bus And Rail Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $48,376,958.00 $48,376,958.00
Fund 1 FF91 $38,701,566.00
Match $9,675,392.00
Footnote: $ 38,701,566 Federal 5307 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 26 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2020) Key:
20822
Description Capital Maintenance For Bus And Rail Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $49,025,747.00 $49,025,747.00
Fund 1 FF91 $39,220,597.00
Match $9,805,150.00
Footnote: $39,220,597 Federal 5307 Funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2021) Key:
20823
Description Capital Maintenance For Bus And Rail Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $49,687,511.00 $49,687,511.00
Fund 1 FF91 $39,750,009.00
Match $9,937,502.00
Footnote: $ 39,750,009 Federal 5307 funds
2018-2021 Active STIP CLACKAMAS
Name: COMMUNITY JOB CONNECTORS (2019) Key: 20824
Description To improve access to jobs and job-related activities
for the low-income workforce and to transport residents in
urbanized and non-urbanized areas to suburban employment
opportunities.
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $1,774,800.00 $1,774,800.00
Fund 1 FF90 $887,400.00
Match $887,400.00
Footnote: $ 887,400 Federal 5307 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 27 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: COMMUNITY JOB CONNECTORS (2020) Key: 20825
Description To improve access to jobs and job-related activities
for the low-income workforce and to transport residents in
urbanized and non-urbanized areas to suburban employment
opportunities.
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $2,320,296.00 $2,320,296.00
Fund 1 FF90 $1,160,148.00
Match $1,160,148.00
Footnote: $ 1,160,148 Federal 5307 Funds
2018-2021 Active STIP CLACKAMAS
Name: COMMUNITY JOB CONNECTORS (2021) Key: 20826
Description To improve access to jobs and job-related activities
for the low-income workforce and to transport residents in
urbanized and non-urbanized areas to suburban employment
opportunities.
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $2,876,702.00 $2,876,702.00
Fund 1 FF90 $1,438,351.00
Match $1,438,351.00
Footnote: $1,438,351 Federal 5307 Funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2019) Key:
20827
Description Capital Maintenance For Bus And Rail Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $31,227,907.00 $31,227,907.00
Fund 1 FF91 $24,982,326.00
Match $6,245,581.00
Footnote: $ 24,982,326 Federal 5337 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 28 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2020) Key:
20828
Description Capital Maintenance For Bus And Rail Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $31,852,465.00 $31,852,465.00
Fund 1 FF91 $25,481,972.00
Match $6,370,493.00
Footnote: $ 25,481,972 Federal 5337 Funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET BUS & RAIL PREVENTIVE MAINTENANCE (2021) Key:
20829
Description Capital Maintenance For Bus And Rail Region: 1
MPO: Non-MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $32,489,514.00 $32,489,514.00
Fund 1 FF91 $25,991,611.00
Match $6,497,903.00
Footnote: $ 25,991,611 Federal 5337 Funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET ELDERLY & DISABLED PROGRAM (2019) Key:
20836
Description Services And Facility Improvements In Excess Of ADA
Requirements Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $2,398,905.00 $2,398,905.00
Fund 1 F160 $1,919,124.00
Match $479,781.00
Footnote: $ 1,919,124 Federal 5310 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 29 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: TRIMET ELDERLY & DISABLED PROGRAM (2020) Key:
20837
Description Services And Facility Improvements In Excess Of ADA
Requirements Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $2,446,883.00 $2,446,883.00
Fund 1 F160 $1,957,506.00
Match $489,377.00
Footnote: $ 1,957,506 Federal 5310 Funds
2018-2021 Active STIP CLACKAMAS
Name: TRIMET ELDERLY & DISABLED PROGRAM (2021) Key:
20838
Description Services And Facility Improvements In Excess Of ADA
Requirements Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $2,495,821.00 $2,495,821.00
Fund 1 F160 $1,996,656.00
Match $499,165.00
Footnote: $ 1,996,656 Federal 5310 funds
2018-2021 Active STIP CLACKAMAS
Name: Bus & Rail Preventive Maintenance (RFFA-2018) Key:
20839
Description Capital maintenance for bus & rail (Regional
Flexible Fund Allocation Fund Exchange) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT MULTNOMAH
REGION 1 ACT CLACKAMAS
REGION 1 ACT WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2018
Total $2,623,599.00 $2,623,599.00
Fund 1 Z230 $2,354,155.38
Match $269,443.62
Footnote: $2,354,155 Federal STP funds
Most Recent Amendment ApprovedAmendment No: 18-21-0016 Approval
Date: 10/11/2017
Requested Action: Slip funding to 2018
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 30 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: BUS & RAIL PREVENTIVE MAINTENANCE (RFFA-2019) Key:
20840
Description Capital Maintenance For Bus & Rail (Regional
Flexible Fund Allocation Fund Exchange) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $1,779,189.00 $1,779,189.00
Fund 1 Z230 $1,596,466.00
Match $182,723.00
Footnote: $ 1,596,466 Federal STP funds
2018-2021 Active STIP CLACKAMAS
Name: BUS & RAIL PREVENTIVE MAINTENANCE (RFFA-2020) Key:
20841
Description Capital Maintenance For Bus & Rail (Regional
Flexible Fund Allocation Fund Exchange) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $4,906,561.00 $4,906,561.00
Fund 1 Z230 $4,402,657.00
Match $503,904.00
Footnote: $ 4,402,657 Federal STP funds
2018-2021 Active STIP CLACKAMAS
Name: BUS & RAIL PREVENTIVE MAINTENANCE (RFFA-2021) Key:
20842
Description Capital Maintenance For Bus & Rail (Regional
Flexible Fund Allocation Fund Exchange) Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $2,793,658.00 $2,793,658.00
Fund 1 Z230 $2,506,749.00
Match $286,909.00
Footnote: $ 2,506,749 Federal STP
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 31 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: Portland to Milwaukie Light Rail (2019) Key: 20843
Description This project extends light rail from PSU in downtown
Portland to Milwaukie and north Clackamas County. It includes a
multi-modal bridge carrying light rail, streetcar, buses, bicycles
and pedestrians.
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
REGION 1 ACT MULTNOMAH
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $117,515,849.00 $117,515,849.00
Fund 1 FF30 $65,664,144.00
Match $51,851,705.00
Footnote:
Most Recent Amendment ApprovedAmendment No: 18-21-1106 Approval
Date: 6/20/2018
Requested Action: Increase project cost by $49,509,141.
2018-2021 Active STIP CLACKAMAS
Name: LOW - NO ZERO EMISSION BUS PROJECT (2019) Key: 20847
Description Fund procurement and deployment of 5 battery
electric buses and associated charging infrastructure to be
deployed from Merlo garage on a Westside route to be
determined.
Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $4,517,494.00 $4,517,494.00
Fund 1 FF30 $2,117,750.00
Match $2,399,744.00
Footnote: $ 2,117,750 Federal 5339 Funds
2018-2021 Active STIP CLACKAMAS
Name: LOW - NO ZERO EMISSION BUS PROJECT (2020) Key: 20848
Description Fund procurement and deployment of 5 battery
electric buses and associated charging infrastructure to be
deployed from Merlo garage on a Westside route to be
determined.
Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $106,658.00 $106,658.00
Fund 1 FF30 $50,000.00
Match $56,658.00
Footnote: $ 50,000 Federal 5339 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 32 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: OPEN TRIP PLANNER Key: 20850
Description Add to current Open Trip Planner (OTP) other transit
planning function to incorporate first/last mile connections by
ridehailing and bike share. Already OTP supports connections to
transit by bike.
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: TRIMET Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $14,779.00 $14,779.00
Fund 1 FF12 $10,000.00
Match $4,779.00
Footnote: $ 10,000 Federal 5312 Funds
2018-2021 Active STIP CLACKAMAS
Name: SMART MOBILITY MANAGEMENT (2019) Key: 20863
Description RideWise Travel Trainer Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $39,607.00 $39,607.00
Fund 1 F160 $31,686.00
Match $7,921.00
Footnote: $ 31,686 Federal 5310 Funds
2018-2021 Active STIP CLACKAMAS
Name: SMART MOBILITY MANAGEMENT (2020) Key: 20864
Description RideWise Travel Trainer Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $39,607.00 $39,607.00
Fund 1 F160 $31,686.00
Match $7,921.00
Footnote: $ 31,686 Federal 5310 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 33 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SMART ADA STOP ENHANCEMENTS (2019) Key: 20865
Description Bus stop enhancements Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $57,045.00 $57,045.00
Fund 1 F160 $45,636.00
Match $11,409.00
Footnote: $ 45,636 Federal 5310 Funding
2018-2021 Active STIP CLACKAMAS
Name: SMART SENIOR & DISABLED PROGRAM (2019) Key: 20866
Description Services & Facility Improvements for Elderly
& Disabled Customers Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $51,250.00 $51,250.00
Fund 1 F160 $41,000.00
Match $10,250.00
Footnote: $ 41,000 Federal 5310 Funds
2018-2021 Active STIP CLACKAMAS
Name: SMART SENIOR & DISABLED PROGRAM (2020) Key: 20867
Description Services & Facility Improvements for Elderly
& Disabled Customers Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $51,250.00 $51,250.00
Fund 1 F160 $41,000.00
Match $10,250.00
Footnote: $ 51,250 Federal 5310 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 34 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SMART SENIOR & DISABLED PROGRAM (2021) Key: 20868
Description Services & Facility Improvements for Elderly
& Disabled Customers Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $51,250.00 $51,250.00
Fund 1 F160 $41,000.00
Match $10,250.00
Footnote: $ 41,000 Federal 5310 Funds
2018-2021 Active STIP CLACKAMAS
Name: SMART BUS AND BUS FACILITIES (CAPITAL) 2019 Key: 20869
Description Bus and Bus Facility Upgrades Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $87,500.00 $87,500.00
Fund 1 FF30 $70,000.00
Match $17,500.00
Footnote: $ 70,000 Federal 5339 Funds
2018-2021 Active STIP CLACKAMAS
Name: SMART BUS AND BUS FACILITIES (CAPITAL) 2020 Key: 20870
Description Bus and Bus Facility Upgrades Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $96,000.00 $96,000.00
Fund 1 FF30 $75,000.00
Match $21,000.00
Footnote: $ 75,000 Federal 5339 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 35 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SMART BUS AND BUS FACILITIES (CAPITAL) 2021 Key: 20871
Description Bus and Bus Facility Upgrades Region: 1
MPO: Portland Metro MPO Work Type: TR-CAP
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $105,200.00 $105,200.00
Fund 1 FF30 $80,000.00
Match $25,200.00
Footnote: $ 80,000 Federal 5339 Funds
2018-2021 Active STIP CLACKAMAS
Name: SMART bus replacement and technology 2019 Key: 20872
Description Maintenance and bus fleet replacement and software
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: LOCAL Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2019
Total $373,448.00 $373,448.00
Fund 1 FF91 $298,758.00
Match $74,690.00
Footnote: $ 298,758 Federal 5307 Funds
Most Recent Amendment ApprovedAmendment No: 18-21-0308 Approval
Date: 12/28/2017
Requested Action: Change MPO field to state Portland MPO
2018-2021 Active STIP CLACKAMAS
Name: SMART BUS REPLACEMENT AND TECHNOLOGY 2020 Key: 20873
Description Maintenance and Bus Fleet Replacement & Software
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: SMART Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2020
Total $373,448.00 $373,448.00
Fund 1 FF91 $298,758.00
Match $74,690.00
Footnote: $ 298,758 Federal 5307 Funds
OnlineSTIP_ODOT_2017.10.03.v1.1 Page 36 of 664 As of 7/6/2018
6:30:09 AMPrinted 7/6/2018 6:34:01 AM 1486 Projects
2018-2021 Active STIP CLACKAMAS 2018-2021 Active STIP
-
2018-2021 Active STIP CLACKAMAS
Name: SMART BUS REPLACEMENT AND TECHNOLOGY 2021 Key: 20874
Description Maintenance and Bus Fleet Replacement & Software
Region: 1
MPO: Portland Metro MPO Work Type: TRANST
Applicant: LOCAL Status: NON-CONSTRUCTION PROJECT
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACT CLACKAMAS
Current Project Estimate
Planning Prelim. Engineering Right of Way Utility Relocation
Construction Other Project Total
Year 2021
Total $373,448.00 $373,448.00
Fund 1 FF91 $298,758.00
Match $74,690.00
Footnote: $ 298,758 Federal 5307 Funds
2018-2021 Active STIP CLACKAMAS
Name: REGIONAL MPO PLANNING (2019) Key: 20875
Description Funding for Metro to meet Metropolitan Planning
Organization mandates, established through the federal regulations.
Region: 1
MPO: Portland Metro MPO Work Type: PLANNG
Applicant: METRO Status: PLANNING ACTIVITY
Location(s)
Mileposts Length Route Highway ACT County(s)
REGION 1 ACTCLACKAMAS, MULTNOMAH, WASHINGTON
Current Project Estimate
Planning Prelim. Engineering Right of Way