Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011
16

Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

Jan 15, 2016

Download

Documents

Kelly Joy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

Access and Connection processes for Renewable Units:

Experiences from Red Eléctrica de España

Istambul March 2011

Page 2: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

Recently, National regulation oriented to control of generation to be connected per year,

securing economic and technical sustainability

RD1578/2008 for Solar FV, extending RD661 objectives with quotas of 500-400 MW per year with progressive reduction of tariffs

emphasis on roof plants over floor plants

RDL6/2009 for the rest of SRG, establishing quotas per year for plants to be commissioned (upto ≈ 2,5 GW Solar Thermal in 2013; upto ≈ 23 GW Wind in 2012), demonstrating some pre-requisites:

Access and connection authorization issued by REE or distribution company

Administrative authorization for power plants > 100 kW

License for Commissioning

Deposit of a bank guarantee (for wind: 20€/kW; for Solar Thermal: 100€/kW)

Financial resources at least for 50% of the total

Purchase -or contract- at least for 50% of the equipment

Authorisation for gas access and water supply (when applicable)

Recent modifications of regulation for Special Regime Generation (SRG)

Page 3: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

3

Capacity of the Transmission Network for Generators:

General: No grid capacity reserve or preference derives from temporal precedence. Possible production constraints are to be solved by market mechanisms

No connection limitation: Newcomers may degrade the production possibilities of existing or previously foreseen

Less barriers but more uncertainty tendency to overinstallation

Special Regime Generation

Priority at dispatch, subject to system security operation risk

Congestions motivate system development ineffective planning

Connection limitation according to zonal studies from OS

Development and Access to the Network

Page 4: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

Number of Access applications very over some

transmission nodes evacuation capacity

Regional limits for installing new generation

Wind farms building time much shorter than needed for

network developments necessary for connection

Permissions for new generation (via Regional

Administration) easier to get than network reinforcement

ones

Network Access and Connection: Transmission grid development implications from RES units

Page 5: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

5

Interaction between Grid Planning and Access to the grid applications

Access to the grid Regulated continuous process

by which REE assess the

acceptability of non-

transmission facilities

applications

Grid Planning• REE carries out planning studies and proposals

• National Goverment (with Regional Administrations):

approve the grid development plan

• Every 4 years, new planning horizon (10 years)

Binding (unlike indicative planning for generation)

The actual development of the grid (authorization, construction and commissioning) takes from 1 to more than 10 years

Studies for SRG Integration

Page 6: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

6

A new perspective is introduced

From ¿What capacity of integration ?

To ¿Which conditions and requisites

would be needed to maximize secure integration of SRG (RES) and achieve the foreseen objectives?

SRG Integration Studies

Regulation Proposals

Grid Studies Zonal connection capacity in MW

Bulk System or Coverage Studies(Single Bus System Adequacy Studies)

Estimation of Operation Conditions

Page 7: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

7

Capacity Studies

Assessment of generation limits to preserve adequacy and security of power

system, according to planning and operation criteria, applied to an horizon within the

current medium term grid development plan

Adequacy: Assessment of generation limits by nodes and zones,

reflecting structural grid capacity

Steady State Behaviour (load flow contingency analysis)

Short-circuit power (5% Scc, for non dispatchable fluctuant

generation)

Security: Validation of previously concluded limits by nodes and zones

Dynamic behaviour (stability after short-circuit)

Design criteria: buses with sufficient meshing, minimum magnitud for

generation, …..

Page 8: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

8

Preserving the security of supply requires to avoid persistent constraints from RES units in order to:

Limit the operational risk associated to the solution of constraints and the security guarantee, specially considering the dispatch priority

Enable a coherent and efficient grid development

This calls for establishing connection capacities by zone associated to grid development plans which may avoid permanent constraints

Development and Access to the Network for Renewable Generators (RES): Connection Capacity

Page 9: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

9

Access and Connection : Overview Procedures for Access and connection are managed by REE, as System

Operator and and Transmission owner. Main Features:

Main Perspective Object - Scope

Access System Operation System behaviour

Connection Transmission Engineering and Physical Feasibility

Connection Contract (CC)

REE carries out capacity studies at nodal and regional levels Capacity of Connection

Regional Administrations identify Coordinator (C) and generators

C accomplish Access and Connection Procedures Connection Authorisation

Connection Authorisation enables Administrative Authorisation

Administrative Authorisation enables Connection Contract with Transco

Administrative process (*) different according to Regions

Recently, new national regulation oriented to control of generation to be connected per year, securing economic and technical sustainability (National Administration)

Page 10: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

10

Access and Connection : Overview

Procedures

Access Application (m = month)

Connection to Transmission >>> SO (REE)

Connection to Distribution (> 10 MW.) > DO> SO (REE)

REE issues a report evaluating access feasibility, fulfilling system security criteria

Connection Application >>> Trans.Co.

Agent submits engineering Project and Programme

Trans.Co. elaborates Report of Technical Conditions for Connection

SO (REE) supervises and issues a report

Agent < TECHNICAL ACCESS CONTRACT> Transmission Company

2m

1m1m

Page 11: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

11

Access approach for special generation REE carries out Regional studies assessing capacity connection for

generation (depending on energy source and technology), which are sent and presented to Regional Adm.

Individual Applications: Access reply is informative not valid for connection procedure

Regional Adm. Identify (*) generators according and nominates Coordinator

Coordinator submits access application with the aggregation of individual plants sharing connection point and facilities

REE replies according to the Regional study, accomplishing access procedure and enabling to start and accomplish connection procedure: Connection Authorisation

Connection Authorisation enables Administrative Authorisation

Administrative Authorisation enables Access Technical Contract with Transco

Administrative process (*) different according to Region

Page 12: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

12

Regulation for connection and Administrative Authorisation for Special Regime (renewable) units

Report by SO: Acess,

connection, integrat. at Control

Center and Operating

procedures fulfillment

Connection Contract

Definitive Inscription (after 85% of objective

final date)

Previous Inscr. In Register

Administrative Authorisation

Electrical Procedures

Regional administrative Authorization

Connection

CommissioningGUARANTEECANCELATION

Special Regime Register (Spanish Industry Ministry)

An additional bank Guarantee is required by National Administration

Access

Authorisation PESp

Application

Bank Guarantee to cover TSO access + connection

management expenses

Commissioning Certificate

Requirements

Production Control Checks

Access

Coordinated Application

Page 13: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

13

NºNodesRdT Today Future

220 & 400 kV 49 > 100

Grid development

WIND POWER: High presence in

transmission (>60%, contrary to

other systems with high penetration)

and expected to increase

3.830 MW

4.293 MW2.960 MW

250 MW

Grid Applications: 14.730 MW

T: 11.583 MW

D: 3.147 MW

150 MW 250 MW

41 MW

435 MW

49 MW

22 MW

400 MW

100 MW

1.800 MW

150 MW

SOLAR POWER:

TS.- Majoritary in transmission (≈ 80%)

FV.- Minoritary in transmission(≈ 5% of

existing; few new plans)

Page 14: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

VCONEJOS

RIBARROJA

LAFORTUNA

ELBROSQUIL

CASARES

SABON

MARINA

AGUAYO

ANLLARES

APARECIDA

BOIMENTE

CARTELLE

COMPOSTILLA

ELPALO

PESOZ

GRADO

LALOMBA

LAROBLA

LADA

MASGALAN

MONTEARE

NARCEA

SANZO SALAS

VELILLA

VILECHA

VILLAMECA

ALMAZAN

SENGRACIA

AZPEITIA

ARRUBAL

CASTEJONELEREBRO

LAGOAÇA

CRODRIGO

GRI JOTA

HERNANI

HERRERA

HINOJOSA

ICHASO

LASERNA

MURUARTE

OLMEDOOLMEDO

SAUCELLE

VILLARIN

VIRTUS

VITORIA

ARAGON ASCO

B EG UES

BESCANO

CCTELNOU

C .BARBA

ESPLUGA

CALDERS

ESCATRON

MEZQUITA

LLOGAIA

S. PALLARS

MEDINACELI

OSERA

MUNIESA

PENAFLOR

PEÑALBA

G ARRAF

RIUDARENES

RAMIS

P IER OLARUEDA

SALLENTE

G RA MANET

TERRER

MUDEJAR TERUEL

MAIALS

VANDELLO

ALMARAZ

A NC HUELO

ROMICA

ALANGE

VVA ESCUDEROS

ASOMADA

AYORAAYORA

CASTELLON

CEDILLO

COFRENTES

COLOREJA

CORTESII

NESCOMBRERAS

FUENTES ALCARRIA

BELINCHON

PEÑARRUBIA

MANZANARES

G AL AP AGAR

LASTRAS

L OEC HES

TOTANA

MORELLASALSADELLA

LAMUELA

MINGLANILLA

MO RALEJ A MO RATA

OLMEDILL

PALMARPALMAR

T VELAS CO

PINILLA

REQUENA

PINOFRANQUEADO

ROCAMORA

SEGOVIA

TORRENTE

C EREAL

TRILLO

T ORR ECI LLA

GAUSA

V ILL AVE RDE

ARCOSFRT

BRAZATORTAS

ARCHIDONA

SIBALBOA

GBRALTAR

GUADAME

CARTAMA

BIENVENIDA

BROVALES

BAZA

HUENEJA

CARTUJA

J ORDANA

ARENAL

LITORAL

SAN SERVAN

CABRA

PINARREY

VALDECABALLEROS

CARMONA

TARIFA

PTOCRUZ

ALQUEVA

LINDOSO

FALAGUEIRA

ARGIA

BAIXAS

AGUAYO

AMEIXEIRAS

ACERIASA

ALBARELL

APARECIDA

ASTILLER

A.ZINC

BELESAR

ABOÑO

DUMBRIA

EIRIS

CARRIO

CHANTADACHANTADA

CACICEDO

CARTELLE

CAMBADOS

CASTRELO

CILLAMAYOR

CONSO

CORNATEL

CTCOMPOSTILLA

FRIEIRA

LAGRANDA

GRELA-2

LALOMBA

LUBIAN

MATAPORQUERA

MASGALAN

MEIRAMA

MONTEARENAS

MDCARRIO

MONTOUTO

MTESLEON

ONDINAS

P.BIBEY

CANDO

PDEMOURO

PEÑADRADA

PEREDA

PRADA

P.E.SIL

PSMIGUEL

PUERTO

QUERENO

REMOLINA

RIBADELAGO

S.AGUSTIN

CAYETANOCAYETANO

S.ESTEBAN

S.MARINA

S.PEDRO

SANABRIA

SANCOMPO

SANTIAGO

SIDEGASA

SIERO

SNIACE

SOBRADELO

SOTORIBERA

SOUTELO

SUIDO

TABIELLA

TELLEDO

TIBO

TRASONA

CICERO

TRIVES

UNINSA

GUARDO

VELLE

VILLABLINO

VIMIANZO

MAZARICOARISTRAIN

ALCARAMA

ALDEADAVILA

ALI

AYALA

ELCERRO

CASTRO

ELGEA

CORDOVILLA

FORJASGAMARRA

ALCOMOLAALCOMOLA

GAROÑA-BARCINA

HERNANI

HERRERA

ICHASO

IRUN

J UNDIZ

LAGUARDIALORA

LASERNA

MAZORRAS

LOGROÑO

MERCBENZ

MEDINA

MIRANDA

MUDARRAI

ORCOYEN

OLITE

ORMAIZTEGUI

MURUARTE

PASAJES

POZASAL

QUEL

P.POZA

RENEDORICOBAYO

SANGUESA

SANTIZ

SAUCELLE

SENGRACIA

SEQUERO

TAFALLA

TORDESILLAS

TUBACEXTUBOS

TUDELA

MONDRAGON

LAOLMA

VALLEJERA

VALPARAISO

VILLALBILLA

VILLAMAYOR

VILLARINO

VITORIA

ZAMORA

ZUMARRAGA

A BRERA

ADRALL

A.GURREA

ESCALDES

ASCO

ALMUDEVAR

A ENO E STE

ATALAYA

B ADA LONA

ALBATARREC

LA SELVA

A NO IABAYO

BELLI CENS

B SO N UEVO

B EG UES

BESCANO

BIESCAS

CABEZOSR

CALAMOCHA

C AN YET

A ENAE S TEA ENAE S TE

CARTUJOS

G AVA

C AS TE LLET

C ELSA

CENTELLES

C SBI SBAL

E IX AMPLE

ELOLIVAR

ENTRERRIOS

SESUE

ERISTE

ESCALONA

ESCATRON

ESPARTAL

F OI X

F RAN Q UE S ES

FUENDETODOS

GRADO

G UI X I ERES

GURREA

J ALON

J UIA

J UNEDA

LAROCA

LANZASAGUDAS

L ES CO RT

VIENTOS

L.LEONES

LLAVORSI

LOSVISOS

MANGRANERS

TORSEGRE

MAGALLON

MAN FI GUER ES

MARA GALL

MARIA

MATA

MEDIANO

MEQUINENZA

MEZQUITA

C ERV ELLO

MONCAYO

MONTBLANC

MONTETORRERO

AVEZARAG

MONZON

CINCA

ELS AUBALS

MORALETS

N UD O VI AR

ONCALA

T ANGC ATA

P ALAU

PEÑAFLOR

PERAFORT

P IER OLA

PLAZA

POLA

PUIGPELAT

R .CALDES

REPSOL

R MART ORELL

R UBI

RIOGALLEGO

R UBI O

C AN J ARDI

S .A ND REU

V IL ADEC ANS

S .BOIS .BOI

S .CUGAT

S.CELONI

S .J US T

S .FO ST

S ABA DSUR

SABIÑANIGO

S ENTM ENAT

S UBI RATSS UBI RATS

CERCS

B ARO VIVER

TARDIENTA

TABESCAN

CONSTANTI

TARRAGONATARRAGONA-G

T RI NI TAT

TARRAPOWER

T RS NT BOI

ELVENTERRO

TREVAGO

VANDELLOS

U RG ELL

VIC

P E NE DES

VILLANUEVA

Z .FR ANCAZAL

V ILA NO VA

ACECA

ALARCOS

ALBAL

A LG ETE

ALDAYA

ARANJUEZ

ALMARAZ

AÑOVER 2

AÑOVER

A RG ANDA

AZUTAN

A LCO BENDAS

A RR. VEGA

AZCA

BECHI

BENEJ AMA

ALBURQUERQUE

A RAVACA

B OAD ILLA

BOLARQUEA GU ACATE

BENIFERRI

C ERP LATA

C .F REGACC .F REGAC

CACERES

R-C.REAL

CAMPOAMOR

C EREAL

C ANI LLE J AS

CANTALAR

C OS LADA

ARGAMASILLA

CASATEJ ADA

C VAL MANZ

SIDMED

ELGRAO

E LCOTO

EALMARAZ

NOVELDA

BAJ O SEGURA

ELI ANA

ELCHE2

ELEMPERADOR

E LPI LAR

E RVAL DEM

ESCOMBRERAS

L AES TRE

FAUSITA

F.S.LUIS

F.MUESTRAS

F ORT UNA

F UENCARRAL

F TECI LLA

G.GALAN

G AL AP AGAR

G ET AFE

GUIJ OG.

D AG ANZO

E LHO RNI LLO

HUELVESI NGENIO

ALAMEDA

J .CABRERA

LAPALOMA

LA NAVA

L UCERO

MADRIDEJOS

MAJ AD AH O NDA

MBE CE RRAMBE CE RRA

MECO

MELA NCOL

MI RAS IE RRA

MO RATA

A RDO Z

HOYAMORENA

N OR TE

MTEBELLO

OLMEDILLA

OTERO

P RADS ANT

PALMAR

P ARAC UELLO S 1

PALMERAL

PATRAIX

PETREL

P ERALES

P OL I GO NC

PICON

P RO S P ERI

P ARL A O ES TE

T VELAS CO

P RI NCES AP RI NCES A

P S FER NANDO

QUARTPOB

PLASENCIA

R ETAMAR

R IVAS

P RAH O NAL

ROJ ALES

S.VICENT

SMSALINAS S.

S.P.PINATAR

SAGUNTO

SANTAPOLA

SEGORBE

S IMANCAS

TORREJON

TORRENTE

TORRI JOS

T 3CAN TOS

VALDECANVALDECANVALDECAN

V ALDE MORO

V ALD RIVA

V ALLECAS

VALLDUXO

V ENTAS

VILLARES

TRILLO

ACERINOX

ARROYOVALLE

ALCORES

ALGECIRA

ALHAURIN

ALMODOVAR

ALVARADO

ANDUJAR

ATARFE

BALBOA

BRAZATORTAS

CARTAMA

CADIZ

CARTUJA

CASARES

CASILLAS

SALTERAS

COSTASOL

COSTALUZ

ARENAL

DRODRIGO

ELCOGAS

ENCE

DOSHMNAS

GABIAS

FACINAS

CAPARACENA

FARGUE

SAN SERVAN

GUADAME

BENAHAVIS

GUILLENA

J ORDANA

MONTEBAJO

MERIDA

VENTILLA

OLIVARESOLIVARES

ONUBA

PARRALEJO

ORGIVA

GAZULES

PINARREY

PALOS

PURMARIAPURMARIA

POLIGONO

PTOREAL

P.LLANO

ROCIO

SANTIPON

S.ELVIRA

CARMONA

SIDERAND

TAJOENCANTADA

PTOCRUZ

TORARENILLAS

UBEDA

VENTAINES

VNUEVREY

S.ROQUES.ROQUE

BEMPOSTA

POCINHO

ARGIA

PRAGNERES

MANZANARES

N.CASARES

TORRVEGA

TALQUEVA

PALMAR

TPALENCIA

TCASARES

V ICALVAR

SANTURCEZIERBENA

ALONSOTEGUI

BASAURI

GATICA

GUEÑES

NERVACERO

ORTUELLA

SANTURCE

SIDENOR

ACEBIZKBABCOCK

ABANTOELABRA

ZAMUDIO

AMOREBIETA

ABADIANO

SAX

ALCUESCAR

VAGUADAS

CARRIO

AZAHARA

BENICARLO

OROPESA

COSTA VERDE

QUINTOS

VILANOVA

CAMPANARIO

VALLDIGNA

GANDIA

P.TABERNES

BENICULL

VERGEL

TORREVIEJA

CATADAU

V ENDR ELL

SABON

MORA

OLMEDILLA

PUENTELA

LANCHA

PUEBLA DE GUZMAN

HI JAR

SOLORZANO

BENADRES

PENAGOS

PENAGOS

LAPOBLA

LAPLANA

LOURIZAN

PAZOSBORBEN

J M.ORIOLJ M.ORIOL

STAPONSA

ATIOS

J I J ONA

TOMEZA

ALUMINIO

ESQUEDAS RAMIS

MUDARRA

OTERO

ESPLUGA

ARENALES TRUJ ILLO

N C.COLON

T VELAS CO 2

P ARAC UELLO S 2

C AN R IG ALT

G RA MANET

C DI M AGEN

C AS AC AMPO

CORNIDO

P.G.RODRIGUEZP.G.RODRIGUEZ

VILLAGARCIA

LARACHA

MESON VENTO

VENTORRILLO

N. VIGO

BALAIDOS

S.CLAUDIO

PIELAGOS

ABERIN

LAS LLANAS

EZCABARTE

CRODRIGO

LAGUNA

CORCOS

VILLIMAR

SANLUCAR

MONTEALEGRE

GIBALBIN

ALCOLEA

MAZUELOS

CORNISA

MONTI JO

RODANDAL

L.MONTES

EUROPACENTRO

TORREMOLINOS

ENSANCHE

URSO

PUENTE GENIL

GUADAIRA

PADUL

BENAHADUX

CORBONES

COSARIO

CARDIEL

ULEA

BALSICASMURCIA

MAR MENOR

ALCIRA

ABANTO

SUPERNORTEILIPA

PALACIOS

VIRGENRO

ESPARTINASSTABARBARA

RANILLAS

EMPALME

B UE NA VI STA

T RI GALES

V .A RC IP RES TE

L AS MATAS

A LCAL A I I

C AMA RMA

ME D I O DI A

R ETI RO

L IS TA

ARKALE

PARLA

CAMPOMAYOR

STA. TERESA VALDEPEÑAS

CARRASES

PUZOL

CABO HUERTASALTET

RABASA

ALICANTE

TORREMENTORREMEN

PQ. CABECERANOUMOLES

VIVEROS

LA TORRE

VINAROZ

F ACU LTAT

L ES S EPS

C OD ON YER

C ERDA

V ALD O NC ELLES

C ORN ELLA

C OLLBLANC

SERRALLO

BURRIANA

MONCOFAR

MORVEDREMORVEDRE

MAIMONA

BERJA

P.SUERT

PUJ ALT

VILLAJOYOSA

SMSALINAS N.

ARMUÑA DE TAJUÑA

EBORA

VALMOJ ADO

MONDAATANASIO

MANILVA

SALADAS

LAS ARROYADAS

TRENEDO

VILLATOROHARO

LARDERO

MATAPORQUERA

VALLE DEL NALON

S.MARCOS

ANTEQUERA

RODANDAL

V IL ADEC ANS

V ILL AVE RDEV ILL AVE RDEV ILL AVE R E S TE

BRIVIESCA

VILLARREAL SUR

C AN J AR DI 2

TJARA2TJARA1

CENTENARN.CENTENAR

ARNEVA

SOLORZANO

MO TO RS

MIRANDA

TSI DMED

ZARATAN

SORIA

VILLALLANA

PALENCIA

P RAD O LO NGO

LA RIBINA

S AGR ERA

NERJA

I LLE S CAS

N .S .C OLO MA

S .A.BARCA

S ARRIÁ

ANTEQUERA 2

J ANDULA

TAMON

SILVOTA

LITORAL

LUGO

LABARCES

TABERNASTABERNAS

PTO. LAPICE

VILLAMANIN

N. DUMBRIA

ESCUCHA

S. PALLARS

H OS PI TA LET

S ANTS

CALAMOCHA

SAMA

PQ. CENTRAL

V ERNE DA

S .COLO MA

L OS CERROS

C ONG OS TO

MER CAMA DR I D

V DCA RRO S

F UENL ABRADA

C AR PE TANI A

P I N TO AYUDEN

L EGAN ES

P IN TO

MO RALEJ A

V ILL AVI CI OS A

P Q I N G ENI

C OL IM PICA

C AMP ONAC

V ALD EBE BAS

L AS MER CEDES

H ORTA LEZA

S AN CHI NARRO

A ENA

P ARACU ELLOS

C DE P ORTI

B RU NE TE

S SRE YES

S SR EY ES 2

V ICALVAROP ALAFO X

MAZ ARRED

A RGA NZU ELA

L OS PRADI LLO S

S .RO Q UE

UNIVERSIDAD

CASTALLAPETREL ESTE

J I J ONA

MONTESA

TALCIRA

GANDIA SUR

PIÑOR

B ERRO CALES

L OE CH ES2

A NC HUELO

VILLALCASAYAGO

TURIS

SALSADELLA

ESTEPAR

BECILLA

VALLEGON

S .FE LIU

D ES VE RN

D ES VE RN

N .BARRIS

RAMBLETA

GUADAIRA

PONFERRADA

CRUZCAMPO

ATALAYA

STAJUSTA

ENTRENUCLEOS

BEJAR

CAÑAVERAL

LOSRAMOS

CARRIL

TURIS

ALFORJA

TAMON

PITAMO

F UENT E HI TO

CANTALEJO

PLATEA

DELTEBRE

LA PUEBLANUEVA

TALAVERA

SALADAS

ARAÑUELO

SESENA

LAJARA

I LLORA

MARISMAS

PALOMARES

ALJARAFE

CASAQUEMADA

OLVAN

S.COSTERA

CARIÑENA

MONZON I I

TABIELLA II

PIÑUEL

LA NAVA I I

ALMADEN

SAGRAJASSAGRAJAS

TAMBRE I I

MONTEDERRAMOS

T ORR ECI LLA

N.SALADAS

TAMBRE NUEVA

MONZON I I

TABIELLA II

BARRIOS

MORELL

ELS AUBALS

SECUITASECUITA

RES generation does not avoid distribution grid but requires transmission expansion, where the majority of Wind Power (>60%) and Solar Thermal (>80%) is expected. RES is a relevant motivation in the current Plan:

new lines and reinforcements for avoiding constrains operation

facilities associated to physical connection

Main challenges: Grid Development

Particular significance: Spain-France interconnection

H2016Approved may08. Reviewed 2010

≈ 8,000 M€

OH Circuit [km] 12.270UG Cables [km] 386Uprating lines [km] 8.308SS [nº bays *] 3.476Transformers [MVA] 52.450Reactors [Mvar] 2.800Capacitors [Mvar] 1.100

New substations and bays: Some 100 buses in 220 kV

and 50 in 400 kV

Page 15: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

Cost Allocation of New Facilities ¿transmission border and who pays what?

Investment CostOperation and

Maintenance Cost

Transmission Facilities

Directly associated to connection

Assumed by the agent System

Structural Reinforcement

System

(Agent guarantees 20% of Cost)System

Connection Facilities Agent

New bay

New substation

as in/out of

existing line

New

bay

Existing

Substation

TransGrid

Connection Facilities (no TransGrid)

Transmission grid development implications

Page 16: Access and Connection processes for Renewable Units: Experiences from Red Eléctrica de España Istambul March 2011.

RED ELÉCTRICA DE ESPAÑA

www.ree.es

Thanks for your attention! www.ree.es

www.esios.ree.es