Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T. Ladzinski In the name of the Access and Alarm Team 25/1/2011 1 LHC Performance WS Chamonix 2011
16

Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

Feb 27, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

Access and Alarm Safety Systems -Activities for the 2012/2013 Long Shutdown

By S. Grau, in collaboration with R. Nunes and T. LadzinskiIn the name of the Access and Alarm Team

25/1/2011

1

LHC Performance WS Chamonix 2011

Page 2: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

Table of contents

Activities of maintenance, consolidation, upgrades and new installations on:

1. Alarm systems2. Access systems

Impact on LHC activities – injector chain work

25/1/2011

2

LHC Performance WS Chamonix 2011

Page 3: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

MaintenanceAutomatic Fire Detection Systems

25/1/2011

3

LHC Performance WS Chamonix 2011

• Planning▫ 1/year, compulsory (IS37)▫ OK 9 weeks of Xmas Break for

underground installations▫ Quarterly maintenance: minimize

spurious alarms• Constraints

▫ Surface installations: Run & T. Stop• Potential Risks (if not done)

▫ Increase of latent faults => reduce safety and availability (spurious alarms)

• Impact if shutdown moves to 2013▫ Annual maintenance- Xmas Break▫ Quarterly maintenance- T. Stops

• Preventive maintenance▫ Visual inspection▫ Functional and alarm test▫ Cleaning of air sampling

networks▫ Replacement of components

Page 4: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

ConsolidationR2E relocation of fire detectors- Point 1/5/7

25/1/2011

4

LHC Performance WS Chamonix 2011

• Remove smoke detectors from radiation critical areas▫ RR13/17▫ RR53/57▫ UJ56▫ RR73/77▫ UJ76

• Planning▫ Long Shutdown▫ 3-4 weeks/item

• Constraints▫ Dependency with EN/EL▫ 2-3 days of service interruption (no

detection)

• Potential Risks (if not done)▫ Increase of detected/latent faults▫ SEE destructive events (CNRAD

test)

• Impact if shutdown moves to 2013▫ Partially implemented

Page 5: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

MaintenanceAutomatic Gas Detection Systems

25/1/2011

5

LHC Performance WS Chamonix 2011

• Preventive maintenance▫ Oxygen deficiency +

Flammable gases▫ Visual inspection▫ Functional and alarm test▫ Calibration of detectors▫ Replacement of components

• Planning▫ 1/year, compulsory (IS37)▫ OK 9 weeks of Xmas Break for

underground installations▫ Quarterly: minimize spurious alarms

• Constraints▫ Surface installations: Run & T. Stop▫ Intersite doors open

• Potential Risks (if not done)▫ Increase of latent faults => reduce

safety and availability (spurious alarms)

• Impact if shutdown moves to 2013▫ Annual maintenance - Xmas Break▫ Quarterly maintenance - T. Stops

Page 6: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

ConsolidationUnderground Gas centrals - Point 1 and 5

25/1/2011

6

LHC Performance WS Chamonix 2011

• Improvement at Point 1▫ Split USA15 gas central in 2

racks Currently saturated

• Improvement at Point 5▫ Split USC55 gas central in 2

racks Separation of Machine

/Experiment detection Currently saturated

• Planning▫ Long Shutdown▫ Several weeks/central

• Constraints▫ Detection interruption (UX15,

USA15, USC55, UXC55)▫ Important compensatory measures

and procedures

• Potential Risks (if not done)▫ Impossibility to add new

sensors/contacts

• Impact if shutdown moves to 2013▫ Implementation delayed

Page 7: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

MaintenanceEmergency Evacuation, Beam Imminent Warning

25/1/2011

7

LHC Performance WS Chamonix 2011

• Preventive maintenance▫ Visual inspection▫ Functional and alarm test▫ Sirens test together with ODH flash test

▫ Replacement of components

• Planning▫ 1/year, compulsory (IS37)▫ OK 2 weeks of Xmas Holidays

• Constraints▫ During “Cold Gas He standby”▫ Intersite doors open▫ Nobody in the machine/experiments

• Potential Risks (if not done)▫ Increase of latent faults => reduce

safety and availability

• Impact if shutdown moves to 2013▫ Annual maintenance-Xmas Holidays

Page 8: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

MaintenanceSNIFFER – fire and gas detection inside Experiments

25/1/2011

8

LHC Performance WS Chamonix 2011

• Preventive maintenance▫ Visual inspection▫ Functional and alarm test▫ Cleaning of air sampling

networks▫ Replacement of components

• Planning▫ 1/year, compulsory (IS37,

IEC61508)▫ Minimum 10 weeks (Xmas Break, T.

Stops)• Constraints

▫ Detection interruption per module▫ Accessibility to US15 required

• Potential Risks (if not done)▫ Increase of latent faults => reduce

safety and availability (spurious alarms)

• Impact if shutdown moves to 2013▫ Annual maintenance - Xmas Break

and Technical Stops

Page 9: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

• Preventive maintenance▫ Mechanical maintenance of

doors and access points▫ Acquisition chain tests (from

doors, power converters, dumps, etc... to PLC)

MaintenanceAccess –LASS/LACS

25/1/2011

9

LHC Performance WS Chamonix 2011

• Planning▫ 1/year (stated in “Regles Générales

d’Explotation LHC”)▫ OK 9 weeks of Xmas Break▫ Limiting other activities▫ Very important before start of the LHC

• Constraints▫ Reduced availability of access point▫ Dependencies with equipment groups▫ DSO tests (2 day, before restart)

• Potential Risks (if not done)▫ Increase of latent faults => reduce

safety and availability• Impact if shutdown moves to 2013

▫ During Xmas Break

Page 10: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

• Improvement of video system▫ Avoid image freezing▫ Improve fluidity of images Install encoders, review

archiving architecture (PAD)

• Improvement IT network▫ Increase PAD availability by

reducing dependency of network components

Consolidation - AccessVideo system and IT network

25/1/2011

10

LHC Performance WS Chamonix 2011

• Planning▫ Long Shutdown▫ Several months

• Constraints▫ Reduced availability of access point▫ Video: migration all at the same time▫ Network: design phase in

collaboration with IT, work mainly by IT

• Potential Risks (if not done)▫ -

• Impact if shutdown moves to 2013▫ Implementation delayed

Page 11: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

• Relocation of LACS racks▫ UJ56, UJ76

• Displacement of door▫ UJ561=YCPY01

Consolidation - AccessR2E effects on Access

25/1/2011

11

LHC Performance WS Chamonix 2011

• Planning▫ Long Shutdown▫ Several weeks/site

• Constraints▫ Dependencies with EL and IT▫ 3 days testing/site (no access on

concerned octant)

• Potential Risks (if not done)▫ Increase of latent faults, reduce

safety and availability

• Impact if shutdown moves to 2013▫ Partial implementation

Page 12: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

• Reliable acquisition of safety signals from “overpressure doors” and apply the necessary safety actions

New Installation - AccessInterlock of “overpressure doors”

25/1/2011

12

LHC Performance WS Chamonix 2011

• Planning▫ Long Shutdown▫ Several weeks/site

• Constraints▫ Risk analysis and specification

required▫ Work with TE/MPE for reliable

Power Interlock Controller link • Potential Risks (if not done)

▫ Major He Release containment during magnets powering

▫ Ensure correct ventilation path for tunnel activated air

• Impact if shutdown moves to 2013▫ Implementation delay

Page 13: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

• Allow for maintenance in external envelope during run periods (PM Shafts)▫ Additional temporary

physical barrier▫ Absence of constraints during

Technical Stops

New Installation - AccessAccess envelope modification

25/1/2011

13

LHC Performance WS Chamonix 2011

• Planning▫ Long Shutdown▫ Several weeks/Top of Pit access

point

• Constraints▫ Technical solution to be defined▫ Possible impact on civil engineering

GS/SE

• Potential Risks (if not done)▫ Reduces availability of access system

• Impact if shutdown moves to 2013▫ Implementation delayed

Page 14: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

New Installation - AccessNew access point in TZ32 and PZ65

25/1/2011

14

LHC Performance WS Chamonix 2011

• TZ32 – CLIC alignment▫ New access zone

• PZ65 – when PM65 unavailable▫ New access point

• Planning▫ Long Shutdown▫ Several item

• Constraints▫ PZ65- to be approved▫ Possible impact on civil engineering ▫ Dependencies with EL, MME

(integration)

• Potential Risks (if not done)▫ Reduces availability of access system

• Impact if shutdown moves to 2013▫ Implementation delayed

Page 15: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.

PS work – impact on LHC activities

25/1/2011

15

LHC Performance WS Chamonix 2011

• PS Primary Areas Access Renovation▫ New access control system

(doors, access points) ▫ New access safety system

(interlocks)▫ Deployment of a Beam

Imminent Warning and Evacuation system

• Resources▫ The same team as for the LHC

• Impact if shutdown moves to 2013▫ Positive impact: more time to

validate the new system and prepare the migration

Page 16: Access and Alarm Safety Systems · 2011. 11. 23. · Access and Alarm Safety Systems - Activities for the 2012/2013 Long Shutdown By S. Grau, in collaboration with R. Nunes and T.