Top Banner
6 0 . 0 m 70 . 0 m 80 . 0 m 80 . 0 m 80 . 0 m 90 . 0 m 90 . 0 m 9 0 . 0 m E AP E AP MAP MAP MAP EAP EAP MAP E AP E AP EAP EAP 7 6 + 000 77 + 000 78 + 000 79 + 000 80 + 000 81 + 000 82 + 000 83 + 000 84 + 000 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 080 - S7 Po r t wa y F a r m AT S 077-L1 Calvert Cutting 082-L3 Twyford Cutting Embankment 082-L2 Cowley Chainage 76 + 800 76 + 900 77 + 000 77 + 100 77 + 200 77 + 300 77 + 400 77 + 500 77 + 600 77 + 700 77 + 800 77 + 900 78 + 000 78 + 100 78 + 200 78 + 300 78 + 400 78 + 500 78 + 600 78 + 700 78 + 800 78 + 900 79 + 000 79 + 100 79 + 200 79 + 300 79 + 400 79 + 500 79 + 600 79 + 700 79 + 800 79 + 900 80 + 000 80 + 100 80 + 200 80 + 300 80 + 400 80 + 500 80 + 600 80 + 700 80 + 800 80 + 900 81 + 000 81 + 100 81 + 200 81 + 300 81 + 400 81 + 500 81 + 600 81 + 700 81 + 800 81 + 900 82 + 000 82 + 100 82 + 200 82 + 300 82 + 400 82 + 500 82 + 600 82 + 700 82 + 800 82 + 900 83 + 000 83 + 100 83 + 200 Horizontal Alignment L = 365 . 0 R=7285.0 L=673.8 L = 365 . 0 L=535.0 L = 365 . 0 R=-7280.0 L=2603.5 L = 365 . 0 L=615.0 L = 375 . 0 R=8255.0 L=4510.4 Vertical Alignment L = 7 7 9 . 6 G = 0 . 650 % L=340.0 R=40000.0 L = 1779 . 6 G = - 0 . 200 % L=224.1 R=-56000.0 L = 5344 . 7 G = 0 . 200 % Existing Level 78 . 5 79 . 3 79 . 5 77 . 8 79 . 2 81 . 9 84 . 3 85 . 2 86 . 2 87 . 2 88 . 5 89 . 4 90 . 5 89 . 2 87 . 6 86 . 9 86 . 8 86 . 5 86 . 4 85 . 9 85 . 8 86 . 1 88 . 1 90 . 1 89 . 2 88 . 5 87 . 8 88 . 4 88 . 0 89 . 1 90 . 4 90 . 2 90 . 7 88 . 8 88 . 1 88 . 5 88 . 7 88 . 3 87 . 3 87 . 1 87 . 0 84 . 4 86 . 5 85 . 5 85 . 0 86 . 6 85 . 8 82 . 8 82 . 5 82 . 9 83 . 3 83 . 8 84 . 1 84 . 0 83 . 2 83 . 0 83 . 6 85 . 0 86 . 4 87 . 7 88 . 5 89 . 8 90 . 7 91 . 4 90 . 9 Proposed Level 80 . 9 81 . 6 82 . 2 82 . 9 83 . 5 84 . 2 84 . 8 85 . 4 85 . 8 85 . 9 85 . 8 85 . 6 85 . 4 85 . 2 85 . 0 84 . 8 84 . 6 84 . 4 84 . 2 84 . 0 83 . 8 83 . 6 83 . 4 83 . 2 83 . 0 82 . 8 82 . 6 82 . 4 82 . 2 82 . 1 82 . 3 82 . 5 82 . 7 82 . 9 83 . 1 83 . 3 83 . 5 83 . 7 83 . 9 84 . 1 84 . 3 84 . 5 84 . 7 84 . 9 85 . 1 85 . 3 85 . 5 85 . 7 85 . 9 86 . 1 86 . 3 86 . 5 86 . 7 86 . 9 87 . 1 87 . 3 87 . 5 87 . 7 87 . 9 88 . 1 88 . 3 88 . 5 88 . 7 88 . 9 89 . 1 + 2 . 4 + 2 . 3 + 2 . 7 + 5 . 1 + 4 . 3 + 2 . 3 + 0 . 5 + 0 . 2 + 0 . 1 + 0 . 1 + 2 . 9 + 3 . 4 + 3 . 2 + 3 . 0 + 2 . 7 + 2 . 6 + 2 . 9 + 3 . 9 + 4 . 3 + 3 . 9 + 2 . 7 + 1 . 5 + 0 . 4 Cut and Fill - 0 . 4 - 1 . 3 - 2 . 7 - 3 . 8 - 5 . 1 - 4 . 0 - 2 . 6 - 2 . 1 - 2 . 2 - 2 . 1 - 2 . 2 - 1 . 9 - 2 . 0 - 2 . 5 - 4 . 7 - 6 . 9 - 6 . 2 - 5 . 7 - 5 . 2 - 6 . 0 - 5 . 8 - 7 . 0 - 8 . 1 - 7 . 7 - 8 . 0 - 5 . 9 - 5 . 0 - 5 . 2 - 5 . 2 - 4 . 6 - 3 . 4 - 3 . 0 - 2 . 7 - 1 . 8 - 0 . 6 - 1 . 3 - 0 . 3 - 0 . 2 - 1 . 3 - 2 . 0 - 2 . 5 - 1 . 8 400km/h Route Element ID Design Speed 082-L1 Twyford Viaduct 080-L1 Twyford Embankment Embankment 074-L5 Grendon Underwood 079 - S7 Sh e ph e r d s F u r ze I nv e r t e d Si phon 081 - S6 Po r t wa y Cu l v e r t 082 - S6 T wy f o r d W e s t Cu l v e r t 076 - S7 Sh ee phou s e W ood Sou t h Cu l v e r t 077 - S1 Sh ee phou s e W ood No r t h Cu l v e r t Ov e r b r i dg e 077 - S2 F oo t p a t h SCL / 13 Gr ee n 078 - S2 Ca l v e r t Gr ee n Ov e r b r i dg e 079 - S1 Sc hoo l Hill Gr ee n Ov e r b r i dg e 080 - S1 EW R Ov e r b r i dg e 080 - S4 Pe rr y Hill Ov e r b r i dg e 081 - S1 W e s t St r ee t Ov e r b r i dg e 081 - S4 T wy f o r d Ea s t Cu l v e r t Acc o mm od a ti on Ov e r b r i dg e 083 - S1 Re s t r i c t e d By wa y PBI / 5 A Acc o mm od a ti on Ov e r b r i dg e 078 - S3 Ca l v e r t Si d i ng s W W W W PSTN W W W W W W W W W W W W W W W W W W S W 0 500 200 100 1000 @ 1:10000 METRES 0 100 50 20 10 @ 1:1000 METRES Scale H 1:10000 V 1:1000 Profile Scale 1:10000 Plan CALVERT TWYFORD HS2 Alignment 26/02/2016 TB Civil Atkins Main Line C222-ATK-CV-DPP-020-000009-FPD A1 AS SHOWN Country South Country South Design F o r Con ti nu a ti on Re f e r T o Sh e e t 27 F o r Con ti nu a ti on Re f e r T o Sh ee t 29 Chainage 76+800 to 83+200 Sheet 28 HMG 29/02/16 FINAL PRELIMINARY DESIGN P01 P01 For Continuation Refer to Drawing C222-ATK-CV-DPP-020-000015-FPD . Mitigation Structure 076-S8 Sheephouse Wood For Acceptance AAR RP 26/02/16 AAR 26/02/16 RP Fit for Acceptance Drawn Checked Approved Drawing No. Date Scale Size Rev. Drawn Rev Description Project/Contract Discipline/Function Zone Creator/Originator Legends/Notes: Drawing Title Design Stage HS2 App Con App Checked Scale with caution as distortion can occur. may be used for legal or other official purposes. Only an official copy of a title plan or register obtained from the Land Registry sold or published without the formal permission of Land Registry. This material was last updated on 2015 and may not be copied, distributed, Registry under delegated authority from the Controller of HMSO. ' Crown Copyright material is reproduced with the permission of Land Ordnance Survey Licence number 100049190 ' Crown Copyright and database right 2015. All rights reserved. or if it is issued in part or issued incompletely in any way. the reproduction of this document after alteration, amendment or abbreviation HS2 accepts no responsibility for any circumstances which arise from London, E14 5AB One Canada Square, Registered office: Registration No. 06791686 Registered in England Tunnel portal Ditches - new Tunnels external extent Woodland habitat creation Wetland habitat creation Grassland habitat creation Ecological mitigation pond HS2 Access road Watercourse diversion Electricity substation Balancing pond Noise fence barrier Replacement floodplain storage Land drainage area (scrub / woodland) Landscape mitigation planting Main utility works County boundary Borough / District boundary Community forum boundary Rail alignment Rail alignment formation Landscape earthworks Engineering earthworks 10 + 000 Stopped-up PRoW Hedgerow habitat creation Grassed areas Sustainable placement Public realm (PRoW) Existing public right of way PRoW New, diverted or realigned (e.g. 10+000) Chainage Existing watercourse or portal building Depot, station, headhouse development use Returned to suitable Accommodation Overbridge Restricted Byway PBI/5A Overbridge Perry Hill Overbridge West Street R e - a li gn m e n t A y l e s b u r y L i nk Overbridge Calvert Green Green Overbridge Footpath SCL/13 Twyford Viaduct Overbridge Addison Road Siding Waste Transfer Re-alignment Aylesbury Link Underbridge Charndon Lodge Bletchley Line Bicester to Maintenance Depot Calvert Infrastructure Overbridge Southern Access Maintenance Depot Infrastructure Southern Access Maintenance Depot Infrastructure Mitigation Structure Sheephouse Wood Realignment Perry Hill Line Realignment Bicester to Bletchley Station Auto Transformer Portway Farm Access Sewage Works Overbridge Green School Hill Overbridge Accommodation Calvert Sidings East-West Rail Overbridge Gas Pumping Station Code 1 - Accepted
1

Accepted - gov.uk · 082-L3 Twyford Cutting 077-L1 Calvert Cutting Embankment 082-L2 Cowley ... Drawing Title Checked Con App HS2 App Scale with caution as distortion can occur.

Apr 27, 2018

Download

Documents

vuonghanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Accepted - gov.uk · 082-L3 Twyford Cutting 077-L1 Calvert Cutting Embankment 082-L2 Cowley ... Drawing Title Checked Con App HS2 App Scale with caution as distortion can occur.

60.0m

70.0m

80.0

m

80.0

m

80.0

m

90.0m

90.0m

90.0m

EAP

EAP

MAP

MAP

MAP

EAP

EAP

MAP

EAP

EAP

EAP

EAP

76+000

77+000

78+000

79+0008

0+000

81+000

82+000

83+000

84+000

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

080-S

7 P

ort

way F

arm A

TS

077-L1 Calvert Cutting082-L3 Twyford CuttingEmbankment

082-L2 Cowley

Chainage

76+800

76+900

77+000

77+100

77+200

77+300

77+400

77+500

77+600

77+700

77+800

77+900

78+000

78+100

78+200

78+300

78+400

78+500

78+600

78+700

78+800

78+900

79+000

79+100

79+200

79+300

79+400

79+500

79+600

79+700

79+800

79+900

80+000

80+100

80+200

80+300

80+400

80+500

80+600

80+700

80+800

80+900

81+000

81+100

81+200

81+300

81+400

81+500

81+600

81+700

81+800

81+900

82+000

82+100

82+200

82+300

82+400

82+500

82+600

82+700

82+800

82+900

83+000

83+100

83+200

Horizontal Alignment

L=365.0R=7285.0

L=673.8L=365.0L=535.0

L=365.0R=-7280.0

L=2603.5

L=365.0L=615.0

L=375.0R=8255.0

L=4510.4

Vertical Alignment L=779.6

G=0.650%

L=340.0

R=40000.0

L=1779.6

G=-0.200%

L=224.1

R=-56000.0

L=5344.7

G=0.200%

Existing Level 78.5

79.3

79.5

77.8

79.2

81.9

84.3

85.2

86.2

87.2

88.5

89.4

90.5

89.2

87.6

86.9

86.8

86.5

86.4

85.9

85.8

86.1

88.1

90.1

89.2

88.5

87.8

88.4

88.0

89.1

90.4

90.2

90.7

88.8

88.1

88.5

88.7

88.3

87.3

87.1

87.0

84.4

86.5

85.5

85.0

86.6

85.8

82.8

82.5

82.9

83.3

83.8

84.1

84.0

83.2

83.0

83.6

85.0

86.4

87.7

88.5

89.8

90.7

91.4

90.9

Proposed Level 80.9

81.6

82.2

82.9

83.5

84.2

84.8

85.4

85.8

85.9

85.8

85.6

85.4

85.2

85.0

84.8

84.6

84.4

84.2

84.0

83.8

83.6

83.4

83.2

83.0

82.8

82.6

82.4

82.2

82.1

82.3

82.5

82.7

82.9

83.1

83.3

83.5

83.7

83.9

84.1

84.3

84.5

84.7

84.9

85.1

85.3

85.5

85.7

85.9

86.1

86.3

86.5

86.7

86.9

87.1

87.3

87.5

87.7

87.9

88.1

88.3

88.5

88.7

88.9

89.1

+2.4

+2.3

+2.7

+5.1

+4.3

+2.3

+0.5

+0.2

+0.1

+0.1

+2.9

+3.4

+3.2

+3.0

+2.7

+2.6

+2.9

+3.9

+4.3

+3.9

+2.7

+1.5

+0.4

Cut and Fill -0.4

-1.3

-2.7

-3.8

-5.1

-4.0

-2.6

-2.1

-2.2

-2.1

-2.2

-1.9

-2.0

-2.5

-4.7

-6.9

-6.2

-5.7

-5.2

-6.0

-5.8

-7.0

-8.1

-7.7

-8.0

-5.9

-5.0

-5.2

-5.2

-4.6

-3.4

-3.0

-2.7

-1.8

-0.6

-1.3

-0.3

-0.2

-1.3

-2.0

-2.5

-1.8

400km/h

Route Element ID

Design Speed

082-L1 Twyford Viaduct

080-L1 Twyford EmbankmentEmbankment

074-L5 Grendon Underwood

079-S

7 S

hepherds F

urz

e Inverted Sip

hon

081-S

6 P

ort

way C

ulvert

082-S

6 T

wyford W

est

Culvert

076-S

7 S

heephouse W

ood S

outh C

ulvert

077-S

1 S

heephouse W

ood N

orth C

ulvert

O

verbridge

077-S

2 F

ootp

ath S

CL/1

3 Gre

en

078-S

2 C

alvert Gre

en O

verbridge

079-S

1 S

chool

Hill

Gre

en O

verbridge

080-S

1 E

WR O

verbridge

080-S

4 P

erry Hill

Overbridge

081-S

1 W

est Street

Overbridge

081-S

4 T

wyford E

ast

Culvert

Acco

mm

odation O

verbridge

083-S

1 R

estricte

d B

yway P

BI/5

A

Acco

mm

odation O

verbridge

078-S

3 C

alvert Sidin

gs

W

W

W

W

PSTN

W

WW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

S

W

1970m

m INT

ERVA

L

NR60D

13.5 T

RANS

ITION C

ROSS

OVER

RE/PW /

2338

CEN56 CV10 25mph

1970m

m INT

ERVA

L

NR60D

13.5 T

RANS

ITION C

ROSS

OVER

RE/PW /

2338

0 500200100 1000

@ 1:10000METRES

0 100502010

@ 1:1000METRES

Scale H 1:10000 V 1:1000

Profile

Scale 1:10000

Plan

CALVERT

TWYFORD

HS2 Alignment

26/02/2016

TB

Civil

Atkins

Main Line

C222-ATK-CV-DPP-020-000009-FPD

A1AS SHOWN

Country South Country South Design

For

Continuation R

efer

To S

heet 27

For

Continuation R

efer

To S

heet 29

Chainage 76+800 to 83+200

Sheet 28

HMG

29/02/16

FINAL PRELIMINARY DESIGN

P01

P01

For Continuation Refer to Drawing C222-ATK-CV-DPP-020-000015-FPD

. Mitigation Structure 076-S8 Sheephouse Wood

For Acceptance

AARRP

26/02/16

AAR

26/02/16

RP

Fit for Acceptance

Drawn Checked Approved

Drawing No.

Date Scale Size

Rev.

DrawnRev Description

Project/Contract

Discipline/Function

Zone

Creator/Originator

Legends/Notes:

Drawing Title

Design Stage

HS2 AppCon AppChecked

Scale with caution as distortion can occur.

may be used for legal or other official purposes.

Only an official copy of a title plan or register obtained from the Land Registry

sold or published without the formal permission of Land Registry.

This material was last updated on 2015 and may not be copied, distributed,

Registry under delegated authority from the Controller of HMSO.

' Crown Copyright material is reproduced with the permission of Land

Ordnance Survey Licence number 100049190

' Crown Copyright and database right 2015. All rights reserved.

or if it is issued in part or issued incompletely in any way.

the reproduction of this document after alteration, amendment or abbreviation

HS2 accepts no responsibility for any circumstances which arise from

London, E14 5AB

One Canada Square,

Registered office:

Registration No. 06791686

Registered in England

Tunnel portalDitches - new

Tunnels external extentWoodland habitat creation

Wetland habitat creation

Grassland habitat creation

Ecological mitigation pond

HS2 Access road

Watercourse diversion

Electricity substation

Balancing pond

Noise fence barrier

Replacement floodplain storage

Land drainage area (scrub / woodland)

Landscape mitigation planting Main utility works

County boundary

Borough / District boundary

Community forum boundary

Rail alignment

Rail alignment formation

Landscape earthworks

Engineering earthworks

10+000

Stopped-up PRoW

Hedgerow habitat creation

Grassed areas

Sustainable placement

Public realm

(PRoW)

Existing public right of way

PRoW

New, diverted or realigned (e.g. 10+000)

Chainage

Existing watercourseor portal building

Depot, station, headhouse

development use

Returned to suitable

Accommodation Overbridge

Restricted Byway PBI/5A

Overbridge

Perry Hill

Overbridge

West Street

Re-alignment

Aylesbury Link

Overbridge

Calvert Green

Green Overbridge

Footpath SCL/13

Twyford Viaduct

Overbridge

Addison Road

Siding

Waste Transfer

Re-alignment

Aylesbury Link

Underbridge

Charndon Lodge

Bletchley Line

Bicester to

Maintenance Depot

Calvert Infrastructure

Overbridge

Southern Access

Maintenance Depot

Infrastructure

Southern Access

Maintenance Depot

Infrastructure

Mitigation Structure

Sheephouse Wood

Realignment

Perry Hill

Line Realignment

Bicester to Bletchley

Station

Auto Transformer

Portway Farm

Access

Sewage Works

Overbridge

Green

School Hill

Overbridge

Accommodation

Calvert Sidings

East-West Rail Overbridge

Gas Pumping Station

Code 1

- Acc

epted