6 0 . 0 m 70 . 0 m 80 . 0 m 80 . 0 m 80 . 0 m 90 . 0 m 90 . 0 m 9 0 . 0 m E AP E AP MAP MAP MAP EAP EAP MAP E AP E AP EAP EAP 7 6 + 000 77 + 000 78 + 000 79 + 000 80 + 000 81 + 000 82 + 000 83 + 000 84 + 000 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 080 - S7 Po r t wa y F a r m AT S 077-L1 Calvert Cutting 082-L3 Twyford Cutting Embankment 082-L2 Cowley Chainage 76 + 800 76 + 900 77 + 000 77 + 100 77 + 200 77 + 300 77 + 400 77 + 500 77 + 600 77 + 700 77 + 800 77 + 900 78 + 000 78 + 100 78 + 200 78 + 300 78 + 400 78 + 500 78 + 600 78 + 700 78 + 800 78 + 900 79 + 000 79 + 100 79 + 200 79 + 300 79 + 400 79 + 500 79 + 600 79 + 700 79 + 800 79 + 900 80 + 000 80 + 100 80 + 200 80 + 300 80 + 400 80 + 500 80 + 600 80 + 700 80 + 800 80 + 900 81 + 000 81 + 100 81 + 200 81 + 300 81 + 400 81 + 500 81 + 600 81 + 700 81 + 800 81 + 900 82 + 000 82 + 100 82 + 200 82 + 300 82 + 400 82 + 500 82 + 600 82 + 700 82 + 800 82 + 900 83 + 000 83 + 100 83 + 200 Horizontal Alignment L = 365 . 0 R=7285.0 L=673.8 L = 365 . 0 L=535.0 L = 365 . 0 R=-7280.0 L=2603.5 L = 365 . 0 L=615.0 L = 375 . 0 R=8255.0 L=4510.4 Vertical Alignment L = 7 7 9 . 6 G = 0 . 650 % L=340.0 R=40000.0 L = 1779 . 6 G = - 0 . 200 % L=224.1 R=-56000.0 L = 5344 . 7 G = 0 . 200 % Existing Level 78 . 5 79 . 3 79 . 5 77 . 8 79 . 2 81 . 9 84 . 3 85 . 2 86 . 2 87 . 2 88 . 5 89 . 4 90 . 5 89 . 2 87 . 6 86 . 9 86 . 8 86 . 5 86 . 4 85 . 9 85 . 8 86 . 1 88 . 1 90 . 1 89 . 2 88 . 5 87 . 8 88 . 4 88 . 0 89 . 1 90 . 4 90 . 2 90 . 7 88 . 8 88 . 1 88 . 5 88 . 7 88 . 3 87 . 3 87 . 1 87 . 0 84 . 4 86 . 5 85 . 5 85 . 0 86 . 6 85 . 8 82 . 8 82 . 5 82 . 9 83 . 3 83 . 8 84 . 1 84 . 0 83 . 2 83 . 0 83 . 6 85 . 0 86 . 4 87 . 7 88 . 5 89 . 8 90 . 7 91 . 4 90 . 9 Proposed Level 80 . 9 81 . 6 82 . 2 82 . 9 83 . 5 84 . 2 84 . 8 85 . 4 85 . 8 85 . 9 85 . 8 85 . 6 85 . 4 85 . 2 85 . 0 84 . 8 84 . 6 84 . 4 84 . 2 84 . 0 83 . 8 83 . 6 83 . 4 83 . 2 83 . 0 82 . 8 82 . 6 82 . 4 82 . 2 82 . 1 82 . 3 82 . 5 82 . 7 82 . 9 83 . 1 83 . 3 83 . 5 83 . 7 83 . 9 84 . 1 84 . 3 84 . 5 84 . 7 84 . 9 85 . 1 85 . 3 85 . 5 85 . 7 85 . 9 86 . 1 86 . 3 86 . 5 86 . 7 86 . 9 87 . 1 87 . 3 87 . 5 87 . 7 87 . 9 88 . 1 88 . 3 88 . 5 88 . 7 88 . 9 89 . 1 + 2 . 4 + 2 . 3 + 2 . 7 + 5 . 1 + 4 . 3 + 2 . 3 + 0 . 5 + 0 . 2 + 0 . 1 + 0 . 1 + 2 . 9 + 3 . 4 + 3 . 2 + 3 . 0 + 2 . 7 + 2 . 6 + 2 . 9 + 3 . 9 + 4 . 3 + 3 . 9 + 2 . 7 + 1 . 5 + 0 . 4 Cut and Fill - 0 . 4 - 1 . 3 - 2 . 7 - 3 . 8 - 5 . 1 - 4 . 0 - 2 . 6 - 2 . 1 - 2 . 2 - 2 . 1 - 2 . 2 - 1 . 9 - 2 . 0 - 2 . 5 - 4 . 7 - 6 . 9 - 6 . 2 - 5 . 7 - 5 . 2 - 6 . 0 - 5 . 8 - 7 . 0 - 8 . 1 - 7 . 7 - 8 . 0 - 5 . 9 - 5 . 0 - 5 . 2 - 5 . 2 - 4 . 6 - 3 . 4 - 3 . 0 - 2 . 7 - 1 . 8 - 0 . 6 - 1 . 3 - 0 . 3 - 0 . 2 - 1 . 3 - 2 . 0 - 2 . 5 - 1 . 8 400km/h Route Element ID Design Speed 082-L1 Twyford Viaduct 080-L1 Twyford Embankment Embankment 074-L5 Grendon Underwood 079 - S7 Sh e ph e r d s F u r ze I nv e r t e d Si phon 081 - S6 Po r t wa y Cu l v e r t 082 - S6 T wy f o r d W e s t Cu l v e r t 076 - S7 Sh ee phou s e W ood Sou t h Cu l v e r t 077 - S1 Sh ee phou s e W ood No r t h Cu l v e r t Ov e r b r i dg e 077 - S2 F oo t p a t h SCL / 13 Gr ee n 078 - S2 Ca l v e r t Gr ee n Ov e r b r i dg e 079 - S1 Sc hoo l Hill Gr ee n Ov e r b r i dg e 080 - S1 EW R Ov e r b r i dg e 080 - S4 Pe rr y Hill Ov e r b r i dg e 081 - S1 W e s t St r ee t Ov e r b r i dg e 081 - S4 T wy f o r d Ea s t Cu l v e r t Acc o mm od a ti on Ov e r b r i dg e 083 - S1 Re s t r i c t e d By wa y PBI / 5 A Acc o mm od a ti on Ov e r b r i dg e 078 - S3 Ca l v e r t Si d i ng s W W W W PSTN W W W W W W W W W W W W W W W W W W S W 0 500 200 100 1000 @ 1:10000 METRES 0 100 50 20 10 @ 1:1000 METRES Scale H 1:10000 V 1:1000 Profile Scale 1:10000 Plan CALVERT TWYFORD HS2 Alignment 26/02/2016 TB Civil Atkins Main Line C222-ATK-CV-DPP-020-000009-FPD A1 AS SHOWN Country South Country South Design F o r Con ti nu a ti on Re f e r T o Sh e e t 27 F o r Con ti nu a ti on Re f e r T o Sh ee t 29 Chainage 76+800 to 83+200 Sheet 28 HMG 29/02/16 FINAL PRELIMINARY DESIGN P01 P01 For Continuation Refer to Drawing C222-ATK-CV-DPP-020-000015-FPD . Mitigation Structure 076-S8 Sheephouse Wood For Acceptance AAR RP 26/02/16 AAR 26/02/16 RP Fit for Acceptance Drawn Checked Approved Drawing No. Date Scale Size Rev. Drawn Rev Description Project/Contract Discipline/Function Zone Creator/Originator Legends/Notes: Drawing Title Design Stage HS2 App Con App Checked Scale with caution as distortion can occur. may be used for legal or other official purposes. Only an official copy of a title plan or register obtained from the Land Registry sold or published without the formal permission of Land Registry. This material was last updated on 2015 and may not be copied, distributed, Registry under delegated authority from the Controller of HMSO. ' Crown Copyright material is reproduced with the permission of Land Ordnance Survey Licence number 100049190 ' Crown Copyright and database right 2015. All rights reserved. or if it is issued in part or issued incompletely in any way. the reproduction of this document after alteration, amendment or abbreviation HS2 accepts no responsibility for any circumstances which arise from London, E14 5AB One Canada Square, Registered office: Registration No. 06791686 Registered in England Tunnel portal Ditches - new Tunnels external extent Woodland habitat creation Wetland habitat creation Grassland habitat creation Ecological mitigation pond HS2 Access road Watercourse diversion Electricity substation Balancing pond Noise fence barrier Replacement floodplain storage Land drainage area (scrub / woodland) Landscape mitigation planting Main utility works County boundary Borough / District boundary Community forum boundary Rail alignment Rail alignment formation Landscape earthworks Engineering earthworks 10 + 000 Stopped-up PRoW Hedgerow habitat creation Grassed areas Sustainable placement Public realm (PRoW) Existing public right of way PRoW New, diverted or realigned (e.g. 10+000) Chainage Existing watercourse or portal building Depot, station, headhouse development use Returned to suitable Accommodation Overbridge Restricted Byway PBI/5A Overbridge Perry Hill Overbridge West Street R e - a li gn m e n t A y l e s b u r y L i nk Overbridge Calvert Green Green Overbridge Footpath SCL/13 Twyford Viaduct Overbridge Addison Road Siding Waste Transfer Re-alignment Aylesbury Link Underbridge Charndon Lodge Bletchley Line Bicester to Maintenance Depot Calvert Infrastructure Overbridge Southern Access Maintenance Depot Infrastructure Southern Access Maintenance Depot Infrastructure Mitigation Structure Sheephouse Wood Realignment Perry Hill Line Realignment Bicester to Bletchley Station Auto Transformer Portway Farm Access Sewage Works Overbridge Green School Hill Overbridge Accommodation Calvert Sidings East-West Rail Overbridge Gas Pumping Station Code 1 - Accepted