2/26
BriefbackgroundonDonMouthNaturaliza+onand
FloodProtec+onEA(DMNP
EA)
ReviewofRealignedAlterna+vesandPreliminary
Costs
FloodProtec+onPhasingOpportuni+es
Naturaliza+onofFloodplain Summary
Overview
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
3/26
KeyFeaturesof
DonWatershed
1. Watershedcovers
360sqkm
2. 200yearsofurbaniza+onfrom
southtonorth
3. Landuse:80%urban,
4%agriculture,&
16%naturalcover
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
4/26
ExtentofFloodingunderRegulatoryStorm
RegulatoryFlood
0
200
400
600
800
1000
1200
1400
1600
1800
normal 1 2 5 10 50 100 Hurricane
Flow
Ra
te(m3/s)
Flood Frequency (years)
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
5/26
Toestablishandsustaintheform,features,andfunc+onsofanaturalrivermouthwithinthecontext
ofarevitalizedCityenvironmentwhileprovidingflood
proteconuptotheRegulatoryFlood.
Naturalization Flood protectionRevitalized City
Environment
GoalofDonMouthNaturalizaonProject
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
6/26
DonMouthNaturalizaonProject
OriginalAlternaves-2008
Primary Flow West to IH
Primary Flow South & West toInner Harbour
Primary Flow South to Ship Channel
Ship ChannelInner Harbour
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
7/26
SummaryofStep4EvaluaonbyObjecve
DiagramtakenfromDonMouthNaturalizaonAndPortLandsFloodProteconProject,chapter5,table5-24
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
8/26
DMNPEA
Preferred4WS
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
9/26
AcviessinceEAsubmission
EAsubmi[edinDecember2010 Commentssubmi[edfromstakeholderstoMOEonEA
EAamendedinApril2011toaddressstakeholderconcerns
EAputonholdinJanuary2012un+lSeptember2012
PortLandsAccelera+onIni+a+vebeganinDecember2011toexploretheDMNPEAinthecontextofthefullPortLands
EAwillresumefollowingCityCouncildirec+on
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
10/26
ChangestoAlternavesAlternative 2 (Based on DMNP EA April 2011)
Move valley systemsouth to allow for
development north ofKeating Channel
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
11/26
ChangestoAlternavesAlternative 2 (Realigned)
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
12/26
Alternative 4W (Based on DMNP EA April 2011)
Move valley systemsouth to allow for
development north ofKeating Channel
ChangestoAlternaves
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
13/26
ChangestoAlternavesAlternative 4W (Realigned)
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
14/26
Promontorieseliminated to
avoid impact onshipping River mouth
phased toaccommodateexisting uses
Spillway moved toDon Roadway to
create largerdevelopment blocks
Valley system movednorth to create largerdevelopment blocks
Alternative 4WS (Based on DMNP EA April 2011)
ChangestoAlternaves
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
15/26
ChangestoAlternavesAlternative 4WS (Realigned)
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
16/26
GrossDevelopment
Area
Don RiverFloodplain
Area
NaturalizedArea
RealignedRealignedRealigned
PreliminaryCosting $400M $375M $350M
Comparisonof
Realigned
Alternaves
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
17/26
FloodProteconPhasing
Fullbuild-out
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
18/26
FloodProteconPhasing
Fullbuild-out
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
19/26
FloodProteconPhasing
Don Roadway and
eastern lands raised
Flood ProtectionLandform
Fullbuild-out
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
20/26
FloodProteconPhasing
Fullbuild-out
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
21/26
FloodProteconPhasing
Fullbuild-out
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
22/26
FloodProteconPhasing
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
23/26
NaturalizaonOpportunies
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
24/26
InSummary
Preliminaryresultssuggest: 4WSrealignedshouldbecarriedforwardandtheEA
completed
Firstphaseoffloodprotec+onwillprotectlandswestofCherryStreetnorthandsouthofPolsonQuay
Secondphaseoffloodprotec+onwillprotectover480acresfromfloodingeastofDonRoadway
Publicgreenspaceremainsacri+calelementoftheoverallPortLandsplan
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
25/26
FloodproteconandnaturalizaonMainTradingFloor
Businessanalysis:economics,marketandfinancingSideTradingFloor
PortLands101MainfloorStudio
Developmentplanningandphasing
ThirdFloor,Pa[yWa[Room
8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)
26/26
HAVEYOURSAY
Publicfeedbackworkshops:Tuesday,April36:30to9:30atSt.LawrenceHall