  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    1/26

    FloodProtec+onandNaturaliza+on

    AdeleFreemanTRCA

    KenDionTRCA

    DonHaleyTRCA

    PaulMurrayAECOM

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    2/26

    BriefbackgroundonDonMouthNaturaliza+onand

    FloodProtec+onEA(DMNP

    EA)

    ReviewofRealignedAlterna+vesandPreliminary

    Costs

    FloodProtec+onPhasingOpportuni+es

    Naturaliza+onofFloodplain Summary

    Overview

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    3/26

    KeyFeaturesof

    DonWatershed

    1. Watershedcovers

    360sqkm

    2. 200yearsofurbaniza+onfrom

    southtonorth

    3. Landuse:80%urban,

    4%agriculture,&

    16%naturalcover

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    4/26

    ExtentofFloodingunderRegulatoryStorm

    RegulatoryFlood

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    normal 1 2 5 10 50 100 Hurricane

    Flow

    Ra

    te(m3/s)

    Flood Frequency (years)

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    5/26

    Toestablishandsustaintheform,features,andfunc+onsofanaturalrivermouthwithinthecontext

    ofarevitalizedCityenvironmentwhileprovidingflood

    proteconuptotheRegulatoryFlood.

    Naturalization Flood protectionRevitalized City

    Environment

    GoalofDonMouthNaturalizaonProject

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    6/26

    DonMouthNaturalizaonProject

    OriginalAlternaves-2008

    Primary Flow West to IH

    Primary Flow South & West toInner Harbour

    Primary Flow South to Ship Channel

    Ship ChannelInner Harbour

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    7/26

    SummaryofStep4EvaluaonbyObjecve

    DiagramtakenfromDonMouthNaturalizaonAndPortLandsFloodProteconProject,chapter5,table5-24

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    8/26

    DMNPEA

    Preferred4WS

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    9/26

    AcviessinceEAsubmission

    EAsubmi[edinDecember2010 Commentssubmi[edfromstakeholderstoMOEonEA

    EAamendedinApril2011toaddressstakeholderconcerns

    EAputonholdinJanuary2012un+lSeptember2012

    PortLandsAccelera+onIni+a+vebeganinDecember2011toexploretheDMNPEAinthecontextofthefullPortLands

    EAwillresumefollowingCityCouncildirec+on

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    10/26

    ChangestoAlternavesAlternative 2 (Based on DMNP EA April 2011)

    Move valley systemsouth to allow for

    development north ofKeating Channel

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    11/26

    ChangestoAlternavesAlternative 2 (Realigned)

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    12/26

    Alternative 4W (Based on DMNP EA April 2011)

    Move valley systemsouth to allow for

    development north ofKeating Channel

    ChangestoAlternaves

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    13/26

    ChangestoAlternavesAlternative 4W (Realigned)

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    14/26

    Promontorieseliminated to

    avoid impact onshipping River mouth

    phased toaccommodateexisting uses

    Spillway moved toDon Roadway to

    create largerdevelopment blocks

    Valley system movednorth to create largerdevelopment blocks

    Alternative 4WS (Based on DMNP EA April 2011)

    ChangestoAlternaves

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    15/26

    ChangestoAlternavesAlternative 4WS (Realigned)

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    16/26

    GrossDevelopment

    Area

    Don RiverFloodplain

    Area

    NaturalizedArea

    RealignedRealignedRealigned

    PreliminaryCosting $400M $375M $350M

    Comparisonof

    Realigned

    Alternaves

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    17/26

    FloodProteconPhasing

    Fullbuild-out

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    18/26

    FloodProteconPhasing

    Fullbuild-out

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    19/26

    FloodProteconPhasing

    Don Roadway and

    eastern lands raised

    Flood ProtectionLandform

    Fullbuild-out

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    20/26

    FloodProteconPhasing

    Fullbuild-out

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    21/26

    FloodProteconPhasing

    Fullbuild-out

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    22/26

    FloodProteconPhasing

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    23/26

    NaturalizaonOpportunies

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    24/26

    InSummary

    Preliminaryresultssuggest: 4WSrealignedshouldbecarriedforwardandtheEA

    completed

    Firstphaseoffloodprotec+onwillprotectlandswestofCherryStreetnorthandsouthofPolsonQuay

    Secondphaseoffloodprotec+onwillprotectover480acresfromfloodingeastofDonRoadway

    Publicgreenspaceremainsacri+calelementoftheoverallPortLandsplan

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    25/26

    FloodproteconandnaturalizaonMainTradingFloor

    Businessanalysis:economics,marketandfinancingSideTradingFloor

    PortLands101MainfloorStudio

    Developmentplanningandphasing

    ThirdFloor,Pa[yWa[Room

  • 8/2/2019 Accelerated Port Lands: Flood Protection, Naturalization, And Greenspace (Mar 31)

    26/26

    HAVEYOURSAY

    Publicfeedbackworkshops:Tuesday,April36:30to9:30atSt.LawrenceHall

    or

    Wednesday,April46:30to9:30attheHarbour

    CastleWesn

    Online:www.portlandsconsultaon.ca