1 ACCELERATED DECK REPLACEMENT FOR THE MACDONALD BRIDGE Dusan Radojevic, Ph.D., P.Eng., P.E. WSDOT ABC Workshop Tumwater, WA 2015 April 01
35

ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

Aug 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

1

ACCELERATED DECK REPLACEMENT FOR THE MACDONALD BRIDGE

Dusan Radojevic, Ph.D., P.Eng., P.E.

WSDOT ABC WorkshopTumwater, WA2015 April 01

Page 2: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

2

Project Location

HALIFAX, NS

Page 3: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

3

Bridge Location

Page 4: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

4

Bridge Location

Macdonald Bridge

MacKay Bridge

DARTMOUTH

HALIFAX

Page 5: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

5

›Designed by P. L. Pratley›Built by Dominion Bridge Company Ltd. in 1955.›Suspension bridge: Main span 1,446 ft., L=2,498 ft.›Operated by Halifax Harbour Bridges

Original Bridge

Page 6: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

6

Roadway Deck

›Deck OK for strength but high maintenance.›Suspended structure replacement - Entirely new suspended structure including hangers in 2016.

Page 7: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

7

Scope

›Replace suspended bridge superstructure including hangers

›Strengthen towers and bents if necessary›Traffic to be kept running›Superstructure replacement allowed only during closures – night / weekend closures

›Full segment replacement

16-33 ft. (10m) DECK SEGMENTS

22-66 ft. (20m) DECK SEGMENTS 8-66 ft. (20m) DECK SEGMENTS

Page 8: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

8

Typical Deck Cross Sections

EXISTING

NEW

Page 9: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

9

Fabrication

Page 10: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

10

Fabrication

Page 11: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

11

Fabrication

Page 12: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

12

Fabrication

Page 13: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

13

New Deck Segment

Photo from Lion's Gate Bridge Deck Replacement

Page 14: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

14

Existing Elements

›Cables inspected in 2010›Main cables in good shape, with sufficient capacity

›Tower and bents – very good

Page 15: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

15

How?

Direction of Deck Replacement

›Traffic to be kept running›10 ½ hour full closures at night›Approximately 7 full weekend closures›Single-lane closures at off-peak times

16-33 ft. (10m) DECK SEGMENTS

22-66 ft. (20m) DECK SEGMENTS 8-66 ft. (20m) DECK SEGMENTS

Page 16: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

16

Typical segment replacement

1

2

Page 17: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

17

Typical segment replacement

4

3

Page 18: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

18

Typical segment replacementPhoto from Lion's Gate Bridge Deck Replacement

Page 19: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

19

Typical segment replacement

Page 20: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

20

Typical segment replacement

Page 21: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

21

Typical Erection Gantry

Page 22: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

22

Typical Erection Gantry

Page 23: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

23

Segment replacement in Halifax side span

›16 deck segments to be in Halifax side span›Over DND property

16-33 ft. (10m) DECK SEGMENTS

22-66 ft. (20m) DECK SEGMENTS 8-66 ft. (20m) DECK SEGMENTS

Page 24: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

24

Turntable Erection Gantry

Page 25: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

25

Halifax Side Span Segment Replacement

Page 26: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

26

Halifax Side Span Segment Replacement

Page 27: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

27

Increased Shipping Clearance

42434445464748495051525354555657

100 200 300 400 500 600 700 800 900 1000

Elevation [m]

Chainage [m]

Existing Road Profile Final Road Profile Existing Clearance Final Clearance

DMT DCBHMTHCB

NAVIGATIONCHANNEL

›Bridge deck jacked up following deck replacement›Raising of deck 10 ft. at midspan; 1 ft. at towers› Increase in shipping clearance 7 ft.

Page 28: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

28

Erection Analysis›Complex analysis; 700+ steps analyzed; iterative

Page 29: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

29

Wind Engineering›Halifax – hurricane zone›High wind speeds –> significant wind loads

Page 30: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

30

Wind Engineering – Aeroelastic Models

Page 31: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

31

Wind Engineering – Aeroelastic Models

Page 32: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

32

Main Cable Dehumidification

Page 33: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

33

Main Cable Dehumidification

INJECTION COLLAR

DH PLANTCABLE WRAPPING

Page 34: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

34

When?

›RFP – December 2013›Proposals received (ABC, FI, AV JV) - April 2014›LNP, American Bridge Canada – June 2014 ›Contract award – October 2014›Erection start – expected August 2015›Substantial completion – Sept/Oct 2016

Page 35: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately

New Bridge

35

Existing Bridge

Questions ?