PRI operating procedures provide that "This report is published
by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its
applicability and suitability for any particular use, including any
patent infringement arising there from, is the sole responsibility
of the user." PRI values your input. To provide feedback on this
document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under
Contact Us.) Copyright 2014 Performance Review Institute. All
rights reserved. t-frm-15 2-Jan-14
161Thorn Hill Road Warrendale, PA 15086-7527
AUDIT CRITERIA
AC7102 REV. H
Issued 1993-06 Revised: 2014-9 Superseding AC7102 Rev. G.
Baseline
Nadcap AUDIT CRITERIA for HEAT TREATING TO BE USED ON AUDITS
CONDUCTED ON OR AFTER 11-May-2014
Editorial Revision: 14-May-2014 para 1.1.2, 3.2.1, 2.1, 2.2.,
2.3, 2.4, 5.2, 5.2.1, 13.3.3 Editorial Revision: 11-Sept-2014 para
1.1.1, added AC7102/10
Editorial Revision: 23-Sept-2014 para 2.3, 7.3.1, 7.3.2, 7.3.3,
7.3.4, EC Data
1.0 INSTRUCTIONS TO SUPPLIER TO BE AUDITED 1.1 Prior to the
Audit 1.1.1 The Supplier shall complete a self-audit to (as
applicable):
AC7102 AC7102/1 (If seeking Brazing approval) AC7102/2 (If
seeking Aluminum approval) AC7102/3 (If seeking Carburizing
approval) AC7102/4 (If seeking Nitriding approval) AC7102/5 (If
Hardness testing is used in support of in-house heat
treating) AC7102/6 (If seeking HIP approval) AC7102/7 (If
seeking Induction Hardening approval) AC7102/8 (If seeking Heat
Treating approval) AC7102/10 (If seeking Localized Heat Treating
approval) AC7101/3 (If Tensile testing is used in support of
in-house heat
treating) AC7101/4 (If Metallography and Microindentation
testing are used
in support of in-house heat treating) AC7102/S (If seeking
Primes specific approval)
All non-conformances shall be corrected by the corrective action
system, prior to the actual audit. Nonconformance of a technical
nature found during the actual audit will, at the Task Groups
discretion, require a follow-up audit at the suppliers expense.
This self-audit shall be maintained by the Supplier for review by
the auditor.
During the self-audit the Supplier shall record each procedure
and paragraph number for each checklist question requiring an
answer on procedures.
YES NO
-
PRI AC7102 Revision H - 2 -
Ready availability of all documentation required by the Nadcap
auditor will speed up the audit process significantly.
1.1.2 The Supplier shall send the following to the auditor 30
days prior to the scheduled
audit (in English, unless otherwise agreed between auditor and
supplier):
List of equipment (atmosphere generation, testing equipment, lab
equipment, inspection equipment, plating, coating, cleaning,
Pyrometry, and Pyrometry testing, etc.) (U14)
List of purchased services, including name(s) of supplier for
calibration, processing, testing, etc., schedule of calibrations,
uniformity surveys, system accuracy tests, hardness machines
servicing, etc., schedule of periodic tests (tensile,
decarburization, etc.)
List of Prime customers and specifications for which heat
treater is approved
List of heat treat specifications [military, government,
industry (AMS, etc.) and customer] that supplier is working to
Copy of internal general procedures for heat treat processing,
Pyrometry and testing/inspection of heat treated product (exemption
for ITAR and Export Control documents applies).
Organization chart
YES NO
1.2 During the Audit 1.2.1 The Supplier should provide for an
in-briefing for the auditor. Key members of the
Suppliers staff should attend the in-briefing so the audit
purpose, methods and assessment process can be discussed.
1.2.2 Working space for the auditor with desks or tables,
chairs, telephone, clerical,
typing and reproduction services should be provided as
required.
1.2.3 Auditor shall verify the scope of accreditation and modify
it in eAuditNet as
required in agreement with the Supplier.
1.2.4 A final debriefing shall be conducted at the completion of
the audit. Each
nonconformance report (NCR) shall be reviewed and the Supplier
will be given the opportunity to seek clarifications.
NOTE: The Heat Treating Task Group may, upon review, change the
auditors
determination of a finding.
1.2.5 The Supplier has 21 calendar days to submit corrective
actions and effective
dates for each NCR. The supplier shall respond to each
individual NCR using the appropriate form/media (see Public
Documents on eAuditNet). Supporting documentation shall be
traceable to each individual NCR. The response must address the
root cause of the nonconformance from a systems management approach
and the actions taken or to be taken to preclude reoccurrence
1.3 Definitions and Interpretations 1.3.1 For definitions and
interpretations see Heat Treating Task Group Audit Handbook. 1.3.2
(Info) When noted (as shown) below, the YES/NO column indicates a
question
that is asked for information only, with no corresponding
requirements. The NO
-
PRI AC7102 Revision H - 3 -
answers to these questions do not require a nonconformance
report or an explanation.
1.4 Additional information for Suppliers 1.4.1 In addition to
the commodity checklist noted herein, there may be other
pertinent
data such as audit handbooks, attachments and preparatory
instructions necessary for the completion of the audit. These can
be found and downloaded from eAuditNet under Public Documents.
1.4.2 Questions marked with (U) codes are applicable to all
Suppliers. (Uxx)
codes indicate that there are additional related questions in
AC7102/S. Those questions concern only the corresponding prime and
shall be answered only if the prime is identified as a
customer.
2.0 SUPPLIER INFORMATION DIVISION: NATURE OF BUSINESS (U14):
IN-HOUSE PRODUCTS ONLY: ACCEPTS OUTSIDE WORK: TOTAL EMPLOYEES: HEAT
TREATING PERSONNEL: SQUARE FEET OF HT AREA(S): NO. OF SHIFTS
WORKED: ADDITIONAL CONTACTS POSITION EMAIL COMMENTS: 2.1 Cover
letter/notes attached.
2.2 Quality System Approval/certificate verified
(AC7004/AS/EN/JISQ 9100)
2.3 Staff Report attached.
Ensure that the scope has been reviewed and signed off in
eAudinet with the
-
PRI AC7102 Revision H - 4 -
Supplier. 2.4 Yes/No Plant Location Changed Yes/No QC Manager
Changed Yes/No Equipment Moved Yes/No Common Findings to Previous
Audit 3.0 GENERAL QUALITY SYSTEM NA 3.1 Document Control 3.1.1 Are
the applicable revisions of the appropriate documents available at
the
appropriate workstation? (To make an Audit Handbook
clarification/descriptive) YES NO
3.2 Contract Review 3.2.1 Are contracts and incoming purchase
orders reviewed to ensure that: YES NO a. The quality and technical
requirements, including any unique customer
requirements, are adequately defined and documented?
b. Adequate capability, customer approvals and resources by the
processor to
meet the requirements?
c. Any deviations from the proposal/contract are resolved in
writing by
authorized personnel/prime/supplier?
d. Adequate definition of the work statement to identify the
specific
process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.?
e. Identification of the prime aerospace customer that has
design authority? f. Identification of the aircraft model or
hardware that the part numbers
represent where applicable. (e.g. Boeing 777, Airbus A320,
etc.)?
g. Does the supplier flow contractual requirements down
internally and to sub-
tier suppliers?
3.3 Control of Nonconforming Product 3.3.1 Is the nonconforming
material controlled, and the customer notified of each
instance of nonconforming product in accordance with the
contractual requirements?
YES NO
3.3.2 When reheat treatment is performed: is it allowed by
specification, properly
documented, retested, and in compliance with customer
requirements? YES NO
3.4 Corrective Action 3.4.1 Are all corrective actions from the
previous Nadcap audit still implemented (check
the last full audit)? YES NO NA
3.5 Internal Audits 3.5.1 Are planned and documented internal
quality audits performed on a scheduled YES NO
-
PRI AC7102 Revision H - 5 -
basis by knowledgeable personnel not directly responsible for
the work? 3.5.2 Are all Nadcap elements within the scope of the
Suppliers accreditation properly
addressed in the internal audit? YES NO
3.6 Quality Planning These requirements must be checked through
all job
audits performed.
3.6.1 Is only the heat treating equipment which meets the
requirements of the applicable
specifications for instrumentation and temperature uniformity
used for processing? YES NO
3.6.2 Are specified times based on the appropriate thickness of
the part or other criteria
in accordance with the applicable specification? YES NO
3.6.3 Are tensile specimens and other test specimens included
with production loads
when required? YES NO NA
3.6.4 Are there procedures that address the use and placement of
load thermocouples
when required by specification or customer requirements? YES NO
NA
3.7 Frozen Planning NA 3.7.1 When customer approved fixed
processes are required, is the Supplier working to
the latest revision approved by the Customer and is the evidence
of this approval on file?
YES NO
3.8 First Lot Inspection NA 3.8.1 Is engineering first lot
inspection and approval documented when required by the
customer? YES NO
3.8.2 Are records maintained for the development of fixturing
and racking sketches, for
first article inspection when required by specification or
customer requirements? YES NO
3.9 Purchasing 3.9.1 Are all facilities used for subcontracted
testing and processing approved by either
the Customer or Prime, as required? YES NO NA
3.9.2
Are consumable goods, such as process atmospheres, quenchants,
salts, thermocouples, and materials for test samples, ordered and
accepted according to an in-house document or to a specific
standard?
YES
NO
3.10 Electronic program control and data acquisition NA 3.10.1
Is there a procedure in place to address software control? YES NO
3.10.2 Is there evidence that software used to control and record
Heat Treatment
equipment (programmable controller, electronic charts, etc.), is
compliant with approved procedure?
YES NO
3.10.3 Are all software revisions verified by first lot
inspection to ensure compliance with
specification requirements? YES NO
-
PRI AC7102 Revision H - 6 -
4. PERSONNEL 4.1 Training 4.1.1 Are there training procedures
that assure personnel performing contract review,
job planning, heat treating and associated quality and test
functions are competent to perform assigned tasks?
YES NO
4.1.2 Do records indicate that training is scheduled and
attended in accordance with
procedures and documented? YES NO
4.2 Evaluation of Personnel 4.2.1 Do procedures require periodic
evaluation to ensure that approved personnel
maintain proficiency in their assigned heat treating and related
tasks? YES NO
4.2.2 Do records indicate that the evaluations are performed at
documented frequencies
and the results reviewed with employees in a program of
continuous improvement of personnel??
YES NO
5. MATERIAL HANDLING AND TRACEABILITY 5.1 Incoming Material to
Processing 5.1.1 Are identification, count and quality
discrepancies resolved prior to processing of
parts? YES NO
5.1.2 Do procedures ensure that incoming customer documents
remain traceable to
those specific jobs throughout processing? YES NO
5.2 General Cleaning NA 5.2.1 Does the internal procedure
require that parts be clean prior to loading for
processing in the furnaces? (U18) YES NO
5.2.2 Do records and observations indicate that the procedure is
followed? YES NO 5.3 Corrosion Resistant Steels Cleaning NA 5.3.1
Does the internal procedure require that all PH steel parts with
any finish machined
surfaces are cleaned prior to heat treatment and handled with
clean gloves after cleaning? (U11)
YES NO
5.3.2 Do records and observations indicate that the procedure is
followed? YES NO 5.4 Titanium Cleaning and Handling NA 5.4.1 Does
the internal procedure for cleaning Titanium surfaces preclude the
using of
halogenated substances? YES NO
5.4.2 Does the internal procedure require that parts with any
finished surfaces be
handled with clean gloves? YES NO
5.4.3 Are the procedures followed? YES NO 6. INSPECTION
-
PRI AC7102 Revision H - 7 -
6.1 Process Verification 6.1.1 Is each heat treatment cycle
reviewed for job traceability, correct temperature, time
at temperature and all other related parameters? (U11) YES
NO
6.1.2 Is this review performed by Quality Assurance, other
designated personnel, or self-
inspected by the automated computer control and monitoring
system? (See Heat Treating Audit Handbook) (U11, U7)
YES NO
6.1.3 Is the review documented in accordance with the customer
requirements? (U11) 6.1.4 Are the acceptance status and any test
data recorded on the shop paper only after
the operation for that job has been completed? YES NO
6.2 Sampling Plans NA 6.2.1 Does the supplier have a procedure
that details all aspects of sampling inspection
that is in accordance with all customer heat treating
specification sampling requirements?
YES NO
6.2.2 Do all supplier heat treating sampling plans contain: a. A
method to determine the quantity of product to check in the lot?
YES NO b. Specified frequency and method of sampling? YES NO c.
When to change to tightened or reduced plans? YES NO 6.2.3 Are
sampling plans approved by the customer, when required? YES NO NA
6.2.4 Is there documented training in the use of the sampling plan
which includes sample
size and selection, reduced and tightened plans, and when to
implement them? YES NO
6.2.5 Does a sampling of jobs where sample inspection is
permitted indicate that customer
requirements have been flowed down correctly to the inspector or
delegated operator and are met?
YES NO
7. PROCESS CONTROL TESTING 7.1 Does the Supplier have procedures
or other documentation in place that addresses
all required Heat Treat process control testing? (See Heat
Treating Audit Handbook) YES NO
7.2 Do the procedures or other documentation contain or
reference the following
information:
a. All applicable specifications when testing is specified? (See
section 3.2) YES NO NA b. All qualification, periodic, and
lot/batch acceptance testing as required by
specifications? YES NO
c.
d.
A schedule for the completion of periodic tests? Documentation
that tests were performed per the schedule?
YES
YES
NO
NO
7.3 Auditor is to select a minimum of 4 periodic tests
(excluding Pyrometry, Hardness,
and Conductivity) consisting of internal or external tests
(including requirements, NA
-
PRI AC7102 Revision H - 8 -
frequency, actual results, compliance, etc.) from the Suppliers
Process Control System and evaluate them against the applicable
specification requirements, including interval and test method. Two
of these verifications may be selected as part of the Job Audits or
they may all be selected separately.
7.3.1 Test 1: YES NO 7.3.2 Test 2: YES NO 7.3.3 Test 3: YES NO
7.3.4 Test 4: YES NO 7.4 Hardness and/or Conductivity Testing 7.4.1
For information only, does the supplier perform hardness and/or
conductivity testing? YES
(info) NO
If the Supplier performs hardness testing and/or conductivity
testing for acceptance of product, Nadcap AC7102/5 checklist shall
be executed.
7.5 Metallography/Microhardness 7.5.1 For information only, does
the supplier perform metallography and microhardness
testing? (U18) YES (info)
NO
If the Supplier performs metallography/microhardness testing for
acceptance of
product or process control of the heat treatment process, Nadcap
AC7101/4 checklist shall be executed, unless the supplier is
accredited by Nadcap Material Testing Laboratory Task Group to
AC7101/4 checklist.
7.6 Mechanical Testing 7.6.1 For information only, does the
supplier perform mechanical testing? (U11) YES
(info) NO
If the Supplier performs mechanical testing for acceptance of
product or process
control of the heat treatment process, Nadcap AC7101/3 checklist
shall be executed, unless accredited by Nadcap Material Testing
Laboratory Task Group to AC7101/3 checklist.
7.7 Preparation of Mechanical Test Specimens 7.7.1 For
information only, does the supplier prepare the specimens for the
mechanical
testing? YES (info)
NO
7.8 Surface Contamination Testing of Alloy Steels NA 7.8.1 Do
the internal testing procedures conform to the specifications? YES
NO 7.8.2 Do the internal testing procedures cover the following: a.
Partial decarburization of steels? YES NO
-
PRI AC7102 Revision H - 9 -
b. Total decarburization of steels? YES NO c. Carburization of
steels? d. IGO/IGA (Inter Granular Oxidation/Inter Granular Attack)
test? YES NO 7.8.3 Are the test records current and complete? YES
NO 7.8.4 Is there a system in place to ensure that decarburization
tests are performed at the
proper frequency, whether it is periodic or with the load? (U11)
YES NO
7.9 Titanium Testing NA 7.9.1 Is there a system in place to
control the test coupons and their use when required? YES NO 7.9.2
Does the internal documentation support that the test coupons are
used in
accordance with the procedures/specifications? YES NO
7.9.3 Is there a system in place and adequate procedures for the
control of hydrogen pick
up that meets the method and frequency specified by the
customers requirements? YES NO
8. REFRIGERATION AND SUB-ZERO TREATMENTS OF STEELS NA 8.1 Do
procedures cover sub-ambient/sub-zero cooling according to the
customer
requirements, or in absence of customer requirements, does the
supplier have a default procedure?
YES NO
8.2 Do procedures and job planning specify time/temperature
limits for sub-ambient/sub-
zero treatments? YES NO
8.3 Do records indicate that the procedures are followed? YES NO
9. FURNACE CONTROL AND MAINTENANCE 9.1 Furnace Document Control
9.1.1 Operating Instructions 9.1.1.1 Are the current operating
manuals or instructions available to furnace operators,
maintenance personnel and other personnel requiring the
information? YES NO
9.1.2 Heating and Cooling Parameters (U10) 9.1.2.1 Does the
internal procedure specify the method for determining heat-up rate,
start of
soaking time, end of soaking time and cooling rate? (U10) YES
NO
9.1.2.2 Do records on the furnace chart or furnace log indicate
compliance to the above
procedure and customer requirements? YES NO
9.2 Maintenance 9.2.1 Are all components of each furnace that
can affect the functionality inspected and
maintained in accordance with a documented preventative
maintenance schedule? (U3)
YES NO
-
PRI AC7102 Revision H - 10 -
9.2.2 Do records indicate that the inspection and maintenance
have been performed in accordance with the schedule?
YES NO
9.3 Control of the Heating Environment NA 9.3.1 Does the
internal procedure specify how atmospheres are to be controlled
and
monitored to ensure conformance to the requirements? YES NO
9.3.2 Do records indicate that the procedure is followed? YES NO
9.4 Metering NA 9.4.1 Are the flow meters operational and
appropriate for the gas and flow rates used? YES NO 9.4.2 Do the
inspection and maintenance schedule include periodic checks of flow
meters
to ensure that they are functioning? YES NO
9.4.3 Does the internal procedure address the safety shut-off
valves and the emergency
gas purges? YES NO
9.5 Purging NA 9.5.1 When the atmosphere is changed, is the
furnace purged in accordance with an
internal procedure that assures elimination of the effects of
previous atmosphere? YES NO
9.5.2 Does the internal procedure for purging Ammonia bearing
atmospheres used for
nitriding include an Ammonia cut-off and purge in accordance
with specification requirements?
YES NO
9.5.3 Do records indicate that the procedure is followed? YES NO
9.6 Neutral Salt baths for Steel NA 9.6.1 Is each salt bath tested
periodically in accordance with the applicable heat treatment
specifications? YES NO
9.6.2 Do the salt bath test results demonstrate conformance to
carburization,
decarburization, nitriding, and intergranular attack
requirements? YES NO
9.6.3 Is there an internal procedure for these tests? YES NO
9.6.4 Do records indicate that the procedure is followed? YES NO
9.7 Carbon Controls for Steels NA 9.7.1 Do the internal procedures
specify a system of maintenance and calibration of carbon
control indicators? YES NO
9.7.2 Do records indicate that the maintenance and calibrations
are performed as required
by the procedures and applicable specifications? YES NO
9.7.3 Is the accuracy of the carbon control system confirmed by
the results of tests
required by the heat treatment specifications? YES NO
9.8 Snap Temper NA 9.8.1 Are there procedures that address snap
tempering within the time limits required by
the customers specifications? (U11) YES NO
-
PRI AC7102 Revision H - 11 -
9.9 Quench System NA 9.9.1 Are the quench mechanisms operational
and capable of meeting maximum quench
delay provisions of the specifications? YES NO
YES NO 9.10 Quenchant Maintenance NA 9.10.1 Does the internal
procedure specify that quenchant temperatures are to be
controlled
and documented? YES NO
9.10.2 Is all temperature recording and controlling equipment
calibrated? YES NO 9.10.3 Do quenchant agitation and/or agitation
of the product during quenching conform to
the applicable specifications? YES NO
9.11 Polymer Quenchants (Except Aluminum see AC7102/2) NA 9.11.1
Is there a system in place that ensures polymer quenching is only
used when
permitted by the particular specification for the alloy and
metal thickness? YES NO
9.11.2 Do procedures define the polymer concentration in
accordance with the
requirements? YES NO
9.11.3 Do the records indicate compliance? YES NO 9.11.4 Do
procedures specify the frequency and methods for determining the
polymer
concentration in accordance with the requirements? YES NO
9.12 Quench Effectiveness NA 9.12.1 Do procedures specify the
frequency and methods for the testing of oil quenchants
in accordance with all customer requirements? (See Section
7)
YES NO
9.12.2
Do the records indicate that quenchant effectiveness is
consistent and meets the specifications requirements?
YES
NO
9.13 Press Quench NA 9.13.1 Are the expander pressure, the
cylinder pressure, and the number and force of hold
down springs, and applicable tolerances documented on or
traceable to the traveler for each job?
YES NO
9.14 Racks, Fixtures and Baskets NA 9.14.1 Do internal
procedures require that, when a part requires a specially
designed
fixturing or racking method, that the specific fixturing or
racking is used? YES NO
9.14.2 Are there internal procedures, racking sketches, or other
means to ensure that
spacing between the parts is adequate for circulation of the
heating medium and coolant/quenchant as required by the
specifications?
YES NO
9.14.3 Do records indicate that the procedures are followed? YES
NO 9.14.4 Does the internal procedure require that the
racks/fixtures/baskets are examined for
integrity, and repaired or scrapped as necessary? YES NO
-
PRI AC7102 Revision H - 12 -
9.14.5 Do records indicate that the procedure is followed? YES
NO 9.15 Fasteners NA 9.15.1 Is there a system in place to ensure
that the fasteners are only processed in qualified
containers to approved procedures and customer requirements, or,
when qualified, in a continuous furnace?
YES NO
9.16 Plating NA
Note: For purposes of this section, plating is limited to the
plating operations utilized for temporary masking or other
operations for successful heat treatment or brazing. This is not
intended to replace plating for finishing purposes as controlled by
Chemical Processing Task Group. If the supplier has a current
Nadcap Chemical Processing accreditation that includes both plating
and stripping, questions 9.16.1 through 9.16.7.2 are YES unless
otherwise noted as part of the finding during this Special Process
audit.
9.16.1
Does a general or part-specific documented procedure define the
following:
9.16.1.1 In-process cleaning methods, water break free check?
YES NO 9.16.1.2 Etching? YES NO NA 9.16.1.3 Strike/Activation,
including temperature, time, current (as applicable)? YES NO
9.16.1.4 Post-process cleaning methods? YES NO 9.16.1.5 The
specified plate thickness and method(s) of its measurement? YES NO
9.16.1.6
Any required treatment for preventing hydrogen
embrittlement?
YES
NO
9.16.2
Fixturing, racking, masking
NA 9.16.2.1 9.16.2.2
Are the fixtures, racks and masking materials defined and
identified? Do fixtures and masking prevent the entrapment of air
or process solutions, and protect parts from corrosion and unwanted
coverage?
YES
YES
NO
NO
9.16.2.3 Does the fixturing and racking facilitate solution
neutralization and removal during
rinsing, and minimize solution and rinse water drag-out and
cross contamination of process tanks?
YES NO
9.16.2.4 Do the fixturing, racking, electric circuit design and
lifting equipment preclude
mechanical damage or electrical arcing? YES NO
9.16.3 Processing tanks NA 9.16.3.1 Are processing tanks
identifiable for their contents and specified temperature
ranges? YES NO
9.16.3.2 Are the tanks with specified temperature ranges
operating within those ranges at the
time of processing? YES NO
9.16.3.3 Are tanks of sufficient volume and dimensions to
contain hardware during processing
and assure sufficient coverage of parts? YES NO
9.16.3.4 Are tanks that require uniform temperature and solution
concentration agitated? YES NO
-
PRI AC7102 Revision H - 13 -
9.16.3.5 Are tanks for electrolytic coatings equipped and
configured to promote the required
uniform deposition rate? YES NO
9.16.4 Are anodes controlled and specific to each process
solution to avoid cross
contamination? YES NO
9.16.5 Are equipment and solutions in compliance with applicable
customer requirements? YES NO 9.16.6 Do the records show that the
specified thickness of plate is achieved? YES NO 9.16.7 Stripping
NA 9.16.7.1 Are the methods and materials for removal of plating as
specified or approved by the
customer? YES NO
9.16.7.2 Do stripping procedures include an inspection of the
stripped component following
the strip operation? YES NO
10. PYROMETRY TESTING
The auditor shall execute Nadcap AC7102/8 checklist as part of
this audit.
11. VACUUM FURNACES NA 11.1 Procedures 11.1.1 Does the internal
procedure or other documentation specify cleaning of parts,
tooling
and baskets by methods and with materials that ensure freedom
from contamination during vacuum heat treating?
YES NO
11.1.2 Does the internal procedure, photographic evidence, or
other documentation specify
placement of load thermocouples, racking of parts, and furnace
loading? (U10) YES NO
11.2 Tests and Records 11.2.1 Does the internal procedure
control the following: a. Leak-up rate test? (U10 & U7) YES NO
b. Calibration of vacuum instruments, controllers, recorders,
thermocouples,
master gauges, dew point and other gas contaminant measuring
instruments? (U10 & U7)
YES NO
c. Quench gas purity and/or dew point (i.e. does the gas
certification meet
specification requirements)? YES NO
d. Furnace burn-out? YES NO e. For partial pressure atmosphere,
does the dew point of the gas is periodically
checked as the gas enters the furnace? YES NO NA
11.2.2 Does the calibration interval of the vacuum systems
sensor, control panel and
recorder meet the frequency of the customer specification? YES
NO
11.2.3 Are calibration acceptance criteria defined in the
internal procedure? Yes NO
-
PRI AC7102 Revision H - 14 -
11.2.4 Do records indicate that the tests and calibrations are
performed as required by the internal procedure and all applicable
specifications?
YES NO
11.2.5 Is the vacuum level in the heating and cooling chambers
recorded during all thermal
cycles requiring vacuum? (U10) YES NO
12. COMPLIANCE AUDITS OF COMPLETED HEAT TREATING JOBS 12. to 13.
The Auditor shall execute two (2) completed long job audits
(including final testing). When the YES/NO is followed by (Info),
the info notation indicates a question that is asked for
information only, with no corresponding requirement. A NO
answers to these questions do not require a nonconformance report
or an explanation.
14. COMPLIANCE AUDITS OF ABBREVIATED IN-PROCESS HEAT TREATING
JOBS 14. to 21. The Auditor shall execute eight (8) abbreviated
in-process job audits for a single lot of in-process
parts, except when the in-process Heat Treating jobs are
replaced by an equal amount of in-process Brazing jobs (part of the
checklist AC7102/1 performed in conjunction with AC7102 checklist).
When eight (8) abbreviated in-process jobs cannot be witnessed,
completed jobs may substitute the in-process jobs, but not for more
than four (4).
When the YES/NO is followed by (Info), the info notation
indicates a question that is asked for
information only, with no corresponding requirement. A NO
answers to these questions do not require a nonconformance report
or an explanation.
-
PRI AC7102 Revision H - 15 -
12. COMPLIANCE AUDIT OF COMPLETED HEAT TREATING JOB NA The
Supplier needs to clearly identify the Export Control status of all
parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
12.1 Job #1 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (i.e. fixed process approval):
(EC) k. Pre-heat treatment requirements (cleaning, plating,
etc.) - See sections 5
and 9
12.1.1 Does the job planning contain all of the applicable items
described below? YES NO a. Part number and/or adequate description
of the material. b. Identification of quantity, material type,
condition, form, and test samples as
applicable.
c. Any deviations from the proposal/contract are resolved in
writing by
authorized personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific
-
PRI AC7102 Revision H - 16 -
process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work. i. Place to record date operation
performed.
12.2 Racking NA 12.2.1 Are customer racking or batching
requirements specified? YES NO (EC) Describe: (EC) Do not describe
but answer YES or NO 12.2.2 Is racking or batching specified as
requirement on the shop paper? YES NO (EC) Describe: (EC) Do not
describe but answer YES or NO 12.2.3 Is the racking or batching
used in accordance to requirements? YES NO (EC) Describe: (EC) Do
not describe but answer YES or NO 12.2.4 Did racking ensure that
air is not entrapped detrimentally during the quench? YES NO NA
12.3 Thermal Treatment Step One NA 12.3.1 Step One: Furnace used:
Date part(s) processed: 12.3.2 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC) Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
-
PRI AC7102 Revision H - 17 -
Load Thermocouples
(EC)
12.3.3 (EC) Step One Time REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance
(EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
12.3.4 (EC) Step One Quench
NA
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Quench delay (EC) (EC) (EC)
Quench media % (EC) (EC) (EC)
Quenchant Temperature Start
(EC)
Quenchant Temperature End
(EC)
Quenchant Temperature Rise
(EC)
Quench gauge calibration
Delay to the next operation
(EC)
12.3.5 Was the furnace stabilized at or below set temperature
(including the room
temperature for vacuum furnaces) before loading the parts? YES
NO
(EC) Describe: (EC) Do not describe but answer YES or NO. 12.3.6
What is the basis for determining the start and the end of the
soak? Describe:
-
PRI AC7102 Revision H - 18 -
12.3.7 Does the method for determining the start and the end of
soak meet the customer
requirements? YES NO
12.4 Offsets NA 12.4.1 Is offsetting performed? YES NO 12.4.2 Is
offsetting permitted by the customer? YES NO 12.4.3 What offset is
made? Describe: 12.5 Step One Summary NA 12.5.1 Is the uniformity
requirement or furnace number specified on shop paper? YES NO (List
below): 12.5.2 Does the furnace meet the uniformity requirement?
YES NO 12.5.3 Does the furnace possess the control and recording
instrumentation required by
the governing specification for this heat treatment? YES NO
12.5.4 Did cooling/quenching meet the requirements? YES NO
12.5.5 Does all thermal treatment meet the specified requirements?
YES NO 12.5.6 Is there evidence that heat treatment cycles are
reviewed for job traceability,
correct temperature and time at temperature? YES NO
12.5.7 Was this review performed by QA or other designated
personnel and the review
documented in accordance with the customer requirements? (U11)
YES NO
12.6 Thermal Treatment Step Two Temper NA 12.6.1 Step Two
Temper: Furnace used: Date part(s) processed: 12.6.2 (EC)
What is the basis for determining the tempering temperature for
alloy steels?
a. Specified in the shop paper b. As quenched hardness c. Other
(Describe)
12.6.3 (EC) Step Two Temper Temperature
-
PRI AC7102 Revision H - 19 -
REQUIREMENT SHOP PAPER REQUIREMENT
SET TEMPERATURE
ACTUAL TEMPERATURES
Temperature
(EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
12.6.4 (EC) Step Two Temper Time
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance
(EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
12.7 Thermal Treatment Step Two Age/PPT/Second Temper NA 12.7.1
Step Two Age/PPT/Second Temper: Furnace used: Date part(s)
processed:
12.7.2 (EC) Step Two Age/PPT/Second Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES Temperature (EC) (EC) (EC)
-
PRI AC7102 Revision H - 20 -
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
12.7.3 (EC) Step Two Age/PPT/Second Temper Time
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
12.8 Step Two Summary NA 12.8.1 Is the uniformity or furnace
number specified on shop paper? YES NO (List below): 12.8.2 Does
the furnace meet the uniformity requirement? YES NO 12.8.3 Does the
furnace possess the control and recording instrumentation required
by the
governing specification for this heat treatment? YES NO
12.8.4 Did cooling/quenching meet the requirements? YES NO
-
PRI AC7102 Revision H - 21 -
12.8.5 Does all thermal treatment meet the specified
requirements? YES NO 12.8.6 Is there evidence that the heat
treatment cycles are reviewed for job traceability,
correct temperature and time at temperature? YES NO
12.8.7 Was this review performed by QA or other designated
personnel and the review
documented in accordance with the customer requirements? (U11)
YES NO
12.9 Cold Temperature Treatments NA (EC) Treatment specified:
(EC) Treatment on the shop paper: (EC) Treatment performed and
documented: (EC) YES or NO answer only 12.9.1 Do these treatments
meet the customer requirements? YES NO
12.10 Load Thermocouples NA 12.10.1 Are the load thermocouples
required for this job either by the customer or internal
procedure? YES NO
(EC) What requirements/documentation is specified? (EC) How many
load thermocouples are used? What kind (expendable/non-expendable)
and type? How are the usage cycles or time intervals controlled?
(EC) Location of the load thermocouples: Method of attachment or
method to simulate the maximum part thickness: 12.10.2 Did the
usage and placement of load thermocouples conform to requirements?
YES NO 12.11 Straighten/Stress Relieve NA 12.11.1 Was the
straightening/stress relieving done? YES NO
-
PRI AC7102 Revision H - 22 -
Treatment specified (EC)
Treatment on the shop paper (EC)
Treatment performed (EC)
12.11.2 Do these treatments meet the customer requirement?
YES NO
Note: Straightening time and temperature allowances for
straightening may be in subordinate specifications rather than in
the basic heat treating specification. 12.12 (EC) Hardness Testing
NA
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Hardness/Tensile range
(EC) (EC) (EC)
Hardness converted from Tensile
(EC) (EC) (EC)
Sample/Parts tested
(EC) (EC) *Only record if a part or sample was tested
Test frequency (EC) (EC)
Converted hardness recorded
(EC) (EC) (EC)
12.12.1 Does the hardness obtained conform to specification? YES
NO 12.12.2 Is the operator currently qualified/certified to perform
Hardness Testing? YES NO 12.13 (EC) Conductivity Testing NA
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Conductivity range (EC) (EC) (EC)
Test method (EC) (EC) (EC)
Sample/Parts tested
*record if sample or part tested 12.13.1 Does the conductivity
obtained conform to specification? YES NO 12.13.2 Is the operator
currently qualified/certified to perform Conductivity Testing? YES
NO
12.14 Additional Periodic and Lot testing required: (Charpy
impact, Tensile test, Fracture toughness, Metallographic and/or
Microhardness tests, etc.)
NA
-
PRI AC7102 Revision H - 23 -
(EC) Additional lot or periodic testing required by the
specification:
(EC) Shop paper requirement for additional testing:
(EC) Actual additional testing results: 12.14.1 Are these tests
properly documented in the Suppliers Process Control System? YES NO
12.14.2 Do the tests meet the customer requirement? YES NO 12.15
Operator Control and Job Acceptance 12.15.1 Independent Heat
Treaters NA 12.15.1.1 Does the certificate show compliance to all
applicable drawing, specification and
PO requirements including documentation of any exceptions (e.g.
pre- and post-cleaning, straightening, testing, etc.)?
YES NO
12.15.1.2 Does the certificate list the revision level of the
specification to which the parts
were processed? YES NO
12.15.1.3 Do the test reports reflect the actual data? YES NO
12.15.1.4 Is the shop paper verified and accepted by authorized
personnel? YES NO 12.15.2 Manufacturers/Captive Heat Treaters NA
12.15.2.1 Is the shop paper verified and accepted by authorized
personnel? YES NO 12.16 Did this job comply with all other
requirements? YES NO
-
PRI AC7102 Revision H - 24 -
13. COMPLIANCE AUDIT OF COMPLETED HEAT TREATING JOB NA The
Supplier needs to clearly identify the Export Control status of all
parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
13.1 Job #2 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (i.e. fixed process approval):
(EC) k. Pre-heat treatment requirements (cleaning, plating,
etc.) - See sections 5
and 9
13.1.1 Does the job planning contain all of the applicable items
described below? YES NO a. Part number and/or adequate description
of the material. b. Identification of quantity, material type,
condition, form, and test samples as
applicable.
c. Any deviations from the proposal/contract are resolved in
writing by
authorized personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific
-
PRI AC7102 Revision H - 25 -
process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work. i. Place to record date operation
performed.
13.2 Racking NA 13.2.1 Are customer racking or batching
requirements specified? YES NO (EC) Describe: (EC) Do not describe
but answer YES or NO 13.2.2 Is racking or batching specified as
requirement on the shop paper? YES NO (EC) Describe: (EC) Do not
describe but answer YES or NO 13.2.3 Is the racking or batching
used in accordance to requirements? YES NO (EC) Describe: (EC) Do
not describe but answer YES or NO 13.2.4 Did racking ensure that
air is not entrapped detrimentally during the quench? YES NO NA
13.3 Thermal Treatment Step One NA 13.3.1 Step One: Furnace Used:
Date part(s) processed: 13.3.2 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
-
PRI AC7102 Revision H - 26 -
Load Thermocouples
(EC)
13.3.3 (EC) Step One Time
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance
(EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
13.3.4 (EC) Step One Quench NA
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Quench delay (EC) (EC) (EC)
Quench media % (EC) (EC) (EC)
Quenchant Temperature Start
(EC)
Quenchant Temperature End
(EC)
Quenchant Temperature Rise
(EC)
Quench gauge calibration
Delay to the next operation
(EC)
13.3.5 Was the furnace stabilized at or below set temperature
(including the room
temperature for vacuum furnaces) before loading the parts? YES
NO
(EC) Describe: (EC) Do not describe but answer YES or NO. 13.3.6
What is the basis for determining the start and the end of the
soak? Describe:
-
PRI AC7102 Revision H - 27 -
13.3.7 Does the method for determining the start and the end of
soak meet the customer
requirements? YES NO
13.4 Offsets NA 13.4.1 Is offsetting performed? YES NO 13.4.2 Is
offsetting permitted by the customer? YES NO 13.4.3 What offset is
made? Describe: 13.5 Step One Summary NA 13.5.1 Is the uniformity
or furnace number specified on shop paper? YES NO (List below):
13.5.2 Does the furnace meet the uniformity requirement? YES NO
13.5.3 Does the furnace possess the control and recording
instrumentation required by
the governing specification for this heat treatment? YES NO
13.5.4 Did cooling/quenching meet the requirements? YES NO
13.5.5 Does all thermal treatment meet the specified requirements?
YES NO 13.5.6 Is there evidence that heat treatment cycles are
reviewed for job traceability,
correct temperature and time at temperature? YES NO
13.5.7 Was this review performed by QA or other designated
personnel and the review
documented in accordance with the customer requirements? (U11)
YES NO
13.6 Thermal Treatment Step Two Temper NA 13.6.1 Step Two
Temper: Furnace Used: Date part(s) processed: 13.6.2 (EC)
What is the basis for determining the tempering temperature for
alloy steels?
a. Specified in the shop paper b. As quenched hardness c. Other
(Describe)
13.6.3 (EC) Step Two Temper Temperature
-
PRI AC7102 Revision H - 28 -
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
13.6.4 (EC) Step Two Temper Time
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
13.7 Thermal Treatment Step Two Age/PPT/Second Temper NA 13.7.1
Step Two Age/PPT/Second Temper: Furnace Used: Date part(s)
processed:
13.7.2 (EC) Step Two Age/PPT/Second Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
-
PRI AC7102 Revision H - 29 -
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
13.7.3 (EC) Step Two Age/PPT/Second Temper Time
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
13.8 Step Two Summary NA 13.8.1 Is the uniformity or furnace
number specified on shop paper? YES NO (List below): 13.8.2 Does
the furnace meet the uniformity requirement? YES NO 13.8.3 Does the
furnace possess the control and recording instrumentation required
by
the governing specification for this heat treatment? YES NO
13.8.4 Did cooling/quenching meet the requirements? YES NO
13.8.5 Does all thermal treatment meet the specified requirements?
YES NO 13.8.6 Is there evidence that the heat treatment cycles are
reviewed for job traceability,
correct temperature and time at temperature? YES NO
13.8.7 Was this review performed by QA or other designated
personnel and the review
documented in accordance with the customer requirements? (U11)
YES NO
13.9 Cold Temperature Treatments NA
-
PRI AC7102 Revision H - 30 -
(EC) Treatment specified: (EC) Treatment on the shop paper: (EC)
Treatment performed and documented: (EC) YES or NO answer only
13.9.1 Do these treatments meet the customer requirements? YES
NO
13.10 Load Thermocouples NA 13.10.1 Are the load thermocouples
require for this job either by the customer or internal
procedure? YES NO
(EC) What requirements/documentation is specified? (EC) How many
load thermocouples are used? What kind (expendable/non-expendable)
and type? How are the usage cycles or time intervals controlled?
(EC) Location of the load thermocouples: Method of attachment or
method to simulate the maximum part thickness: 13.10.2 Did the
usage and placement of load thermocouples conform to requirements?
YES NO 13.11 Straighten/Stress Relieve NA 13.11.1 Was the
straightening/stress relieving done? YES NO
Treatment specified
(EC) Treatment on the shop paper
(EC) Treatment performed
(EC)
13.11.2 Do these treatments meet the customer requirement? YES
NO
Note: Straightening time and temperature allowances for
straightening may be in subordinate specifications rather than in
the basic heat treating specification.
13.12 (EC) Hardness Testing NA
REQUIREMENT SHOP PAPER REQUIREMENT
ACTUAL
-
PRI AC7102 Revision H - 31 -
Hardness/Tensile range
(EC) (EC) (EC)
Hardness converted from Tensile
(EC) (EC) (EC)
Sample/Parts tested
(EC) (EC)
*only record if a part or sample was tested Test frequency
(EC) (EC)
Converted hardness recorded
(EC) (EC) (EC)
13.12.1 Does the hardness obtained conform to specification? YES
NO 13.12.2 Is the operator currently qualified/certified to perform
Hardness Testing? YES NO 13.13 (EC) Conductivity Testing NA
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Conductivity range (EC) (EC) (EC)
Test method (EC) (EC) (EC)
Sample/Parts tested
*record if sample or part tested
13.13.1 Does the conductivity obtained conform to specification?
YES NO 13.13.2 Is the operator currently qualified/certified to
perform Conductivity Testing? YES NO 13.14 Additional Periodic or
Lot testing required: (Charpy impact, Tensile test,
Fracture toughness, Metallographic and/or microhardness tests,
etc.) NA
(EC) Additional lot or periodic testing required by the
specification: (EC) Shop paper requirement for additional testing:
(EC) Actual additional testing results: 13.14.1 Are these tests
properly documented in the Suppliers Process Control System? YES NO
13.14.2 Do the tests meet the customer requirement? YES NO 13.15
Operator Control and Job Acceptance 13.15.1 Independent Heat
Treaters NA 13.15.1.1 Does the certificate show compliance to all
applicable drawing, specification and YES NO
-
PRI AC7102 Revision H - 32 -
PO requirements including documentation of any exceptions (e.g.
pre- and post-cleaning, straightening, testing, etc.)?
13.15.1.2 Does the certificate list the revision level of the
specification to which the parts
were processed? YES NO
13.15.1.3 Do the test reports reflect the actual data? YES NO
13.15.1.4 Is the shop paper verified and accepted by authorized
personnel? YES NO 13.15.2 Manufacturers/Captive Heat Treaters NA
13.15.2.1 Is the shop paper verified and accepted by authorized
personnel? YES NO 13.16 Did this job comply with all other
requirements? YES NO
-
PRI AC7102 Revision H - 33 -
14. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB
NA The Supplier needs to clearly identify the Export Control status
of all parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
14.1 Job #1 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (e.g. fixed process approval) - See sections 3.2,
3.7 and 7:
(EC) k. Pre-heat treatment requirements (cleaning, racking,
normalizing, plating,
stress relieving, etc.):
(EC) l. Pre-heat treatment requirements on the shop paper - See
sections 5 and 9: (EC) m. Pre-heat treatment actually performed -
See sections 5 and 9: 14.1.1 Does the job planning contain all of
the applicable items described below? YES NO a. Part number and/or
adequate description of the material.
-
PRI AC7102 Revision H - 34 -
b. Identification of quantity, material type, condition, form,
and test samples as applicable.
c. Any deviations from the proposal/contract are resolved in
writing by
authorized personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific
process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work.
14.2 Thermal Treatment Step One NA 14.2.1 Step One: Furnace
used: Date part(s) processed: 14.2.2 Does the furnace possess the
control and recording instrumentation required by
the governing specification for this heat treatment? YES NO
14.2.3 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
14.2.4 (EC) Step One Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
-
PRI AC7102 Revision H - 35 -
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
14.3 Thermal Treatment Step Two NA 14.3.1 Thermal Treatment Step
Two Temper NA 14.3.1.1 Step Two Temper: Furnace used: Date part(s)
processed: 14.3.1.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
14.3.1.3 (EC) Step Two Temper Temperature
REQUIREMENT SHOP PAPER REQUIREMENT
SET TEMPERATURE
ACTUAL TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
14.3.1.4 (EC) Step Two Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
-
PRI AC7102 Revision H - 36 -
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
14.3.2 Thermal Treatment Step Two Age/PPT/Second Temper NA
14.3.2.1 Step Two Age/PPT/Second Temper: Furnace used: Date part(s)
processed: 14.3.2.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
14.3.2.3 (EC) Step Two Age/PPT/Second Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
14.3.2.4 (EC) Step Two Age/PPT/Second Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
-
PRI AC7102 Revision H - 37 -
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
14.4 Testing for the abbreviated Job #1 NA 14.4.1 Testing
requirements by Specification, P/O or Drawing (EC) 14.4.2 Shop
paper testing requirements: (EC) 14.4.3 Actual testing performed:
(EC) 14.5 Job Acceptance 14.5.1 Is the operation signed off or data
recorded only after completion? YES NO 14.5.2 Did the treatment of
hardware conform to customers specified requirements? YES NO
-
PRI AC7102 Revision H - 38 -
15. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB
NA The Supplier needs to clearly identify the Export Control status
of all parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
15.1 Job #2 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (i.e. fixed process approval):
(EC) k. Pre-heat treatment requirements (cleaning, racking,
normalizing, plating,
stress relieving, etc.):
(EC) l. Pre-heat treatment requirements on the shop paper: (EC)
m. Pre-heat treatment actually performed:
15.1.1 Does the job planning contain all of the applicable items
described below? YES NO a. Part number and/or adequate description
of the material.
-
PRI AC7102 Revision H - 39 -
b. Identification of quantity, material type, condition, form,
and test samples as applicable.
c. Any deviations from the proposal/contract are resolved in
writing by authorized
personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific process(es) to
be performed including specification number(s), applicable
Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work.
15.2 Thermal Treatment Step One NA 15.2.1 Step One Information:
Furnace used: Date part(s) processed: 15.2.2 Does the furnace
possess the control and recording instrumentation required by
the governing specification for this heat treatment? YES NO
15.2.3 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
15.2.4 (EC) Step One Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
-
PRI AC7102 Revision H - 40 -
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
15.3 Thermal Treatment Step Two NA 15.3.1 Thermal Treatment Step
Two Temper NA 15.3.1.1 Step Two Temper: Furnace used: Date part(s)
processed: 15.3.1.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
15.3.1.3 (EC) Step Two Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
15.3.1.4 (EC) Step Two Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into
-
PRI AC7102 Revision H - 41 -
furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
15.3.2 Thermal Treatment Step Two Age/PPT/Second Temper NA
15.3.2.1 Step Two Age/PPT/Second Temper: Furnace used: Date part(s)
processed: 15.3.2.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
15.3.2.3 (EC) Step Two Age/PPT/Second Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
15.3.2.4 (EC) Step Two Age/PPT/Second Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
-
PRI AC7102 Revision H - 42 -
Media for Cooling (EC)
Cooling Condition (EC)
15.4 Testing for the abbreviated Job #2 NA 15.4.1 Testing
requirements by Specification, P/O or Drawing: (EC) 15.4.2 Shop
paper testing requirements: (EC) 15.4.3 Actual testing performed:
(EC) 15.5 Job Acceptance 15.5.1 Is the operation signed off or data
recorded only after completion? YES NO 15.5.2 Did the treatment of
hardware conform to customers specified requirements? YES NO
-
PRI AC7102 Revision H - 43 -
16. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB
NA The Supplier needs to clearly identify the Export Control status
of all parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
16.1 Job #3 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (i.e. fixed process approval):
(EC) k. Pre-heat treatment requirements (cleaning, racking,
normalizing, plating,
stress relieving, etc.):
(EC) l. Pre-heat treatment requirements on the shop paper: (EC)
m. Pre-heat treatment actually performed:
16.1.1 Does the job planning contain all of the applicable items
described below? YES NO a. Part number and/or adequate description
of the material. b. Identification of quantity, material type,
condition, form, and test samples as
-
PRI AC7102 Revision H - 44 -
applicable. c. Any deviations from the proposal/contract are
resolved in writing by authorized
personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific process(es) to
be performed including specification number(s), applicable
Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work.
16.2 Thermal Treatment Step One NA 16.2.1 Step One: Furnace
used: Date part(s) processed: 16.2.2 Does the furnace possess the
control and recording instrumentation required by
the governing specification for this heat treatment? YES NO
16.2.3 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
16.2.4 (EC) Step One Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
-
PRI AC7102 Revision H - 45 -
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
16.3 Thermal Treatment Step Two NA 16.3.1 Thermal Treatment Step
Two Temper NA 16.3.1.1 Step Two Temper: Furnace used: Date part(s)
processed: 16.3.1.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
16.3.1.3 (EC) Step Two Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
16.3.1.4 (EC) Step Two Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
-
PRI AC7102 Revision H - 46 -
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
16.3.2 Thermal Treatment Step Two Age/PPT/Second Temper NA
16.3.2.1 Step Two Age/PPT/Second Temper: Furnace used: Date part(s)
processed: 16.3.2.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
16.3.2.3 (EC) Step Two Age/PPT/Second Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
16.3.2.4 (EC) Step Two Age/PPT/Second Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
-
PRI AC7102 Revision H - 47 -
Cooling Condition (EC)
16.4 Testing for the abbreviated Job #3 NA 16.4.1 Testing
requirements by Specification, P/O or Drawing: (EC) 16.4.2 Shop
paper testing requirements: (EC) 16.4.3 Actual testing performed:
(EC) 16.5 Job Acceptance 16.5.1 Is the operation signed off or data
recorded only after completion? YES NO 16.5.2 Did the treatment of
hardware conform to customers specified requirements? YES NO
-
PRI AC7102 Revision H - 48 -
17. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB
NA The Supplier needs to clearly identify the Export Control status
of all parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
17.1 Job #4 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (i.e. fixed process approval):
(EC) k. Pre-heat treatment requirements (cleaning, racking,
normalizing, plating,
stress relieving, etc.):
(EC) l. Pre-heat treatment requirements on the shop paper: (EC)
m. Pre-heat treatment actually performed:
17.1.1 Does the job planning contain all of the applicable items
described below? YES NO a. Part number and/or adequate description
of the material.
-
PRI AC7102 Revision H - 49 -
b. Identification of quantity, material type, condition, form,
and test samples as
applicable.
c. Any deviations from the proposal/contract are resolved in
writing by authorized
personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific process(es) to
be performed including specification number(s), applicable
Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work.
17.2 Thermal Treatment Step One NA 17.2.1 Step One: Furnace
used: Date part(s) processed: 17.2.2 Does the furnace possess the
control and recording instrumentation required by
the governing specification for this heat treatment? YES NO
17.2.3 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
17.2.4 (EC) Step One Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
-
PRI AC7102 Revision H - 50 -
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
17.3 Thermal Treatment Step Two NA 17.3.1 Thermal Treatment Step
Two Temper NA 17.3.1.1 Step Two Temper: Furnace used: Date part(s)
processed: 17.3.1.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
17.3.1.3 (EC) Step Two Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
17.3.1.4 (EC) Step Two Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
-
PRI AC7102 Revision H - 51 -
Time end of soak (EC)
Media for Cooling (EC)
Cooling Condition (EC)
17.3.2 Thermal Treatment Step Two Age/PPT/Second Temper NA
17.3.2.1 Step Two Age/PPT/Second Temper: Furnace used: Date part(s)
processed: 17.3.2.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
17.3.2.3 (EC) Step Two Age/PPT/Second Temper Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
17.3.2.4 (EC) Step Two Age/PPT/Second Temper Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
-
PRI AC7102 Revision H - 52 -
Cooling Condition (EC)
17.4 Testing for the abbreviated Job #4 NA 17.4.1 Testing
requirements by Specification, P/O or Drawing: (EC) 17.4.2 Shop
paper testing requirements: (EC) 17.4.3 Actual testing performed:
(EC) 17.5 Job Acceptance 17.5.1 Is the operation signed off or data
recorded only after completion? YES NO 17.5.2 Did the treatment of
hardware conform to customers specified requirements? YES NO
-
PRI AC7102 Revision H - 53 -
18. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB
NA The Supplier needs to clearly identify the Export Control status
of all parts being used in the
audit. Technical information on parts which have been designated
Export Controlled License Required (EC-LR) cannot be input into
eAuditNet.
Throughout the Compliance section of the audit specific
questions/data entry points are marked
with an (EC). These are questions which have been designated by
the Task Group as those which cannot be answered in eAuditNet IF
the part is (EC-LR). Do not enter technical data, add the comment
EC Technical Data Restricted. If Auditors have any questions about
this, they should contact the Staff Engineer for directions.
18.1 Job #5 Identity: (Info) a. Purchase order number (for
Independent Heat Treaters only): b. Customer (and prime, if known):
c. Job number, Part number: d. Part description: e. Part size: f.
Maximum part thickness: g. Number of parts: (EC) h. Material alloy,
Material specification (if available): (EC) i. Heat Treating
specification: (EC) j. Heat treat and other process and test
requirements specified by customer
specification (i.e. fixed process approval):
(EC) k. Pre-heat treatment requirements (cleaning, racking,
normalizing, plating,
stress relieving, etc.):
(EC) l. Pre-heat treatment requirements on the shop paper: (EC)
m. Pre-heat treatment actually performed: 18.1.1 Does the job
planning contain all of the applicable items described below? YES
NO a. Part number and/or adequate description of the material.
-
PRI AC7102 Revision H - 54 -
b. Identification of quantity, material type, condition, form,
and test samples as
applicable.
c. Any deviations from the proposal/contract are resolved in
writing by
authorized personnel/prime/supplier.
d. Adequate definition of the work statement to identify the
specific
process(es) to be performed including specification number(s),
applicable Type(s), Class(es), Grade(s), etc.
e. Any changes, additions, and deletions are made by authorized
personnel. f. Place to record inspection status. g. Place to record
test requirements and results. h. Place to record identification of
person(s) doing the work.
18.2 Thermal Treatment Step One NA 18.2.1 Step One: Furnace
used: Date part(s) processed: 18.2.2 Does the furnace possess the
control and recording instrumentation required by
the governing specification for this heat treatment? YES NO
18.2.3 (EC) Step One Temperature
REQUIREMENT SHOP PAPER
REQUIREMENT SET
TEMPERATURE ACTUAL
TEMPERATURES
Temperature (EC) (EC) (EC)
Check if used
Control (EC)
Recorder (EC)
High/Low - Type A or C Instrumentation
(EC)
Load Thermocouples
(EC)
18.2.4 (EC) Step One Time
REQUIREMENT SHOP PAPER
REQUIREMENT ACTUAL
Atmosphere (EC) (EC) (EC)
-
PRI AC7102 Revision H - 55 -
Time and Tolerance (EC) (EC) (EC)
Time loaded into furnace
Time start of soak (EC)
Time end of soak (EC)
Media for Cooling (EC)
Cooling Rate (Excluding Quench)
(EC)
18.3 Thermal Treatment Step Two NA 18.3.1 Thermal Treatment Step
Two Temper NA 18.3.1.1 Step Two Temper: Furnace used: Date part(s)
processed: 18.3.1.2 Does the furnace possess the control and
recording instrumentation required by
the governing specification for this heat treatment? YES NO
18.3.1.3 (EC) Step Two Temper Temper