1 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and Rumaitha / Bab CO 2 Projects
16

Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

May 02, 2018

Download

Documents

doanthuy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

1

Abu Dhabi Carbon Capture, Usage and Storage Project

ESI CCS Project

and

Rumaitha / Bab CO2 Projects

Page 2: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

2

1. Drivers for CCUS in Abu Dhabi

2. Execution Strategy

3. Project Details of the ESI CCS Project

4. Future Opportunities

Agenda

Page 3: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

3

Abu Dhabi CCUS: Value Drivers

Strategic Gas

Demand

& EOR

Environmental

Commitment to

Abu Dhabi 30%

Clean Energy

CCS Global &

Regional

Leadership

CCUS Project

Will enable future CCS Projects

CCS Projects

ADNOC AD

Government

CO2 capture and

transportation

projects at $/MT

CO2 injection for

EOR Increased oil

Recovery

+

Domestic gas

availability

Gas Liberation

and Enhanced

Oil Recovery

(EOR)

Regulatory

Framework

Page 4: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

4

Considering the power sector in Abu Dhabi alone:

• Growth in hydrocarbon gas demand is expected to be >1 BSCFD over next 10 years

• Gas Supply sources to grow (domestic / imports) to meet the demand including LNG imports

CCUS Value Drivers: Hydrocarbon Gas Demand

ADNOC support CCUS strategy to enhance oil recovery (EOR) and potentially

increase UAE gas availability

Supported by the EAA “CCS Value Proposition Study” which forecasts a

potential growth in CO2 requirements over next 10-15 years, if CO2 projects

prove to be successful.

The ESI CCS Project is a first commercial mover project which will establish the

commercial principals for a CO2 industry and further demonstrate the technical

viability of CO2 operations

Page 5: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

5

CCUS or Low Carbon Power is a key strategy to reduce UAE’s greenhouse gases whilst continuing to meet the country’s growing energy demands.

The ESI CCUS Project will capture ~800,000T of CO2 per year:

• equivalent CO2 from a 200MW CCGT1

• equivalent CO2 from ~170,000 cars

• equivalent CO2 from ~100,000 houses (US)

The project demonstrates the UAE’s global and regional leadership in the deployment of CCUS and its support for climate change mitigation mechanisms.

CCS Value Drivers: Environmental

Page 6: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

6

ADNOC and Masdar are working together to develop the CO2 Capture, Transportation & Injection components.

This presentation principally deals with the ESI CCS Project.

Masdar responsible to provide technology & project support for the CO2 Capture, Compression and Pipeline facilities

• Pilot Injection program successfully implemented in Rumaitha (2009 -2011).

• ESI Facility & Pipeline FEED completed in 2010.

• ESI CCS Project Management support awarded to Rhead Group in 2012

• ESI CCS Project awarded to Dodsal Engineering & Construction in July 2013 (<USD200 million)

o 3 months into a 33 month schedule – Ready for Commissioning by Jan 2016

Project Execution Strategy and Status Update

Page 7: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

7

ADNOC through its subsidiary ADCO is responsible to

provide technology & project support for the CO2 Injection

facilities, and the treatment post production.

• Pilot Injection program successfully implemented in Rumaitha (2009 -

2011

• Rumaitha / Bab FEED completed in 2013.

• Rumaitha / Bab Injection facilities in EPC Tendering Phase and forecast

award by end 2013

Project Execution Strategy and Status Update

Page 8: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

8

ESI CCS Project Technical Overview

Page 9: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

9

DRI & CO2 Absorption Processes

Page 10: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

10

Sized for 800,00 TPA CO2 (98% min purity) = 41.5 MMSCFD

LP Compression:

• Integrally geared 5/6 Stage Centrifugal Compressor (0 – 41barg)

Mol Sieve dehydration system

• Reduce water content to 20lb/MMSCF

HP Compression:

• Reciprocating 2 Stage Compressor (35 – 238barg)

Mass Transfer Custody Transfer Meter (Coriolis Meter) complete with GC and Moisture Analyzers

Utilities:

• Electrical transformers/switchgear for 25MW

• Utilities such as N2, Cooling Water, Instrument Air

• Control Room for Facility and Pipeline

CO2 Compression and Dehydration Facility

Page 11: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

11

CO2 Compression Facility - Location

Page 12: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

12

CO2 Compression Facility Layout

Page 13: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

13

Pipeline:

• 8” X65 API5L carbon steel buried pipeline designed for 245barg

• 2 Block Valve Stations

• Remote isolation and maintenance blowdown facilities

• Launching / Receiving facilities for Pipeline Scrapper

• Telecoms, SCADA, CCTV and leak Detection running over buried fiber

optics

Rumaitha Metering Station:

• Mass Transfer Custody Transfer Meter (Coriolis Meter), complete with

GC and Moisture Analyzers

• CO2 transferred to ADCO

Pipeline Transmission and Receiving Station

Page 14: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

14

CO2 Transmission Pipeline - Location

Page 15: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

15

CO2 as an EOR agent has been endorsed: • Success of the ESI CCS Project and Rumaitha / Bab Injection are key to future

development.

Changing landscape in Abu Dhabi with potential CO2 targets for field testing and development: • CO2 capture linked to ADNOC field demand and performance;

Whilst preliminary, the EAA CCS Value Proposition study forecast a growing CO2 demand in the next 25-30 years, based on ADNOC estimations.

Abu Dhabi CCS: Future Potential

Page 16: Abu Dhabi Carbon Capture, Usage and Storage Project andcss.escwa.org.lb/SDPD/3303/4.pdf ·  · 2015-08-281 Abu Dhabi Carbon Capture, Usage and Storage Project ESI CCS Project and

16

Thank You