Top Banner
T PRODUCTION BUILDINGS OFFICE/LAB BUILDING RETENTION POND (perc test needed) PROJECT INFORMATION APPLICABLE CODES: BUILDING CODE: MECHANICAL CODE: ELECTRICAL CODE: PLUMBING CODE: FIRE CODE: ENERGY CODE: APN: 021 - 071 - 45 OCCUPANCY: F - 1, S - 1, B, H - 3 ZONING: I CONSTRUCTION TYPE: TYPE II B WALLS: TILT UP CONCRETE FULLY SPRINKLERED H - 3 AREAS ARE SEPARATED BY FIREWALLS AND THEREFORE INDEPENDENT FIRE AREAS. BUILDING AREAS - SEE FIRE KEY PLAN THIS SHEET STORAGE BUILDING: OVERALL AREA = 15,000 SF. 10,000 SF WAREHOUSE (S - 1), 5,000 SF MAINTENANCE SHOP (F - 1) ALLOWABLE AREAS: NON SEPARATED USE MOST CONSERVATIVE (F - 1): IF NON - SPRINKLERED, 15,500 SF > 15,000 SF ok NOTE THE BUILDING MAY BE SPRINKLERED AT THE OWNER'S DISCRETION BUT WOULD NOT BE REQUIRED BY CODE. OCCUPANCY: WAREHOUSE PORTION: 10000/500 = 20 OCCUPANTS (ONE W.C, ONE LAV REQUIRED) MAINTENANCE PORTION: 5000/100 = 50 OCCUPANTS (ONE W.C, ONE LAV REQUIRED) PROVIDE (1) M AND (1) F RESTROOMS IN EACH SPACE SCOPE OF WORK: THE PROJECT CONSISTS OF A MANUFACTURING AND OFFICE BUILDING AS WELL AS STORAGE BUILDING. THE OFFICE BUILDING AND APPROXIMATELY 1/2 OF THE MANUFACTURING FACILITY ARE IN PHASE 1; THE SECOND 1/2 OF THE MANUFACTURING FACILITY AND A STORAGE BUILDING ARE PHASE 2. THE MANUFACTURING FACILITY RECYCLES THE LITHIUM - ION BATTERIES INTO RESALABLE CHEMICAL COMPONENTS USING A NON - THERMAL SEPARATION TECHNOLOGY. 2018 IBC WITH NORTHERN NEVADA AMENDMENTS 2018 UMC 2017 NEC 2018 UPC 2018 IFC WITH NORTHERN NEVADA AMENDMENTS 2018 IECC PROJECT GENERAL INFORMATION AND CODE ANALYSIS: American Battery Technology Company 930 Tahoe Blvd, Suite 802 - 16 Incline Village NV 89451 PHONE: (775) 473 - 4744 CONTACT: Chuck Leber OWNER: BJG Architecture & Engineering 449 S. VIRGINIA STREET FOURTH FLOOR RENO, NV 89501 PHONE: (775) 827 - 1010 CONTACT: George Ghusn ARCHITECTURE & STRUCTURAL ENGINEERING: VICINITY MAP 1 2 3 4 5 LOCATION FIRE KEY PLAN LEGEND OCCUPANCY 1 7200 14,000 H - 3 ALLOWABLE AREA ACTUAL AREA NOTES 2 13,600 14,000 H - 3 3 20,100 92,000 B 4 12,300 62,000 F - 1 5 30,000 62,000 F - 1 PHASE 2 LOCATION PLUMBING FIXTURE ANALYSIS FUNCTION 1 7200 INDUSTRIAL AREA 2 10,900 3 20,100 BUSINESS 4 14,560 5 30,000 INDUSTRIAL INDUSTRIAL INDUSTRIAL OCCUPANTS 72 109 134 146 300 WATER CLOSET 3 / 6 DRINKING FOUNTAINS 1 / 1 SERVICE SINKS 1 / 1 M F LAVATORIES M F 3 / 6 3 / 4 3 / 4 2 / 3 1 / 1 1 / 1 3 2 / 5 3 / 3 3 / 3 TOTAL = 327 2 / X 1 / X 1 / X 2 / X 3 / X 3 / X PHASE 2 IS NOT DESIGNED PLUMBING ANALYSIS NOTES: 1. ANALYSIS IS BASED ON THE NORTHERN NEVADA AMENDMENTS. 2. THE FIXTURE COUNTS ARE NOTED: REQUIRED / PROVIDED. 3. THE SERVICE SINK FOR THE INDUSTRIAL PORTION IS LOCATED IN PART 3. 4. THE RESTROOMS FOR PARTS 1, 2 AND 4 ARE LOCATED IN PART 3. 5. THE UNISEX RESTROOMS ARE NOT COUNTED IN THE FIXTURE COUNT COLUMNS. A UNISEX TRUCKERS RR IS ALSO PROVIDED A UNISEX RR IS ALSO PROVIDED. NOTES SEAL: SHEET TITLE: SCALE: PROJECT NO: CHECKED: SHEET DESIGNED/DRAWN: DATE: / As Noted Copyright 2021. All rights reserved by BJG Architecture & Engineering. This drawing is an instrument of service. It is the property of BJG and may not be reproduced without the express written authorization from BJG Architecture & Engineering. PROJECT INFORMATION: ISSUED FOR: 449 S. Virginia St. Fourth Floor Reno, NV 89501 (775) 827-1010 www.bjginc.com 2/12/2021 10:52:53 AM J:\CD\2020\20200073A\Drawings\ABMC COMBINED BUILDING OVERALL FOR CUP.rvt 20200073 ABTC CONDITIONAL USE PERMIT SUBMITTAL TITLE SHEET TS.1 2/12/21 LOGAN ROAD FERNLEY NEVADA CONDITIONAL USE PERMIT GEG GEG 2/12/21 SHEET INDEX DRAWING DESCRIPTION TS.1 TITLE SHEET ARCHITECTURAL A1.0 ARCHITECTURAL SITE PLAN A2.1 OFFICE/LABORATORY PLAN A2.2 SORTING/ PRODUCTION PHASE 1 A4.1 ROOF PLAN A6.1 ELEVATIONS A7.1 BUILDING SECTIONS A10.1 3D VIEW A12.1 STORAGE BUILDING ABTC CONDITIONAL USE PERMIT SUBMITTAL LOGAN ROAD FERNLEY NEVADA FIRE WALL FIRE WALL REVISIONS REV # DESCRIPTION DATE
9

ABTC CONDITIONAL USE PERMIT SUBMITTAL

Apr 17, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ABTC CONDITIONAL USE PERMIT SUBMITTAL

T

PROPOSED FIRE HYDRANT

PRODUCTION BUILDINGS

OFFICE/LAB BUILDING

RETENTION POND(perc test needed)

PROJECT INFORMATION

APPLICABLE CODES:

BUILDING CODE:MECHANICAL CODE:ELECTRICAL CODE:PLUMBING CODE:FIRE CODE:ENERGY CODE:

APN: 021-071-45

OCCUPANCY: F-1, S-1, B, H-3ZONING: ICONSTRUCTION TYPE: TYPE II B

WALLS: TILT UP CONCRETEFULLY SPRINKLERED

H-3 AREAS ARE SEPARATED BY FIREWALLS AND THEREFORE INDEPENDENT FIRE AREAS.

BUILDING AREAS - SEE FIRE KEY PLAN THIS SHEET

STORAGE BUILDING: OVERALL AREA = 15,000 SF.10,000 SF WAREHOUSE (S-1), 5,000 SF MAINTENANCE SHOP (F-1)ALLOWABLE AREAS:NON SEPARATED USE MOST CONSERVATIVE (F-1): IF NON-SPRINKLERED, 15,500 SF > 15,000 SF okNOTE THE BUILDING MAY BE SPRINKLERED AT THE OWNER'S DISCRETION BUT WOULD NOT BE REQUIRED BY CODE.

OCCUPANCY:WAREHOUSE PORTION: 10000/500 = 20 OCCUPANTS (ONE W.C, ONE LAV REQUIRED)MAINTENANCE PORTION: 5000/100 = 50 OCCUPANTS (ONE W.C, ONE LAV REQUIRED)

PROVIDE (1) M AND (1) F RESTROOMS IN EACH SPACE

SCOPE OF WORK:THE PROJECT CONSISTS OF A MANUFACTURING AND OFFICE BUILDING AS WELL ASSTORAGE BUILDING. THE OFFICE BUILDING AND APPROXIMATELY 1/2 OF THEMANUFACTURING FACILITY ARE IN PHASE 1; THE SECOND 1/2 OF THEMANUFACTURING FACILITY AND A STORAGE BUILDING ARE PHASE 2. THEMANUFACTURING FACILITY RECYCLES THE LITHIUM-ION BATTERIES INTO RESALABLECHEMICAL COMPONENTS USING A NON-THERMAL SEPARATION TECHNOLOGY.

2018 IBC WITH NORTHERN NEVADA AMENDMENTS2018 UMC2017 NEC2018 UPC2018 IFC WITH NORTHERN NEVADA AMENDMENTS2018 IECC

PROJECT GENERAL INFORMATION AND CODE ANALYSIS:American Battery Technology Company930 Tahoe Blvd, Suite 802-16Incline Village NV 89451PHONE: (775) 473-4744 CONTACT: Chuck Leber

OWNER:

BJG Architecture & Engineering449 S. VIRGINIA STREET FOURTH FLOORRENO, NV 89501PHONE: (775) 827-1010 CONTACT: George Ghusn

ARCHITECTURE & STRUCTURALENGINEERING:

VICINITY MAP

1

2

3

45

LOCATION

FIRE KEY PLAN LEGEND

OCCUPANCY

1 720014,000H-3

ALLOWABLEAREA

ACTUAL AREA NOTES

2 13,60014,000H-3

3 20,10092,000B

4 12,30062,000F-1

5 30,00062,000F-1 PHASE 2

LOCATION

PLUMBING FIXTURE ANALYSIS

FUNCTION

1 7200INDUSTRIAL

AREA

2 10,900

3 20,100BUSINESS

4 14,560

5 30,000

INDUSTRIAL

INDUSTRIAL

INDUSTRIAL

OCCUPANTS

72

109

134

146

300

WATER CLOSET

3 / 6

DRINKINGFOUNTAINS

1 / 1

SERVICESINKS

1 / 1

M F

LAVATORIES

M F

3 / 6 3 / 4 3 / 4

2 / 3 1 / 1 1 / 1 32 / 5 3 / 3 3 / 3

TOTA

L =

327

2 / X 1 / X 1 / X2 / X 3 / X 3 / X PHASE 2 IS NOT DESIGNED

PLUMBING ANALYSIS NOTES:1. ANALYSIS IS BASED ON THE NORTHERN NEVADA AMENDMENTS.2. THE FIXTURE COUNTS ARE NOTED: REQUIRED / PROVIDED.3. THE SERVICE SINK FOR THE INDUSTRIAL PORTION IS LOCATED IN PART 3.4. THE RESTROOMS FOR PARTS 1, 2 AND 4 ARE LOCATED IN PART 3.5. THE UNISEX RESTROOMS ARE NOT COUNTED IN THE FIXTURE COUNT COLUMNS.

A UNISEX TRUCKERS RR ISALSO PROVIDED

A UNISEX RR IS ALSO PROVIDED.

NOTES

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

2:5

3 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

TITLE SHEET

TS.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SHEET INDEX

DRAWING DESCRIPTION

TS.1 TITLE SHEETARCHITECTURAL

A1.0 ARCHITECTURAL SITE PLANA2.1 OFFICE/LABORATORY PLANA2.2 SORTING/ PRODUCTION PHASE 1A4.1 ROOF PLANA6.1 ELEVATIONSA7.1 BUILDING SECTIONSA10.1 3D VIEWA12.1 STORAGE BUILDING

ABTC CONDITIONAL USE PERMITSUBMITTAL

LOGAN ROAD FERNLEY NEVADA

FIRE WALL

FIRE WALL

REVISIONS

REV # DESCRIPTION DATE

Page 2: ABTC CONDITIONAL USE PERMIT SUBMITTAL

UP

UP

UP

SBSBSBSBSBSBSBSB SBSB

SBSB

3 .7

MONUMENT SIGN

NOT A PART

LOGAN ROAD

TRANSFORMER/SUBSTATION

EXIS

TING

TCI

D DI

TCH

5' - 0"

6' -

0"

8" CMU SOLIDGROUTED

RAISED METALLETTERS/SYMBOLSBOTH SIDES OFSIGN WALL

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

0:3

3 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

ARCHITECTURALSITE PLAN

A1.0

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 1" = 50'-0" 1ARCHITECTURAL SITE PLANNOT TO SCALEMONUMENT SIGN

REVISIONS

REV # DESCRIPTION DATE

Page 3: ABTC CONDITIONAL USE PERMIT SUBMITTAL

SB SB SB SB SB SB

SBSB SBSB

SB SB

OFFICE/LAB BUILDING

VEST100

LOBBY101

BOARDROOM

102

CONF103

CIR

CU

LATI

ON

104

OPEN OFFICE105

IT106

MENS107

WOMENS108

OFC/MTG109

OFC/MTG110

OFC/MTG111

CONF112

WELLNESS113 UNISEX

114MENS

LOCKER 1116

CIRCULATION120

PILOT BAYS121

LAB OFC122

PROCESS DEVLAB123

ANALYTICALLAB124

STORAGE125

PPE AREA126

SECURITY128

ENTRY129

WOMENSLOCKER 2

133

MENSLOCKER 2

134

DIRTY EXIT136

CLEAN PPE138

PROCESS201

104'

- 9"

9' - 0" 179' - 10 5/8"

GAS BOTTLES125A

FIRE RISER125B

FIRE RISER204

VAC125C

4' -

10 1

/4"

BREAK130

WOMENSLOCKER 1

115

JAN125D

2' -

11 1

3/16

"

GYM118

TRAINING/PRESENTATION117

collaboration wall

4' wall 4' wall

CLOSET117B

MENS117C

WMNS117D

HALL117A

VEST115A

VEST116A

PILOT BAY203

MAINELECTRICAL

116C

UK TSRPONML

22

44

5

6

7

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

43' -

9"

34' -

0"

27' -

0"

A7.11

33

27' -

0"

4A4A

JAN119

J.6

76' - 4"

3.13.1

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

0:3

4 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

OFFICE/LABORATORYPLAN

A2.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 1/8" = 1'-0" 1ENLARGED OFFICE /LABORATORY PLAN

REVISIONS

REV # DESCRIPTION DATE

Page 4: ABTC CONDITIONAL USE PERMIT SUBMITTAL

UP

UP

UP

SBSBSBSBSBSB

SBSB SBSB

SBSB

UK

180' - 0"

TSRPONML

55

66

1111

1212

93' -

3"

95' -

0"

5' -

0"

77

88

99

1010

NaOH30%6k

NaOH8%10k

H2SO420%10k

FeSO410k

H2O210k

Ca(OH)21.5k

WORKING AREA

RACK

ING

RACK

ING

RACK

ING

93' -

3"

20' -

6"

24' -

0"

24' -

0"

19' -

0"

7' -

6"5'

- 0"

20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"

SHADED AREA IS MEZZANINE ABOVE

SORTING202

MEZ

ZANI

NE C

OLUM

N LI

NES

DRIVE INDOOR

CORRIDOR

116D

DRIVE INDOOR

DRIVE INDOOR

DRIVE INDOOR

(blockout?)

DRIVE INDOOR

(blockout?)

DRIVE INDOOR

DUNKTANK

DUNK

TANK

DRIVE INDOOR

ROREJECT

10k

ROREJECT

10k

JHGFEDCB J.6

160' - 0"

ROREJECT

10k

H2O210k

H2O210k

H2SO420%10k

H2SO420%10k

H2SO498%6k

FeSO410k

NaOH8%10k

NaOH8%10k

PHASE 1PHASE 2

ROINPUT10k

ROINPUT10k

ROINPUT10k

12' -

0"

DUNK

TANK

RACK

ING

RACK

ING

12' - 0"

HSOVERHEAD

DOOR

HSOVERHEAD

DOOR

PROCESSWATER

10kRO

INPUT10k

ROINPUT10k

ROINPUT10k

PROCESSWATER

10k

PROCESSWATER

10k

PROCESSWATER

10kPROCESSWATER

10k

PROCESSWATER

10k

PROCESSWATER

10k

FILTERS

FILTERS

PROCESSWATER

10k

7270.1 SF

SORTING202

13502.4 SF

PROCESS201

2780.5 SF

PILOT BAY203

9055.4 SF

WATERTREATMENT

205

63.9 SF

FIRE RISER204

269.7 SF

MAIN ELECTRICAL116C

95' -

0"

5' - 0"

PHASE 235,000 SF

18" DEEP CONCRETECONTAINMENTS - SET FOR110% OF LAGREST TANKCAPACITY

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

0:3

7 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

SORTING/PRODUCTION

PHASE 1

A2.2

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 1/16" = 1'-0" 1SORTING/PRODUCTION BUILDING FLOOR PLAN

TANK YARD INPUT CHENMICALS:

1. CALCIUM HYDROXIDE: 1321 GALLONS2. HYDROGEN PEROXIDE: 26,418 GALLONS3. IRON SULFATE: 13,209 GALLONS4. SODIUM HYDROXIDE, 8%: 26,418 GALLONS5. SODIUM HYDROXIDE, 30%: 5,283 GALLONS6. SULFURIC ACID 20%: 26,418 GALLONS7. SULFURIC ACID 98%: 5,283 GALLONS

REVISIONS

REV # DESCRIPTION DATE

Page 5: ABTC CONDITIONAL USE PERMIT SUBMITTAL

UP

UP

UK TSRPONML

2

4

5

6

11

12

7

8

9

10

3

JHGFEDCB

4A

J.6

3.1

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

0:4

0 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

ROOF PLAN

A4.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 1/16" = 1'-0" 1ROOF PLAN

REVISIONS

REV # DESCRIPTION DATE

THE OFFICE ANDPRODUCTION BUILDINGSHAVE REFLECTIVE WHITESTANDING SEAM METALROOFS.

THE OFFICE MECHANICALPLATFORM ROOF IS WHITEMEMBRANE ROOFING

Page 6: ABTC CONDITIONAL USE PERMIT SUBMITTAL

FINISH FLOOR0' - 0"

HIGH EAVE44' - 0"

U KT S R P O N M L

OFFICE EAVE14' - 0"

J H G F E D C BJ.6

SE

FINISH FLOOR0' - 0"

HIGH EAVE44' - 0"

SOUTH EAVE34' - 0"

UK TSRPONMLJHGFEDCB J.6

SE

FINISH FLOOR0' - 0"

HIGH EAVE44' - 0"

SOUTH EAVE34' - 0"

24561112 78910

OFFICE EAVE14' - 0"

109' - 7 1/4"

34A 3.1

FINISH FLOOR0' - 0"

HIGH EAVE44' - 0"

SOUTH EAVE34' - 0"

2 4 5 6 11 127 8 9 10

OFFICE EAVE14' - 0"

3 4A3.1

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

0:4

6 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

ELEVATIONS

A6.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 1/16" = 1'-0" 1NORTH ELEVATION

SCALE: 1/16" = 1'-0" 2SOUTH ELEVATION

SCALE: 1/16" = 1'-0" 3EAST ELEVATION

SCALE: 1/16" = 1'-0" 4WEST ELEVATION1

PAINTED TILT-UP CONCRETE

PAINTED CMU

EIFS ON METAL STUDS

PAINTED TILT-UP CONCRETE

PAINTED TILT-UP CONCRETE

PAINTED CMU

EIFS ON METAL STUDS

PAINTED TILT-UP CONCRETE

PAINTED CMU

EIFS ON METAL STUDS

PHASE 2 PHASE 1

PHASE 1 PHASE 2

REVISIONS

REV # DESCRIPTION DATE

COLORS SHOWN AREFROM THE OWNERSBRAND COLORS

Page 7: ABTC CONDITIONAL USE PERMIT SUBMITTAL

FINISH FLOOR0' - 0"

HIGH EAVE44' - 0"

SOUTH EAVE34' - 0"

2 4 5 6 11 127 8 9 103 4A3.1

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

0:4

7 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

BUILDINGSECTIONS

A7.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 3/32" = 1'-0" 1Section 1

REVISIONS

REV # DESCRIPTION DATE

Page 8: ABTC CONDITIONAL USE PERMIT SUBMITTAL

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

1:5

5 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

3D VIEW

A10.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

geg geg

2/12/21

REVISIONS

REV # DESCRIPTION DATE

Page 9: ABTC CONDITIONAL USE PERMIT SUBMITTAL

SESW

S1

S2

S3

S4

S5

S6

S7

100' - 0"

A12.13

A12.1

4

A12.1

5

25' -

0"

25' -

0"

25' -

0"

25' -

0"

25' -

0"

25' -

0"

150'

- 0"

FINISH FLOOR0' - 0"

S1 S2 S3 S4 S5 S6 S7

STORAGE BUILDINGEAVE

26' - 0"

FINISH FLOOR0' - 0"

S1S2S3S4S5S6S7

STORAGE BUILDINGEAVE

26' - 0"

25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"

FINISH FLOOR0' - 0"

SE SW

STORAGE BUILDINGEAVE

26' - 0"

FINISH FLOOR0' - 0"

SESW

STORAGE BUILDINGEAVE

26' - 0"

SESW

S1

S2

S3

S4

S5

S6

S7

SEAL:

SHEET TITLE:

SCALE:

PROJECT NO:

CHECKED:

SHEET

DESIGNED/DRAWN:

DATE:

/

As Noted

Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.

PRO

JEC

T IN

FOR

MA

TIO

N:

ISSUED FOR:

449 S. Virginia St.Fourth Floor

Reno, NV 89501(775) 827-1010www.bjginc.com

2/1

2/2

021 1

0:5

2:0

2 A

MJ:

\CD

\20

20\2

0200073A

\Dra

win

gs\

AB

MC

CO

MB

INE

D B

UIL

DIN

G O

VE

RA

LL F

OR

CU

P.r

vt

20200073

ABT

C C

ON

DIT

ION

AL

USE

PERM

IT S

UBM

ITTA

L

STORAGEBUILDING

A12.1

2/12/21

LO

GA

N R

OA

D F

ER

NLE

Y N

EV

AD

A

CONDITIONAL USEPERMIT

GEG GEG

2/12/21

SCALE: 1/16" = 1'-0" 1STORAGE BUILDING FLOOR PLANSCALE: 1/16" = 1'-0" 2STORAGE BUILDING WEST

SCALE: 1/16" = 1'-0" 3STORAGE BUILDING EAST

SCALE: 1/16" = 1'-0" 4STORAGE BUILDING NORTH

SCALE: 1/16" = 1'-0" 5STORAGE BUILDING SOUTH

INSULATED METALBUILDING PANEL

PAINTED CMUWAINSCOT TO 8'

INSULATED METALBUILDING PANEL

PAINTED CMUWAINSCOT TO 8'

INSULATED METALBUILDING PANEL

PAINTED CMUWAINSCOT TO 8'

INSULATED METALBUILDING PANEL

PAINTED CMUWAINSCOT TO 8'

SCALE: 1/16" = 1'-0" 6STORAGE BUILDING ROOF PLAN

THE STORAGE BUILDING HAS AREFLECTIVE WHITE STANDINGSEAM METAL ROOF.

REVISIONS

REV # DESCRIPTION DATE