Page 1: ABT meters

MAHARASHTRA STATE ELECTRICITY TRANSMISSION CO. LTD.PUNE

DIN E ISO 9001: 2000

PRESENTATION BY

400 KV R.S. , Jejuri

S.M. BAKRE , M.E. , M.M.S.

EXECUTIVE ENGINEER

ABT METERS

ON

Page 2: ABT meters

WELCOMEWELCOME

Page 3: ABT meters

Basic Concepts• Historical Preview• Principle of working • Meters Generations

• First - Ferrari or Electromechanical • Second - Static• Third - Numeric

Page 4: ABT meters
Page 5: ABT meters

Electromechanical or Ferrari Meters

• The First Generation meters based on rotation of Aluminum disk within current coil and pressure coil.

Page 6: ABT meters

Static Meter

• Advantages• High Accuracy• Low cost

• Limitations• Not ‘ intelligent ‘

Tamper can not be detected.

• Magnetic Theft

Page 7: ABT meters

ABT Meters

• ABT means Availability based Tariff .

Page 8: ABT meters

The term ‘Availability’ of ABT

• Indicates that the power MW should be available.

• It may specifically be noted that energy charge (at the specified plant-

specific rate) is not based on actual generation and plant output, but on

scheduled generation.

Page 9: ABT meters

Availability as a base• For example if the rated capacity of

generator is 50 MW out of which 30 MW generation is available , the base for billing would be 30 MW and not 50 MW. 30 MW would be scheduled generation for calculating deviation if any. If 20 MW power is generated instead of scheduled 30 MW , the penalty of 30-20 = 10 MW would be imposed as UI charge.

Page 10: ABT meters

ABT Concept • Traditional Concept :-

dw / dt

• Modern Concept :- dw/df . df/dt

• dw/df :- ABT Meters

• df./dt :- Frequency Trend

Page 11: ABT meters

Underfrequency Relay (UFR)

• UFR Settings• 48.8 Hz• 48.6 Hz• 48.2 Hz

Page 12: ABT meters

Frequency Trend Relay ( FTR )

•df/ dt Relay

Page 13: ABT meters

Implementation of ABT was recommended initially at Central Generating Stations in the year 1994 by M/s ECC of USA under the study sponsored by World Bank and Asian Development Bank .

Page 14: ABT meters

ABT tries to improve a quality of power and curtail the following

• Unacceptable rapid and high frequency deviations

• Frequent grid disturbances which result in generator tripping , power outages and grid instability.

• The pricing of power is made frequency dependent by ABT.

Page 15: ABT meters
Page 16: ABT meters

ABT Operation and Billing & Payment Mechanism

• The SEB’s give the LD its requirement in 15-minute blocks for the next day.

• At the same time the CGS stations also provide the LD their 15-minute availability positions.

Page 17: ABT meters

ABT Operation and Billing & Payment Mechanism

Based on the declared demand and available supply, the LD provides a schedule to the SEB’s and the CGS for drawl and generation in 15-minute blocks.

Page 18: ABT meters

ABT Operation and Billing & Payment Mechanism

• Based on the drawl and generation positions of the SEBs and the CGS stations, the UI bill is computed.

Page 19: ABT meters

The Three-part ABT Tariff

•Fixed Charge : This is payable by the beneficiary states based on the capacity allocated to them, and is irrespective of the amount of power they draw or schedule to draw

Page 20: ABT meters

The Three-part ABT Tariff

•Energy Charge: All the scheduled energy that is drawn is charged as per the variable energy charge of the station from which power is being drawn.

Page 21: ABT meters

The Three-part ABT Tariff

• UI Charge : The UI (Unscheduled Interchange) charge is levied on those units of energy that are a deviation from the schedule. This UI charge is frequency dependent.

Page 22: ABT meters

Billed Amount• Billed

Amount = Fixed Charge + Energy Charge + UI Charge

Page 23: ABT meters
Page 24: ABT meters
Page 25: ABT meters

The energy is metered in 15-minute time blocks, since frequency keeps changing (and the UI rate with it). The metered energy is then compared with the scheduled energy for that 15-minute time block, and the difference (+ or -) becomes the UI energy. Corresponding UI rate is determined by taking the average frequency for the same 15-minute time block into account.

Page 26: ABT meters

ABT Meters

• ‘ Intelligent ‘ meters

• Based on ‘polled approach ‘

Page 27: ABT meters

Principle of working of ABT meter

• The energy is recorded in terms of pulses per kWh . The principle of working of static ABT meter is sampling . The voltage and current singles are received from PT and CT respectively .The samples of these signal at a particular instant are collected by Sample and Hold circuit . The phase difference between voltage and current is also found out . These values are analogue values .

Page 28: ABT meters

Principle of working of ABT meter

• The CPU [ Central Processing Units ] only accepts digital signals . Therefore , the analogue signals are converted to digital by the circuit called ADC [Analogue to digital converter].The CPU processes these input signals for finding KVA [VI] , kWh [ VI cos ] , RKVA [ VI sin ] and other parameters . In order to measure the energy in terms of units , the circuit Energy to frequency converter is provided. The energy is converted into pulses . The counter counts number of pulses .

Page 29: ABT meters

( I1 2+ I2 2 + I3 2 +I4 2 ……….. +In

2 )IRMS = ------------------------------------------------------

n

( V1 2 + V2 2 + V3 2 +V4

2 ……….. +Vn 2 )

VRMS = ------------------------------------------------------ n

V1 I1 + V2 I2 + V3 I3 +V4 I4 ……….. +Vn In W = -------------------------------------------------------

n W cos = ----------------- VRMS IRMS

Sampling of a sinusoidal wave

Page 30: ABT meters

Functional Block Diagram of ABT Meter

Page 31: ABT meters
Page 32: ABT meters

3 Phase , 4 Wire Meters[ 3 wattmeter method ]

Page 33: ABT meters

3 Phase , 4 Wire Meters

W = W1 + W2 + W3 = VI cos + VI cos + VI cos = 3 VI cos

Page 34: ABT meters

General Arrangement

Page 35: ABT meters

General arrangement • Keypad - 12 numeric plus

* and # keys.• LCD Display – 4 row X 20

characters • Optical Port – RS232

electrically apart • Metering Module – with

sliding guides.• Calibrated LEDs – for dial

test.• MD Reset button -

sealable • RJ-11 Port - RS-485

interface with MODBUS.

Page 36: ABT meters
Page 37: ABT meters

METER TESTING LAB SETUP

• Program the AC Power Source to generate a particular waveform.

• Configure the reference meter.

• Set the pulse counter to zero.

• Turn ON / OFF the switch I at the beginning / end of the test.

• Record results and make calculations.

Page 38: ABT meters

METER TESTING LAB SETUP

Page 39: ABT meters

ZERA

Page 40: ABT meters

ABT Meter Testing • Dial Test - No. of

blinkings per kWh• Accuracy Test -

0.2 • Min. Current test• Max current test

Page 41: ABT meters

Test Terminal Block (TTB)

Page 42: ABT meters

Testing of ABT Meters

Page 44: ABT meters

Status of ABT meters at 400 KV Jejuri SS

Feeder / ICT Type Category

400 KV Lonikand MFM T2T

400 KV Stg IV MFM T2T

ICT – HV Side ABT T2T

ICT – LV Side ABT T2T

220 KV Baramati MFM T2T

220 KV Jejuri I MFM T2T

220 KV Jejuri II MFM T2T

220 KV Phursingi MFM T2T

Page 45: ABT meters

Advantages of ABT Meters

• These meters are capable of storing data . Therefore , the features such as load survey , energy history , tamper data etc is available. If the meter is stopped or tampered , the evidence is recorded .

Page 46: ABT meters

Advantages of ABT Meters

• These meters have higher accuracy of the order of 0.2 .

Page 47: ABT meters

Advantages of ABT Meters

•These meters are capable of displaying energy as per applicable tariff I.e. TOD and ABT tariff.

Page 48: ABT meters

Advantages of ABT Meters

• In the advent of load survey data , it

is possible to monitor the consumption

pattern.

Page 49: ABT meters

Advantages of ABT Meters• Using polled approach , the CPU detects abnormality in the metering system.

Page 50: ABT meters

Advantages of ABT Meters

• The starting current of is very less i.e. 0.1 % of base current. Thus 1 A meter will record

1 mA consumption.

Page 51: ABT meters

Advantages of ABT Meters

• The ABT meters have self diagnostic feature by which any

error developed in the inside component can be detected. This feature checks that the data stored in the

meter is safe and not corrupt.

Page 52: ABT meters

Advantages of ABT Meters• These meters are user friendly.

• The display parameters are easy to understand.

• Push button operation to read display parameters is easy.

• Data retrieval through MRI [ Meter Reading Instrument ] is simple .

Page 53: ABT meters

Advantages of ABT Meters

• MD can be reset through any of the modes :-

• MRI• Manual• Laptop• Auto

Page 54: ABT meters

Advantages of ABT Meters

• Remote data retrieval possible through internet and mobile.

• Can be used in AMR [ Automatic Meter Reading ]

Page 55: ABT meters

“OPEN ACCESS”, “WHEELING”

“Open access” and “wheeling” generally involve two parties, one supplying a certain quantum of power to the other through the regional / State grid. Any such transaction involves a number of parties, and disputes could arise in scheduling, energy accounting and commercial settlement, unless an appropriate framework is in place.

Page 56: ABT meters

“OPEN ACCESS”, “WHEELING”

Suppose party - A has contracted to supply 10 MW round the clock to party - B (in the same State) at a certain price (which need not be disclosed to others), through the State grid. Suppose the transmission loss apportioned to this transaction has been determined as 0.5 MW. Party - B would then be entitled to receive 9.5 MW, provided party - A is actually injecting 10.0 MW into the State grid at its end. In actual operation, both injection by A and drawl by B may fluctuate over the day and the differential may vary from 0.5 MW. Who would pick up the commercial liability arising on account of these deviations? Since A and B are physically apart and operationally independent, a pragmatic solution for commercial treatment in such a case would be to meter the actual injection of A and actual drawl of B in 15-minute time blocks, and separately compute their deviations from their respective schedules (10.0 MW / 2.5 MWh for A and 9.5 MW / 2.375 MWh for B).

Page 57: ABT meters

4 Quadrant Import Export Meter

Q2Export Lead

Q1 Import Lag

Q3Export Lag

Q4Import Lead

Page 58: ABT meters

ABT Specifications

Parameter Value

Standard IEC 687 , CBIP 88

Definition Billing Energy

Type of meter 3 phase , 4 Wire

Voltage Rating 400KV to 11KV/110 /3 V

Temperature 27 0C

Page 59: ABT meters

ABT Specifications

Parameter Value

Current Rating 1 Amp

Maximum Current [ 200 % of Ib ]

2 Amp

Minimum Current[ 0.1 % of Ib ]

1 mA

Class Of Accuracy 0.2

Frequency 50 Hz [ +- 5% ]

Page 60: ABT meters

ABT SpecificationsDisplay Parameters

1 ] 3 Voltages - Vr , Vy , Vb 2 ] 3 Currents - I r , Iy , Ib 3 ] Kwh Import & 4 ] Rkvah [ Lead ] Export modes 5 ] Rkvah [ Lag ] 6 ] Kvah 7 ] Date and Time 8 ] Power Factor 9 ] KVA MD

Page 61: ABT meters

ABT Specifications

• Modes of MD Reset • Manual• Auto• MRI • Laptop• Mobile Phone • Remote end

Page 62: ABT meters

Load Survey Data • 60 days data

on FIFO• Integration

period of 15 minutes

• LS reset available

• LS Parameters• 3 Voltages – Vr , Vy , Vb

• 3 Currents – Ir , Iy , Ib

• Date and Time• kWh • RKVAH [ Lag ]

RKVAH [ Lead ] KVAH

KVA [ MD ]

Pf

Page 63: ABT meters

Load Survey Data [ Graphical ]

Page 64: ABT meters

Tamper Data• Meter CPU generates tamper

events on polled approach.

• At least 320 tamper events should be memorized.

• Current Tamper• CT Reverse• CT Short• CT Unbalance

Page 65: ABT meters

Tamper Data

• Voltage Tamper• PT Missing• PT Low

• Power Tamper• Meter bypass

Page 66: ABT meters

ABT Specifications• Minimum retention time for NV

RAM >= 10 Years • Total Energy for billing = true

energy + harmonic energy • Principle of working – sampling• PCB – SMT [ Surface mounting

technology ]

Page 67: ABT meters

Surface Mount Technology [ SMT ]

• Lesser heat dissipation

• Long life of PCB and Components

• No component disconnection due to dry solder.

Page 68: ABT meters
Page 69: ABT meters

MRI – METER READING INSTRUMENT

Page 70: ABT meters

SANDS MRI

Page 71: ABT meters
Page 72: ABT meters
Page 73: ABT meters
Page 74: ABT meters

Specifications of MRIstandard IEC 1109 CBIP 111

ANSI

Communication UART , RS-232 , RS-485

rate of data transfer 130 bps [ bits per second ] to 115 Kbps.

Battery 7.2 Volts , 800 mah ‘Nickel Cadmium ‘ battery

Storage Capacity 8.5 MB

Page 75: ABT meters

Maintenance of MRI • Charging of MRI is the main maintenance

activity to be carried out. For 8 hour working , the MRI should be charged for 1 hour.

• If the MRI is not in use , it should be charged once in a week .

• It should be checked at least within a month that all MRI commands are working properly .

• Clean the surface of MRI with smooth wet cloth .

Page 76: ABT meters

MRI Commands • DOS

Commands • DIR• Date• Time• CLS• Ver• Vol• Path

• Firmware Commands• Master import• Master export• PC_Term• SH• TP• MSZ• TPRMRM

Page 77: ABT meters

The following disturbances are recorded by ABT meter :-

• ·  Harmonics• ·  Voltage dips and short

interruptions• ·  Conducted transients• ·  DC & AC magnetic fields • ·  Electromagnetic fields• Electromagnetic discharge

Page 78: ABT meters

Energy Management Software EMS

• The EMS is provided at all substations , Central Monitoring Station [ LD ] , Corporate / Zone / Circle / Division Office . The EMS is implemented for monitoring energy at interface points with inter-state / intra-state grid including all incoming & outgoing feeders / transformers / ICTs .

Page 79: ABT meters

Energy Management Software EMS

• The ABT / MFM meters are installed at the required points . The system software automatically collects data from these meters . The metering system is provided with RS485 communication port [ in form of RJ11 connector on its back ] . The communication cable has RJ11-to-RJ11 configuration. The data is collected online on RS485 MODBUS protocol.

Page 80: ABT meters

Energy Management Software EMS

• The data is made available at substations at the refreshing rate of 5 min using multiplexer or Data Concentrator Unit [ DCU ] and interfacing devices. The DCU stores 5 min. data for 30 days [ on FIFO ] basis . The reports can be generated. The EMS at LD has an access to their existing database i.e. Oracle 10g.

Page 81: ABT meters
Page 82: ABT meters

The system comprises of the following components

• Energy meters [ ABT and MFM ] at each substation.

• Data Concentrator Unit [ DCU ] at each substation.

• Global Positioning System [ GPS ] on PC at each substation.

• Data Acquisition Software [ DAS ] at each substation MYSQL as backend database.

• Networking [ switches and cables ] at each substation.

• EMS at LD with access to their existing database i.e. Oracle 10g as backend.

Page 83: ABT meters
Page 84: ABT meters

Pin Configuration No Pin Description

1 VR Red Phase Voltage

2 VY Yellow Phase Voltage

3 VB Blue Phase Voltage

4 IRIN Red Phase Current IN

5 IROUT Red Phase Current OUT

6 IYIN Yellow Phase Current IN

7 IYOUT Yellow Phase Current OUT

8 IBIN Blue Phase Current IN

9 IBOUT Blue Phase Current OUT

10 VN System neutral

Page 85: ABT meters

Pin Configuration

No Pin Description

11 Vac(L) Auxiliary AC Supply ( Live )

12 Vac(N) Auxiliary AC Supply ( Neutral )

13 Vdc(+) Auxiliary DC Supply ( Positive )

14 Vdc(-) Auxiliary DC Supply ( Negative )

15 г Earth connection

Page 86: ABT meters
Page 87: ABT meters
Page 88: ABT meters

Reports Generation

• PC Software • Instantaneous Data

• Billing Data• Load Survey Data

• Tamper Data

Page 89: ABT meters

Reports generated by EMS

• Energy Loss Report• Voltagewise Energy Loss

Report• Transformerwise Energy Loss

Report• Power ON/OFF Report• Voltage Profile Report

Page 90: ABT meters

Reports generated by EMS• Min-Max report for current , voltage ,

MW , MVAR , PF < frequency.• Transformer Loading Report• Alarm Report.• Meter Replacement Report• Load Survey Report• Load Shedding Report [ manual data

entry ]• Meter Detail Report

Page 91: ABT meters
Page 92: ABT meters
Page 93: ABT meters
Page 94: ABT meters
Page 95: ABT meters
Page 96: ABT meters
Page 97: ABT meters

CEA Regulations on Installation & Operation of meters

• MEAA – Meter for energy audit & accounting

MIT -Meter for interface

tariff MC - Meter for Consumer

Page 98: ABT meters

ABT Metering in MSETCL

• Interstate ABT Metering• Intra-state ABT Metering• No of ABT / MFM meters = 9000• No. of interface locations = 1500

Page 99: ABT meters

Basics of Tulip Communication

Page 100: ABT meters

Network Connectivity Devices

• Modems• Repeaters• Hubs• Bridges• Multiplexers• Switches• Routers• Brouters

Page 101: ABT meters

Clint – Server Model

Page 102: ABT meters
Page 103: ABT meters

Modem

• Performs modulation and demodulation

Page 104: ABT meters

Repeater

• Perform amplification of the signal to reduce attenuation.

Page 105: ABT meters

Hubs

• Hub is the multiport repeater

Page 106: ABT meters

Bridge •Connects two different networks

Page 107: ABT meters

Multiplexer ( MUX )

• Combines two or more signals on high speed transmission media

Page 108: ABT meters

Switches• Connects /

disconnects internet connectivity

Page 109: ABT meters

Routers

•Intelligent switches

Page 110: ABT meters

Brouters •Routers that follow all protocols

Page 111: ABT meters

Ethernet Cable

Page 112: ABT meters

RJ-11 Connector

Page 113: ABT meters

Tulip Communication System

Page 114: ABT meters

Ensure that

• Proper earthing is done.

• Network switch is ‘ ON ‘

• UPS is ‘ ON ‘

Page 115: ABT meters

How to test Tulip connectivity ?

• Contact ‘ ABT Room ‘ at SLDC , Kalwa • At Substation end , make following

operations on ABT PC – • Click on ‘ Start ‘ button .• Click on ‘ Run ‘ • Type the word ‘ CMD’ and click ‘ OK ‘ .• Type ‘ IPCONFIG ‘ and press enter button.• Type ‘ PING_code ‘ and press enter button. • The indication ‘healthy ‘ indicates healthiness

of the Tulip link.

Page 116: ABT meters

Check tulip configuration

• Visit the following website :- www.myconnect.tulipconnect.com

• Enter the following :-

username :- 6086

password :- satisfaction

Page 117: ABT meters

Maintenance of ABT-Tulip System

• AC/DC supply of PC / DCU /Tulip Devices should not be switched off in any case.

• The power points should be dedicated and should not be used for other purpose such as mobile charging .

• GPS should be always charged and running • The clock of meter /PC/MRI should be

accurate and as per GPS.

Page 118: ABT meters

Maintenance of ABT-Tulip System

• Ping test should be conducted daily to ensure that the data is transmitted to SLDC Kalwa at ping 172.16.0.1

• Any change in CTPT ratio should be configured in ABT meter and PC. The CC tool should be used for this purpose.

• No new transformer should be taken in service without ABT Configuration .

Page 119: ABT meters

Maintenance of ABT-Tulip System

• The wiring should be proper and should not be disturbed.

• The installation should be neat-clean and free from dust.

• In case AC supply is to be switched off , the PC should be shut down properly.

• In case of CT/PT/ meter failure , proper assessment of energy should be done.

Page 120: ABT meters

Maintenance of ABT-Tulip System

• Data should be retrieved using MRI on first date of the month particularly in respect of T2G feeder.

Page 121: ABT meters

Problems with ABT / Tulip

• ‘ No display ‘ problem.• Delay in Report Generation • MRI / MRI Software / Training not given • PC not working . Antivirus not installed. • The Tulip link is not healthy .

Page 122: ABT meters

Problems with ABT

• Energy Audit of Lines is not calculated. • Power ON/OFF Reports - EHV Substations

have bus PT and not line PT. Therefore the logic should be only ‘ Current OFF ‘ and not ‘ Voltage OFF ‘ or ‘Power OFF ‘ .

• ABT meters operate on auxiliary AC/DC supply . However , at almost all substations , ABT meters are connected on DC . This may create problem when there is DC leakage.

Page 123: ABT meters

Problems with ABT

• UPS of ABT trips on overvoltage / undervoltage at EHV substations . Therefore , it is required to provide stabilizer instead of UPS.

Page 124: ABT meters

Roadblocks in ABT meter commissioning

• At generating stations , the LV of generating transformer is connected directly to 33 KV bus. No CT / PT are provided.

• There is no adequate space in switchyard for providing CT/PT.

• Metering core not available in CTs. • 5 A CT are provided and not 1 A. • It is difficult to install ABT meter on outdoor

panels.

Page 125: ABT meters
Page 126: ABT meters

Commissioning of RTU

• RTU – Remote terminal Units• DC – data concentrators • Contract given to M/s Siemens vide MSETCL/CO/CE/CRA/RTU/T-0907/7088 dt

31-5-08.

Page 127: ABT meters
Page 128: ABT meters

AMR

Page 129: ABT meters

Connectivity with ERP System

• The Data Centers of ERP are connected to Tulip Hub at SLDC kalwa .

• The substations are connected to Tulip Hub.

• The rate of data transfer is 4 mbps.

• The connectivity is established through following servers –

• - ISP Router• ( Internet Service

Provider )• - Tulip intra-net

service provider router .

Page 130: ABT meters

Connectivity with ERP System

• Connectivity with Proxy Server

• Internet Explorer >• Internet Options >• Connections >• LAN Settings • Enter IP address of

Proxy server and Port number

Page 131: ABT meters
Page 132: ABT meters

TOD MetersTOD Meters

Page 133: ABT meters

TOD Tariff

TODSlot

Shift Surcharge /incentive

A 22.00-6.00 -0.75 per KwhB 6.00 – 9.00 0C 9.00 – 12.00 +0.60 per KwhB 12.00 – 18.00 0D 18.00 – 22.00 1.00 per Kwh

Page 134: ABT meters

HT Metering Kiosk

Page 135: ABT meters

Thank you