    KUWA14.633

    KUWA7.715

    KUWA14.125

    KUWA19.875

    D19.825

    D1-M30.499

    D1-M34.025

    D1-M34.836

    D1-M38.310

    TOTALS

    8 9 10 11 12 13 14 15 16 17Qtty Qtty Qtty Qtty Qtty Qtty Qtty Qtty Qtty Qtty

    14.782 11.726 13.329 12.455 5.643 9.812 5.643 9.812 5.37336 170.3130.000 23.452 26.659 24.910 11.285 19.623 11.285 19.623 10.74672 311.061

    103.473 82.082 93.306 87.184 39.498 68.681 39.498 68.681 37.61352 1192.188

    20.573 13.715 14.256 13.968 7.344 12.770 7.344 12.770 7.344 206.665

    80.865 44.197 49.118 46.419 19.584 39.323 19.584 31.537 19.584 666.370

    77.826 55.398 78.905 68.732 21.821 28.290 20.870 23.738 13.3845 786.265

    8.184 4.728 5.544 5.376 2.976 2.832 2.832 2.832 2.016 70.680

    2478.932 2879.216 4349.026 3743.566 5744.638 1288.974 1287.164 1288.974 2035.638 #########

    10.080 10.080 10.080 10.080 0.000 10.080 0.000 10.080 0.000 120.960

    LRB ON MAIN, DISTRIBUTRIES AND MINORS OF KUWA

  • 7/28/2019 Abstract for Vrb's

    3/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 176.206 173.641 1.66 3.2 2.565 27.234 b D/S Wing Walls Cum 2 1 176.206 173.641 1.66 3.2 2.565 27.234

    c Abutment Cum 2 1 176.206 173.641 6.8 1.8 2.565 62.791

    Total Cum 117.259

    Excavation for Hard Soil Cum 11.726

    Excavation for Soft Rock Cum 23.452

    Earth work in Hard Rock Cum 82.082

    2 Earth Filling Cum 82.082

    3

    a U/S Wing Walls Cum 2 1 173.941 173.641 1.66 3.2 0.300 3.185

    b D/S Wing Walls Cum 2 1 173.941 173.641 1.66 3.2 0.300 3.185

    c Abutment Cum 2 1 173.941 173.641 6.8 1.8 0.300 7.344

    PCC M15 Sub Structure Cum 13.715

    4

    a U/S Wing Walls Cum 2 1 176.206 173.941 0.829 3.275 2.265 12.306

    b D/S Wing Walls Cum 2 1 176.206 173.941 0.829 3.275 2.265 12.306

    c Abutment Cum 2 1 175.141 173.941 6.8 1.2 1.200 19.584

    Total Cum 44.197

    5

    i) 0.3m Thick Cum 2 1 176.206 175.141 6.800 0.3 1.065 4.345

    ii) 0.6m Thick Cum 2 1 175.441 175.141 6.800 0.6 0.300 2.448

    Total Cum 6.793

    6 Approach Slab Cum 2 1 173.941 173.791 3.5 6.4 0.150 6.720

    7 8.34 m Slab & Kerb Cum 37.134

    8 Parapet Wall Cum 2 1 176.706 176.206 16.54 0.2 0.500 3.308

    RCC M-20 53.956

    10 Wearing Coat in C.C. M30 Cum 1 1 176.206 176.131 9.54 6.4 0.075 4.579

    11 225MM THICK GRAVEL Cum 2 1 176.056 175.831 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    DESIGN FEATURES OF BT CROSSING AT K.M. 18.909 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    REMARKSLENGTH

    CC M10 Grade Concrete : Sub Structure

    NOS NO DESCRIPTION UNITQUANTITY

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    WIDTHDEPTH

    /HEIGHT

    10.080

    13.715

    44.197

    53.956

    11.726

    23.452

    82.082

    4.579

    2785.26

  • 7/28/2019 Abstract for Vrb's

    4/33

    Sl. No. DescriptionBar

    Mark/T eLength

    (m)Total

    Len th6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemaTotal(

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.18

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.523 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.75

    4 10mm 200mm C/C 2.000 34.000 2.530 5.060 3.137 3.13

    II Slabe and Kerb

    1 2527.

    0.39 197.69 61.41 1.58 2.47 3.86 2785.26

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    5/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 177.573 175.208 1.54 3.2 2.365 23.294

    b D/S Wing Walls Cum 2 1 177.573 175.208 1.54 3.2 2.365 23.294

    c Abutment Cum 2 1 177.573 175.208 6.8 1.8 2.365 57.895

    d Pier Cum 1 1 174.304 172.804 8.7 2.3 1.500 30.015

    Total Cum 134.499

    Excavation for Hard Soil Cum 13.450

    Excavation for Soft Rock Cum 26.900

    Earth work in Hard Rock Cum 94.149

    2 Earth Filling Cum 94.149

    3

    a U/S Wing Walls Cum 2 1 175.508 175.208 1.54 3.2 0.300 2.955

    b D/S Wing Walls Cum 2 1 175.508 175.208 1.54 3.2 0.300 2.955

    c Abutment Cum 2 1 175.508 175.208 6.8 1.8 0.300 7.344

    d Pier Cum 1 1 173.104 172.804 8.7 2.3 0.300 6.003

    PCC M10 Sub Structure Cum 19.257

    4

    a U/S Wing Walls Cum 2 1 177.573 175.508 0.769 3.275 2.065 10.408

    b D/S Wing Walls Cum 2 1 177.573 175.508 0.769 3.275 2.065 10.408

    c Abutment Cum 2 1 176.708 175.508 6.500 1.2 1.200 18.720

    d Pier i) Rectangular Cum 1 1 176.143 173.104 6.4 0.9 3.039 17.505

    ii) Semi Circular Cum 2 1 176.143 173.104 3.039 3.867

    Total Cum 60.907

    5

    i) 0.3m Thick Cum 2 1 177.573 176.708 6.500 0.3 0.865 3.374

    ii) 0.6m Thick Cum 2 1 177.008 176.708 6.500 0.6 0.300 2.340

    Total Cum 5.714

    6 Approach Slab Cum 2 1 175.508 175.358 3.5 6.4 0.150 6.720

    7 10.26 m Slab & Kerb Cum 33.877

    8 Parapet Wall Cum 2 1 178.073 177.573 7 0.2 0.500 1.400

    RCC M-20 47.710

    10 Wearing Coat in C.C. M30 Cum 1 1 177.573 177.498 12.36 6.4 0.075 5.933

    11 225MM THICK GRAVEL Cum 2 1 177.423 177.198 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C CumM 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    REMARKSLENGTH QUANTITY

    ESTIMATE OF VILLAGE ROAD BRIDGE AT K.M. 18.042 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NO DESCRIPTION UNIT

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    0.636

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    WIDTHDEPTH

    /HEIGHT

    19.257

    60.907

    13.450

    26.900

    94.149

    2478.93

    10.080

    47.710

    5.933

  • 7/28/2019 Abstract for Vrb's

    6/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 1.539 36.936 22.900 22.900

    25 No's of 12mm

    Straight Bar 2.000 5.000 1.539

    15.390 13.697 13.6973 10mm 200mm C/C 2.000 7.695 2.200 33.858 20.992 20.992

    4 10mm 200mm C/C 2.000 7.695 0.400 0.800 0.496 0.496

    II Slabe and Kerb

    1 2420.847

    0.39 45.01 14.59 1.58 2.47 3.86 2478.93

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    7/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    c Abutment Cum 2 1 173.216 170.911 6.8 1.8 2.305 56.426

    Total Cum 56.426

    Excavation for Hard Soil Cum 5.643

    Excavation for Soft Rock Cum 11.285

    Earth work in Hard Rock Cum 39.498

    2 Earth Filling Cum 39.498

    3

    c Abutment Cum 2 1 171.211 170.911 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 7.344

    4

    c Abutment Cum 2 1 172.521 171.211 6.8 1.2 1.310 21.379

    Total Cum 21.379

    5

    i) 0.3m Thick Cum 2 1 173.216 172.411 6.800 0.3 0.805 3.284

    ii) 0.6m Thick Cum 2 1 172.711 172.411 6.800 0.6 0.300 2.448

    Total Cum 5.732

    7 3.00 m Slab & Kerb Cum 7.261

    8 Parapet Wall Cum 2 1 173.716 173.216 4.2 0.2 0.500 0.840

    RCC M-20 13.833

    10 Wearing Coat in C.C. M30 Cum 1 1 173.216 173.141 4.2 6.4 0.075 2.016

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    RCC M20 for Bed Block over Abutment

    LEVEL

    CC M10 Grade Concrete : Sub Structure

    CC - M15 Grade Super Structure

    NODESCRIPTION UNIT

    DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 11.585 ON D-1 DISTRIBUTORY OFKUWA BRANCH CANAL OF INDIRA SAGAR PROJECT

    REMARKSLENGTH WIDTHDEPTH

    /HEIGHTQUANTITY

    S NO

  • 7/28/2019 Abstract for Vrb's

    8/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 194.054 191.489 1.66 3.2 2.565 27.234

    b D/S Wing Walls Cum 2 1 194.054 191.489 1.66 3.2 2.565 27.234

    c Abutment Cum 2 1 194.054 191.489 6.8 1.8 2.565 62.791

    Total Cum 117.259

    Excavation for Hard Soil Cum 11.726

    Excavation for Soft Rock Cum 23.452

    Earth work in Hard Rock Cum 82.082

    2 Earth Filling Cum 82.082

    3

    a U/S Wing Walls Cum 2 1 191.789 191.489 1.66 3.2 0.300 3.185

    b D/S Wing Walls Cum 2 1 191.789 191.489 1.66 3.2 0.300 3.185

    c Abutment Cum 2 1 191.789 191.489 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 13.715

    4

    a U/S Wing Walls Cum 2 1 194.054 191.789 0.829 3.275 2.265 12.306

    b D/S Wing Walls Cum 2 1 194.054 191.789 0.829 3.275 2.265 12.306

    c Abutment Cum 2 1 192.989 191.789 6.8 1.2 1.200 19.584

    Total Cum 44.197

    5

    i) 0.3m Thick Cum 2 1 194.054 192.989 6.800 0.3 1.065 4.345ii) 0.6m Thick Cum 2 1 193.289 192.989 6.800 0.6 0.300 2.448

    Total Cum 6.793

    6 Approach Slab Cum 2 1 191.789 191.639 3.5 6.4 0.150 6.720

    7 8.65 m Slab & Kerb Cum 38.515

    8 Parapet Wall Cum 2 1 194.554 194.054 15.65 0.2 0.500 3.130

    RCC M-20 55.158

    10 Wearing Coat in C.C. M30 Cum 1 1 194.054 193.979 8.65 6.4 0.075 4.152

    11 225MM THICK GRAVEL Cum 2 1 193.904 193.679 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    REMARKSLENGTH WIDTHUNIT

    QUANTITY

    RCC M20 for Bed Block over Abutment

    DEPTH/HEIGHTDESCRIPTION

    CC - M15 Grade Super Structure

    NOS NO

    11.726

    DESIGN FEATURES OF CT CROSSING AT K.M. 11.545 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    13.715

    44.197

    55.158

    23.452

    82.082

    10.080

    4.152

    2879.22

  • 7/28/2019 Abstract for Vrb's

    9/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.520

    3 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 2.530 5.060 3.137 3.137

    II Slabe and Kerb

    1 2621.623

    0.39 197.69 61.41 1.58 2.47 3.86 2879.22

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    10/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 203.016 200.211 1.90 3.2 2.805 34.109 b D/S Wing Walls Cum 2 1 203.016 200.211 1.90 3.2 2.805 34.109

    c Abutment Cum 2 1 203.016 200.211 6.8 1.8 2.805 68.666

    Total Cum 136.884

    Excavation for Hard Soil Cum 13.688

    Excavation for Soft Rock Cum 27.377

    Earth work in Hard Rock Cum 95.819

    2 Earth Filling Cum 95.819

    3

    a U/S Wing Walls Cum 2 1 200.511 200.211 1.90 3.2 0.300 3.648

    b D/S Wing Walls Cum 2 1 200.511 200.211 1.90 3.2 0.300 3.648

    c Abutment Cum 2 1 200.511 200.211 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 14.640

    4

    a U/S Wing Walls Cum 2 1 203.016 200.511 0.950 3.275 2.505 15.587

    b D/S Wing Walls Cum 2 1 203.016 200.511 0.950 3.275 2.505 15.587

    c Abutment Cum 2 1 201.711 200.511 6.8 1.2 1.200 19.584

    Total Cum 50.759

    5

    i) 0.3m Thick Cum 2 1 203.016 201.711 6.800 0.3 1.305 5.324

    ii) 0.6m Thick Cum 2 1 202.011 201.711 6.800 0.6 0.300 2.448

    Total Cum 7.772

    6 Approach Slab Cum 2 1 200.511 200.361 3.5 6.4 0.150 6.720

    7 10.80 m Slab & Kerb Cum 63.342

    8 Parapet Wall Cum 2 1 203.516 203.016 19.00 0.2 0.500 3.800

    RCC M-20 81.634

    10 Wearing Coat in C.C. M30 Cum 1 1 203.016 202.941 12.00 6.4 0.075 5.760

    11 225MM THICK GRAVEL Cum 2 1 202.866 202.641 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    WIDTHDEPTH

    /HEIGHT

    CC M10 Grade Concrete : Sub Structure

    NOS NO DESCRIPTION UNIT

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    QUANTITY

    DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 3.665 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    REMARKSLENGTH

    14.640

    50.759

    13.688

    27.377

    95.819

    4526.89

    10.080

    81.634

    5.760

  • 7/28/2019 Abstract for Vrb's

    11/33

    Sl. No. DescriptionBar

    Mark/T eLength

    (m)Total

    Len th6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemaTotal(

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.18

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.523 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.75

    4 10mm 200mm C/C 2.000 34.000 3.010 6.020 3.732 3.73

    II Slabe and Kerb

    1 4268.

    0.39 198.29 61.41 1.58 2.47 3.86 4526.89

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    12/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 200.824 198.149 1.73 3.2 2.675 29.532

    b D/S Wing Walls Cum 2 1 200.824 198.149 1.73 3.2 2.675 29.532

    c Abutment Cum 2 1 200.824 198.149 6.5 1.8 2.675 62.595

    Total Cum 121.659

    Excavation for Hard Soil Cum 12.166

    Excavation for Soft Rock Cum 24.332

    Earth work in Hard Rock Cum 85.161

    2 Earth Filling Cum 85.161

    3

    a U/S Wing Walls Cum 2 1 198.449 198.149 1.73 3.2 0.300 3.312

    b D/S Wing Walls Cum 2 1 198.449 198.149 1.73 3.2 0.300 3.312

    c Abutment Cum 2 1 198.449 198.149 6.5 1.8 0.300 7.020

    PCC M10 Sub Structure Cum 13.644

    4

    a U/S Wing Walls Cum 2 1 200.824 198.449 0.863 3.275 2.375 13.417

    b D/S Wing Walls Cum 2 1 200.824 198.449 0.863 3.275 2.375 13.417

    c Abutment Cum 2 1 199.649 198.449 6.5 1.2 1.200 18.720

    Total Cum 45.555

    5

    i) 0.3m Thick Cum 2 1 200.824 199.649 6.500 0.3 1.175 4.583ii) 0.6m Thick Cum 2 1 199.949 199.649 6.500 0.6 0.300 2.340

    Total Cum 6.923

    6 Approach Slab Cum 2 1 198.449 198.299 3.5 6.4 0.150 6.720

    7 10.00 m Slab & Kerb Cum 51.130

    8 Parapet Wall Cum 2 1 201.324 200.824 18.2 0.2 0.500 3.640

    RCC M-20 68.413

    10 Wearing Coat in C.C. M30 Cum 1 1 200.824 200.749 11.2 6.4 0.075 5.376

    11 225MM THICK GRAVEL Cum 2 1 200.674 200.449 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    LENGTH

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    DEPTH/HEIGHTDESCRIPTION

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    ESTIMATE OF VILLAGE ROAD BRIDGE AT K.M. 1.50 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NOWIDTH

    UNITQUANTITY REMARKS

    13.644

    45.555

    12.166

    24.332

    85.161

    3732.34

    10.080

    68.413

    5.376

  • 7/28/2019 Abstract for Vrb's

    13/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.500 156.000 96.720 96.720

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.500 65.000 57.850 57.850

    3 10mm 200mm C/C 2.000 32.500 2.200 143.000 88.660 88.660

    4 10mm 200mm C/C 2.000 32.500 2.750 5.500 3.410 3.410

    II Slabe and Kerb

    1 3485.700

    0.39 189.41 58.74 1.58 2.47 3.86 3732.34

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    14/33

  • 7/28/2019 Abstract for Vrb's

    15/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.520

    3 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 3.010 6.020 3.732 3.732

    II Slabe and Kerb

    1 60702.750

    0.39 198.29 61.41 1.58 2.47 3.86 60960.94

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    16/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 192.145 189.650 1.62 3.2 2.495 25.820 b D/S Wing Walls Cum 2 1 192.145 189.650 1.62 3.2 2.495 25.820

    c Abutment Cum 2 1 192.145 189.650 6.8 1.8 2.495 61.078

    d Pier Cum 1 1 187.395 185.895 9 2.6 1.500 35.100

    Total Cum 147.818

    Excavation for Hard Soil Cum 14.782

    Excavation for Soft Rock Cum

    Earth work in Hard Rock Cum 103.473

    2 Earth Filling Cum 103.473

    3

    a U/S Wing Walls Cum 2 1 189.950 189.650 1.62 3.2 0.300 3.105

    b D/S Wing Walls Cum 2 1 189.950 189.650 1.62 3.2 0.300 3.105

    c Abutment Cum 2 1 189.950 189.650 6.8 1.8 0.300 7.344

    d Pier Cum 1 1 186.195 185.895 9 2.6 0.300 7.020

    PCC M10 Sub Structure Cum 20.573

    4

    a U/S Wing Walls Cum 2 1 192.145 189.950 0.808 3.275 2.195 11.624

    b D/S Wing Walls Cum 2 1 192.145 189.950 0.808 3.275 2.195 11.624

    c Abutment Cum 2 1 191.150 189.950 6.500 1.2 1.200 18.720

    d Pier

    i) Rectangular Cum 1 1 191.075 186.195 6.4 1 4.880 31.232

    ii) Semi Circular Cum 2 1 191.075 186.195 4.880 7.665

    Total Cum 80.865

    5

    i) 0.3m Thick Cum 2 1 192.145 191.150 6.500 0.3 0.995 3.881

    ii) 0.6m Thick Cum 2 1 191.450 191.150 6.500 0.6 0.300 2.340

    Total Cum 6.220

    6 Approach Slab Cum 2 1 189.950 189.800 3.5 6.4 0.150 6.720

    7 14.85 m Slab & Kerb Cum 60.0768 Parapet Wall Cum 2 1 192.645 192.145 24.05 0.2 0.500 4.810

    RCC M-20 77.826

    10 Wearing Coat in C.C. M30 Cum 1 1 192.145 192.070 17.05 6.4 0.075 8.184

    11 225MM THICK GRAVEL Cum 2 1 191.995 191.770 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    WIDTH DEPTH/HEIGHT

    QUANTITY

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    0.785

    DESIGN FEATURES OF BT CROSSING AT K.M. 14.633 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NO DESCRIPTION UNITREMARKSLENGTH

    20.573

    80.865

    14.782

    0.000

    103.473

    2478.93

    10.080

    77.826

    8.184

  • 7/28/2019 Abstract for Vrb's

    17/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemaTotal(

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 1.617 38.808 24.061 24.06

    2 5 No's of 12mm Straight Bar 2.000 5.000 1.617 16.170 14.391 14.393 10mm 200mm C/C 2.000 8.085 2.200 35.574 22.056 22.05

    4 10mm 200mm C/C 2.000 8.085 0.400 0.800 0.496 0.49

    II Slabe and Kerb

    1 4092.

    0.39 47.23 15.28 1.58 2.47 3.86 4153.48

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    18/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 196.169 193.604 1.66 3.2 2.565 27.234

    b D/S Wing Walls Cum 2 1 196.169 193.604 1.66 3.2 2.565 27.234

    c Abutment Cum 2 1 196.169 193.604 6.8 1.8 2.565 62.791

    Total Cum 117.259

    Excavation for Hard Soil Cum 11.726

    Excavation for Soft Rock Cum 23.452

    Earth work in Hard Rock Cum 82.082

    2 Earth Filling Cum 82.082

    3

    a U/S Wing Walls Cum 2 1 193.904 193.604 1.66 3.2 0.300 3.185

    b D/S Wing Walls Cum 2 1 193.904 193.604 1.66 3.2 0.300 3.185

    c Abutment Cum 2 1 193.904 193.604 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 13.715

    4

    a U/S Wing Walls Cum 2 1 196.169 193.904 0.829 3.275 2.265 12.306

    b D/S Wing Walls Cum 2 1 196.169 193.904 0.829 3.275 2.265 12.306

    c Abutment Cum 2 1 195.104 193.904 6.8 1.2 1.200 19.584

    Total Cum 44.197

    5

    i) 0.3m Thick Cum 2 1 196.169 195.104 6.800 0.3 1.065 4.345ii) 0.6m Thick Cum 2 1 195.404 195.104 6.800 0.6 0.300 2.448

    Total Cum 6.793

    6 Approach Slab Cum 2 1 193.904 193.754 3.5 6.4 0.150 6.720

    7 8.65 m Slab & Kerb Cum 38.515

    8 Parapet Wall Cum 2 1 196.669 196.169 16.85 0.2 0.500 3.370

    RCC M-20 55.398

    9 Wearing Coat in C.C. M30 Cum 1 1 196.169 196.094 9.85 6.4 0.075 4.728

    10 225MM THICK GRAVEL Cum 2 1 196.019 195.794 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    LENGTH

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    DEPTH/HEIGHTDESCRIPTION

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    DESIGN FEATURES OF BT CROSSING AT K.M. 7.715 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NOWIDTH

    UNITQUANTITY REMARKS

    13.715

    44.197

    11.726

    23.452

    82.082

    2879.22

    10.080

    55.398

    4.728

  • 7/28/2019 Abstract for Vrb's

    19/33

  • 7/28/2019 Abstract for Vrb's

    20/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 202.814 200.009 1.80 3.2 2.805 32.314 b D/S Wing Walls Cum 2 1 202.814 200.009 1.80 3.2 2.805 32.314

    c Abutment Cum 2 1 202.814 200.009 6.8 1.8 2.805 68.666

    Total Cum 133.294

    Excavation for Hard Soil Cum 13.329

    Excavation for Soft Rock Cum 26.659

    Earth work in Hard Rock Cum 93.306

    2 Earth Filling Cum 93.306

    3

    a U/S Wing Walls Cum 2 1 200.309 200.009 1.80 3.2 0.300 3.456

    b D/S Wing Walls Cum 2 1 200.309 200.009 1.80 3.2 0.300 3.456

    c Abutment Cum 2 1 200.309 200.009 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 14.256

    4

    a U/S Wing Walls Cum 2 1 202.814 200.309 0.900 3.275 2.505 14.767

    b D/S Wing Walls Cum 2 1 202.814 200.309 0.900 3.275 2.505 14.767

    c Abutment Cum 2 1 201.509 200.309 6.8 1.2 1.200 19.584

    Total Cum 49.118

    5

    i) 0.3m Thick Cum 2 1 202.814 201.509 6.800 0.3 1.305 5.324

    ii) 0.6m Thick Cum 2 1 201.809 201.509 6.800 0.6 0.300 2.448

    Total Cum 7.772

    6 Approach Slab Cum 2 1 200.309 200.159 3.5 6.4 0.150 6.720

    7 10.35 m Slab & Kerb Cum 60.703

    8 Parapet Wall Cum 2 1 203.314 202.814 18.55 0.2 0.500 3.710

    RCC M-20 78.905

    10 Wearing Coat in C.C. M30 Cum 1 1 202.814 202.739 11.55 6.4 0.075 5.544

    11 225MM THICK GRAVEL Cum 2 1 202.664 202.439 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    LENGTH

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    DEPTH/HEIGHTDESCRIPTION

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 4.125 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NOWIDTH

    UNITQUANTITY REMARKS

    14.256

    49.118

    13.329

    26.659

    93.306

    4349.03

    10.080

    78.905

    5.544

  • 7/28/2019 Abstract for Vrb's

    21/33

    FEATUR

    Sl. No. DescriptionBar

    Mark/T eLength

    (m)Total

    Len th6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemaTotal(

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.18

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.523 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.75

    4 10mm 200mm C/C 2.000 34.000 3.010 6.020 3.732 3.73

    II Slabe and Kerb

    1 4090.

    0.39 198.29 61.41 1.58 2.47 3.86 4349.03

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    22/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 177.245 174.570 1.73 3.2 2.675 29.532

    b D/S Wing Walls Cum 2 1 177.245 174.570 1.73 3.2 2.675 29.532

    c Abutment Cum 2 1 177.245 174.570 6.8 1.8 2.675 65.484

    Total Cum 124.548

    Excavation for Hard Soil Cum 12.455

    Excavation for Soft Rock Cum 24.910

    Earth work in Hard Rock Cum 87.184

    2 Earth Filling Cum 87.184

    3

    a U/S Wing Walls Cum 2 1 174.870 174.570 1.73 3.2 0.300 3.312

    b D/S Wing Walls Cum 2 1 174.870 174.570 1.73 3.2 0.300 3.312

    c Abutment Cum 2 1 174.870 174.570 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 13.968

    4

    a U/S Wing Walls Cum 2 1 177.245 174.870 0.863 3.275 2.375 13.417

    b D/S Wing Walls Cum 2 1 177.245 174.870 0.863 3.275 2.375 13.417

    c Abutment Cum 2 1 176.070 174.870 6.8 1.2 1.200 19.584

    Total Cum 46.419

    5

    i) 0.3m Thick Cum 2 1 177.245 176.070 6.800 0.3 1.175 4.794ii) 0.6m Thick Cum 2 1 176.370 176.070 6.800 0.6 0.300 2.448

    Total Cum 7.242

    6 Approach Slab Cum 2 1 174.870 174.720 3.5 6.4 0.150 6.720

    7 10.00 m Slab & Kerb Cum 51.130

    8 Parapet Wall Cum 2 1 177.745 177.245 18.2 0.2 0.500 3.640

    RCC M-20 68.732

    10 Wearing Coat in C.C. M30 Cum 1 1 177.245 177.170 11.2 6.4 0.075 5.376

    11 225MM THICK GRAVEL Cum 2 1 177.095 176.870 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    LENGTH

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    DEPTH/HEIGHTDESCRIPTION

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 19.875 ON

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NOWIDTH

    UNITQUANTITY REMARKS

    13.968

    46.419

    12.455

    24.910

    87.184

    3743.57

    10.080

    68.732

    5.376

  • 7/28/2019 Abstract for Vrb's

    23/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.520

    3 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 2.750 5.500 3.410 3.410

    II Slabe and Kerb

    1 3485.700

    0.39 197.97 61.41 1.58 2.47 3.86 3743.57

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    24/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    c Abutment Cum 2 1 176.776 174.471 6.8 1.8 2.305 56.426

    Total Cum 56.426

    Excavation for Hard Soil Cum 5.643

    Excavation for Soft Rock Cum 11.285

    Earth work in Hard Rock Cum 39.498

    2 Earth Filling Cum 39.498

    3

    c Abutment Cum 2 1 174.771 174.471 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 7.344

    4

    c Abutment Cum 2 1 175.971 174.771 6.8 1.2 1.200 19.584

    Total Cum 19.584

    5

    i) 0.3m Thick Cum 2 1 176.776 175.971 6.800 0.3 0.805 3.284

    ii) 0.6m Thick Cum 2 1 176.271 175.971 6.800 0.6 0.300 2.448

    Total Cum 5.732

    7 5.00 m Slab & Kerb 14.849

    8 Parapet Wall Cum 2 1 177.276 176.776 6.2 0.2 0.500 1.240

    RCC M-20 21.821

    10 Wearing Coat in C.C. M30 Cum 1 1 176.776 176.701 6.2 6.4 0.075 2.976

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    DESIGN FEATURES OF DOUBLE LANE ROAD BRIDGE AT K.M. 9.825 ON D-1 DISTRIBUTORY OFKUWA BRANCH CANAL OF INDIRA SAGAR PROJECT

    REMARKSLENGTH WIDTHDEPTH

    /HEIGHTQUANTITY

    S NO

    LEVEL

    CC M10 Grade Concrete : Sub Structure

    CC - M15 Grade Super Structure

    NODESCRIPTION UNIT

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    RCC M20 for Bed Block over Abutment

    7.344

    19.584

    5.643

    11.285

    39.498

    5744.64

    21.821

    2.976

  • 7/28/2019 Abstract for Vrb's

    25/33

    Sl. No. DescriptionBar

    Mark/T eLength

    (m)Total

    Len th6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarTotal( K

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.5203 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 0.550 1.100 0.682 0.682

    II Slabe and Kerb

    1 5489.5

    0.39 195.24 61.41 1.58 2.47 3.86 5744.64

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    26/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 193.133 190.828 1.41 3.2 2.305 20.845

    b D/S Wing Walls Cum 2 1 193.133 190.828 1.41 3.2 2.305 20.845

    c Abutment Cum 2 1 193.133 190.828 6.8 1.8 2.305 56.426

    Total Cum 98.116

    Excavation for Hard Soil Cum 9.812

    Excavation for Soft Rock Cum 19.623

    Earth work in Hard Rock Cum 68.681

    2 Earth Filling Cum 68.681

    3

    a U/S Wing Walls Cum 2 1 191.128 190.828 1.41 3.2 0.300 2.713

    b D/S Wing Walls Cum 2 1 191.128 190.828 1.41 3.2 0.300 2.713

    c Abutment Cum 2 1 191.128 190.828 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 12.770

    4

    a U/S Wing Walls Cum 2 1 193.133 191.128 0.751 3.275 2.005 9.869

    b D/S Wing Walls Cum 2 1 193.133 191.128 0.751 3.275 2.005 9.869

    c Abutment Cum 2 1 192.328 191.128 6.8 1.2 1.200 19.584

    Total Cum 39.323

    5

    i) 0.3m Thick Cum 2 1 193.133 192.328 6.800 0.3 0.805 3.284

    ii) 0.6m Thick Cum 2 1 192.628 192.328 6.800 0.6 0.300 2.448

    Total Cum 5.732

    6 Approach Slab Cum 2 1 191.128 190.978 3.5 6.4 0.150 6.720

    7 4.70 m Slab & Kerb Cum 13.958

    8 Parapet Wall Cum 2 1 193.633 193.133 9.4 0.2 0.500 1.880

    RCC M-20 28.290

    10 Wearing Coat in C.C. M30 Cum 1 1 193.133 193.058 5.9 6.4 0.075 2.832

    11 225MM THICK GRAVEL Cum 2 1 192.983 192.758 3.5 6.4 0.225 10.080

    12 Reinforcement

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super Structure

    DESIGN FEATURES OF M T ROAD AT K.M. 0.499 ON MINOR M-3 OF D-1 DISTRIBUTORY OF

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    CC M10 Grade Concrete : Sub Structure

    NOS NO DESCRIPTION UNITREMARKSLENGTH WIDTH

    DEPTH/HEIGHT

    QUANTITY

    19.623

    68.681

    9.812

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

  • 7/28/2019 Abstract for Vrb's

    27/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.520

    3 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 2.010 4.020 2.492 2.492

    II Slabe and Kerb

    1 1032.026

    0.39 197.05 61.41 1.58 2.47 3.86 1288.97

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Grand Total=

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

  • 7/28/2019 Abstract for Vrb's

    28/33

  • 7/28/2019 Abstract for Vrb's

    29/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.520

    3 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 0.550 1.100 0.682 0.682

    II Slabe and Kerb

    1 1032.026

    0.39 195.24 61.41 1.58 2.47 3.86 1287.16

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    30/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    a U/S Wing Walls Cum 2 1 181.359 179.054 1.41 3.2 2.305 20.845 b D/S Wing Walls Cum 2 1 181.359 179.054 1.41 3.2 2.305 20.845

    c Abutment Cum 2 1 181.359 179.054 6.8 1.8 2.305 56.426

    Total Cum 98.116

    Excavation for Hard Soil Cum 9.812

    Excavation for Soft Rock Cum 19.623

    Earth work in Hard Rock Cum 68.681

    2 Earth Filling Cum 68.681

    3

    a U/S Wing Walls Cum 2 1 179.354 179.054 1.41 3.2 0.300 2.713

    b D/S Wing Walls Cum 2 1 179.354 179.054 1.41 3.2 0.300 2.713

    c Abutment Cum 2 1 179.354 179.054 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 12.770

    4

    a U/S Wing Walls Cum 2 1 181.359 179.354 1.213 3.275 2.005 15.930

    b D/S Wing Walls Cum 2 1 181.359 179.354 0.756 3.275 2.005 9.935

    c Abutment Cum 2 1 180.554 179.354 1.970 1.2 1.200 5.672

    Total Cum 31.537

    5

    i) 0.3m Thick Cum 2 1 181.359 180.554 1.970 0.3 0.805 0.951

    ii) 0.6m Thick Cum 2 1 180.854 180.554 1.970 0.6 0.300 0.709

    Total Cum 1.660

    6 Approach Slab Cum 2 1 179.354 179.204 3.5 6.4 0.150 6.720

    7 4.70 m Slab & Kerb Cum 13.958

    8 Parapet Wall Cum 2 1 181.859 181.359 7 0.2 0.500 1.400

    RCC M-20 23.738

    10 Wearing Coat in C .C. M30 Cum 1 1 181.359 181.284 5.9 6.4 0.075 2.832

    11 225MM THICK GRAVEL Cum 2 1 181.209 180.984 3.5 6.4 0.225 10.080

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat Cum

    5 HYSD Steel Kg

    6 Gravel Cum

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    RCC M20 for Bed Block over Abutment

    CC - M15 Grade Super S tructure

    WIDTHDEPTH

    /HEIGHT

    CC M10 Grade Concrete : Sub Structure

    NOS NO DESCRIPTION UNITQUANTITY

    DESIGN FEATURES OF M T ROAD AT K.M. 4.836 ON MINOR M-3 OF D-1 DISTRIBUTORY OF

    KUWA BRANCH CANAL OF INDIRA SAGAR PROJECTLEVEL

    REMARKSLENGTH

    12.770

    31.537

    9.812

    19.623

    68.681

    1288.97

    10.080

    23.738

    2.832

  • 7/28/2019 Abstract for Vrb's

    31/33

    Sl. No. DescriptionBar

    Mark/T eLength

    (m)Total

    Len th6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemaTotal(

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.18

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.523 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.75

    4 10mm 200mm C/C 2.000 34.000 2.010 4.020 2.492 2.49

    II Slabe and Kerb

    1 1032.

    0.39 197.05 61.41 1.58 2.47 3.86 1288.97

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=

  • 7/28/2019 Abstract for Vrb's

    32/33

    TOP BOTTOM

    in mts in mts in mts in mts in mts in Cum1 2 3 4 5 6 7 8 9 10 11

    1 Earth Work Excavation

    c Abutment Cum 2 1 155.131 152.936 6.8 1.8 2.195 53.734

    Total Cum 53.734

    Excavation for Hard Soil Cum 5.373

    Excavation for Soft Rock Cum 10.747

    Earth work in Hard Rock Cum 37.614

    2 Earth Filling Cum 37.614

    3

    c Abutment Cum 2 1 153.236 152.936 6.8 1.8 0.300 7.344

    PCC M10 Sub Structure Cum 7.344

    4

    c Abutment Cum 2 1 154.436 153.236 6.8 1.2 1.200 19.584

    Total Cum 19.584

    5

    i) 0.3m Thick Cum 2 1 155.131 154.436 6.800 0.3 0.695 2.836

    ii) 0.6m Thick Cum 2 1 154.736 154.436 6.800 0.6 0.300 2.448

    Total Cum 5.284

    7 3.00 m Slab & Kerb Cum 7.261

    8 Parapet Wall Cum 2 1 155.631 155.131 4.2 0.2 0.500 0.840

    RCC M-20 13.385

    10 Wearing Coat in C.C. M30 Cum 1 1 155.131 155.056 4.2 6.4 0.075 2.016

    1 Hard Soil Cum

    Soft Rock Cum

    Hard Rock Cum

    2 Sub Structure

    P.C.C Cum

    M 10 Conc Cum

    3 Super Structure Cum

    M 20 Cum

    RCC M-20 Cum

    4 Wearing Coat M30 Cum

    5 HYSD Steel Kg

    Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    RCC M20 for Bed Block over Abutment

    LEVEL

    CC M10 Grade Concrete : Sub Structure

    CC - M15 Grade Super Structure

    NODESCRIPTION UNIT

    DESIGN FEATURES OF C T ROAD AT K.M. 8.31 ON MINOR M-3 OF D-1 DISTRIBUTORY OFKUWA BRANCH CANAL OF INDIRA SAGAR PROJECT

    REMARKSLENGTH WIDTHDEPTH

    /HEIGHTQUANTITY

    S NO

    7.344

    19.584

    5.373

    10.747

    37.614

    2035.64

    13.385

    2.016

  • 7/28/2019 Abstract for Vrb's

    33/33

    Sl. No. DescriptionBar

    Mark/TypeLength

    (m)Total

    Length6mm(0.22)

    8mm(.39)

    10 mm(0.62)

    12 mm(0.89)

    16 mm(1.58)

    20mm(2.47)

    25mm(2.47)

    RemarksTotal( Kg)

    0.22 0.39 0.62 0.89 1.58 2.47 3.86I Bed Blocks

    1 12 No.10mm at Top and Bottom Straight Bar 2.000 12.000 6.800 163.200 101.184 101.184

    2 5 No's of 12mm Straight Bar 2.000 5.000 6.800 68.000 60.520 60.520

    3 10mm 200mm C/C 2.000 34.000 2.200 149.600 92.752 92.752

    4 10mm 200mm C/C 2.000 34.000 0.550 1.100 0.682 0.682

    II Slabe and Kerb

    1 1780.500

    0.39 195.24 61.41 1.58 2.47 3.86 2035.64

    STEEL REINFORCEMENT ESTIMATION

    Nos

    Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

    Grand Total=