This slideshow highlights the work of the SWC
This slideshow highlights the work of the SWC
The mission of the Stillaguamish Watershed
Council (SWC) is to maintain a healthy,
functioning Stillaguamish Watershed by
providing a local forum in which agencies,
organizations, communities, and the public can
engage in a collaborative watershed based
process of decision making and coordination.
Location
Scope of Work
Old Dike Restoration
Old Dike Before
Old Dike During
Old Dike After
West Dike Restoration
West Dike Before
West Dike During
West Dike After
East Dike Restoration
East Dike Before
East Dike During
East Dike After
New Dike Construction
New Dike Before
New Dike During
New Dike After
Aerial View of Arlington’s Stormwater
Wetland Near Haller Park
Volunteers planting native
vegetation at the wetland
Pulling Weeds
Pulling Weeds
Documenting Knotweed
Culvert Before
During
Bridge After
Bank Before
Bank During
Bank After
Restoration overview
Kline Farm Planting?
During
Pilchuck Park Schematic
Pilchuck Park Before
Pilchuck Park Kiosk
Kiosk during construction Kiosk finished
Pilchuck Park PlantingInmate Crew Planting
Emergent Plants
Containers awaiting planting
Students Planting Natural Resources Planting
Pilchuck Park Large Woody Debris