1 TO: All Plan Holders RE: ABERDEEN HIGH SCHOOL – STADIUM AND WEIGHT ROOM UPGRADES Harford County Public Schools Please find the enclosed Addendum No. 1, dated March 24, 2014. Addendum No. 1 consists of the following: Cover sheet – 1 page Pre-Bid Sign-in Sheet – 2 pages Bid RFI questions and responses – 12 pages Addendum No. 1 Clarifications – 8 pages Addendum No. 1 8-1/2” x 11” Sketches – 11 pages Sketches C1-1 thru C1-6 Sketches A1-1 and A1-2 Sketches S1-1 and S1-2 Sketch E1-1 Addendum No. 1 consists of thirty-four (34) pages. Advise Harford County Public Schools at once if any attachments are missing.
34
Embed
ABERDEEN HIGH SCHOOL – STADIUM AND WEIGHT ROOM UPGRADES · - The specs list prevailing wages but nothing actually ... Aberdeen High School Stadium and Weight Room Upgrades ... ABERDEEN
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
TO: All Plan Holders
RE: ABERDEEN HIGH SCHOOL – STADIUM AND WEIGHT ROOM UPGRADES
Harford County Public Schools
Please find the enclosed Addendum No. 1, dated March 24, 2014. Addendum No. 1 consists of the
following:
Cover sheet – 1 page
Pre-Bid Sign-in Sheet – 2 pages
Bid RFI questions and responses – 12 pages
Addendum No. 1 Clarifications – 8 pages
Addendum No. 1 8-1/2” x 11” Sketches – 11 pages
Sketches C1-1 thru C1-6
Sketches A1-1 and A1-2
Sketches S1-1 and S1-2
Sketch E1-1
Addendum No. 1 consists of thirty-four (34) pages. Advise Harford County Public Schools at once if any
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
BID 001
Please consider the attached Substitution Request to include S-5! ColorGard by S-5! Metal Roof Innovations,Ltd. as an equal in Section 07 41 13, Paragraph 2.8 A: Snow Guards
Please reply with your response to my email address listed below. I remain available if your have anyquestions or need additional documentation or information.
Harry Lubitz / S-5! Metal Roof Innovations
3/10/14
No exceptions taken. Manuf. will be added by addendum.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
This Spec. requires AISC Cert. for the fabricator and erector but gives an alternative procedure for thefabricator. Would you request that the erector's AISC Cert. be waived or an alternate procedure be acceptable?
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
- The specs list prevailing wages but nothing actually states that this is a prevailing wage project. Is this prevailing wage& if so will you be issuing the wages? The spec book we received does not have a section 00200 included in it. - There are completion dates listed but I do not see a start date. What is the anticipated start date?
BID 003
Honman Chau / Wickersham Constructon and Eng., Inc.
3/11/14
Section 00200 should not be listed in the Table of Contents. Will clarify by addendum. The anticipated noticeto proceed is 4/15/14.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
- Drawing A-2.3 references ceramic tile in note #7 & note #13 of the typical toilet room notes. There is no mention ofceramic tile in the specs or anywhere else on the drawings. Is this required, and if so will you be issuing a spec? - Detail A18 on Drawing A-12 shows an air barrier transition membrane in cavity wall behind sill block. Is there a specfor this air barrier?
BID 004
Honman Chau / Wickersham Constructon and Eng., Inc.
3/12/14
There is no ceramic tile required. This will be clarified by addendum.
Refer to specification Foamed Insulation section 07 21 27, paragraph 2.2.C. Will clarify by addendum.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
BID 005
3/14/14
Mike Renz / MRP Contractors
Alternate #3 request cost to add resinous flooring in lieu of sealed concrete per the Finish Schedule. In the areaof the other rooms required A107 and A104 are not covered. Is this correct? The other rooms A108-A112 arealso not covered.
The following spaces are to have resinous flooring under the alternate: A101, A102, A104, A105, andA106. Will clarify by addendum.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
BID 006
Eric Grubb / Grubb Contractors
3/17/14
Section 052100 (Steel Joist Framing) is missing from my paper and electronic specifications manual.
There are no new steel joists in the addition, therefore, that specification section is not required. The joistsshown on the roof framing plan are existing structure.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
BID 008
Honman Chau / Wickersham Constructon and Eng., Inc.
3/18/14
On Drawing C-4.1 under Water Notes W-4 calls for directional drilling. Is this required? If so, can you issue aspec for this and a more precise location to where this is to occur? Is it just under the sidewalks at the (2)locations shown or along the entire back side of the grandstands?
Yes, required for the portion of the line between the "W-4" notes on C-4.1 that is under the grandstand.Specification section 221113 lists requirement in 1.4.C.&D. and 3.6.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
BID 009
Eric Grubb / Grubb Contractors
3/17/14
PLAN SHEET C 4.1 Inlet I-2 is shown as a 24" NDS Catch Basin on top of the existing 48" RCP. Question: How does the engineer want it adapted to the 48" RCP ?
Randy Hughes, WBCM
3/20/14
The inlet and connection is being revised in Addendum No. 1.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
It is stated in the specs. That the contractor is to pay for the electric, water , etc. Does this mean that we can not tie intothe existing power located in the area?
BID 011
Roy Cook / North Point Builders, Inc.
3/20/14
Contractor may tie into existing power and water for construction purposes. Contractor is responsible for anyutilities in excess of what is readily available on site.
Copyright 1994, Construction Specifications Institute,
601 Madison Street, Alexandria, VA 22314-1791
Page of July 1994
CSI Form 13.2A
BID
BidAberdeen High School Stadium and Weight
Room Upgrades
21339
Date:
Is the telecommunications Services as specified really required for this small project?An e-mail address reserved for thisproject, a personal computer with laser printer. All our men have smart phones. E-mails/ texts are received andanswered.
BID 012
Roy Cook / North Point Builders, Inc.
3/20/14
That paragraph will be deleted by addendum.
Karen Burlingame
3/20/14
1
March 24, 2014
ABERDEEN HIGH SCHOOL – STADIUM AND WEIGHT ROOM UPGRADES
ADDENDUM NO. 1
21339.00/060
TO THE CONTRACT DRAWINGS AND SPECIFICATIONS FOR THE REFERENCED PROJECT,
DATED MARCH 3, 2014, AS PREPARED BY GRIMM & PARKER ARCHITECTS, 11720
BELTSVILLE DRIVE, SUITE 600, CALVERTON, MARYLAND 20705.
This Addendum includes changes and clarifications to the Contract Documents. The information includes
the following:
SPECIFICATION ITEMS:
ITEM NO. 1 SPECIFICATION COVER PAGE
REVISE City listed on cover page from Bel Air to Aberdeen.
ITEM NO. 2 TABLE OF CONTENTS
DELETE 00200 PREVAILING WAGE – this section is not provided or applicable.