Page 1: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

System Preservation Research Roadmap Implementation and

TrackingStephen R. Mueller, P.E., MPA

Pavement and Materials Engineer

FHWA Resource Center (Lakewood, Colorado)

[email protected]

Federal Highway Administration

Page 2: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Outline of Discussion:

1. Briefing on the Existing Roadmap

a. Motivations for Development

b. Development Process

c. Results

2. Discussion of Research & Tracking

3. Discussion of Roadmap Update Needs

Page 3: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Transportation System Preservation Research, Development, and

Implementation Roadmap

Page 4: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Motivations for the Roadmap

Preservation research identified as a need during program appraisals

Individual projects have been sought in the past

No coordinated approach to address preservation research needs

Other Roadmaps: HMA, PCC, now PMS

Page 5: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Roadmap Development Process

Technical Panel

Pavements and Bridges

White Paper Development and Review

3 Workshops• 2 Pavements• 1 Bridge• 6 Teams

Page 6: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Pavements Whitepapers/ Breakouts

Asset ManagementDesignMaterialsConstructionContracting MethodsPerformance

Page 7: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Bridge Whitepapers/ Breakouts

Asset ManagementDecks and JointsSuperstructureSubstructureSelection of Preservation ActionsPerformance

Page 8: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Development Process (continued)

Research Needs Statements• Background• Scope• Tasks• Estimated Time and Cost• Implementations

Balloting and Ranking

Overall Joint Roadmap Publication: January 2008

Page 9: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Sample Problem Statement – pg 1/3

Page 10: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Sample Problem Statement - pg 2/3

Page 11: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Sample Problem Statement – pg 3/3

Page 12: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Results

Pavements – 38 statements

Bridge – 25 statements

Estimated Cost > $40M

Page 13: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

PavementsCategory # of Problem

StatementsAsset Management 8Design 7Materials 7Construction 7Contracting Methods

3

Performance 6

Page 14: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

BridgeCategory # of Problem

StatementsAsset Management

7

Decks and Joints 4

Superstructure 5

Substructure 5

Selection of Preservation Actions

2

Performance 2

Page 15: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Top 5 Pavement Statements by Importance AND Priority

Page 16: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Top 5 Bridge Statements by Importance AND Priority

Page 17: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Next Steps/ Implementation** from 2009 **

Short-and long-term research needs for pavement preservation and bridge preservation

Presented for AASHTO Subcommittee on Maintenance

Develop tracking mechanism on TSP2

Page 18: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Outline of Discussion:

1. Briefing on the Existing Roadmap

a. Motivations for Development

b. Development Process

c. Results

2. Discussion of Research & Tracking3. Discussion of Roadmap Update Needs

Page 19: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Who is Doing the Research?

1. NCHRP / TRB:AASHTO Subcommittee on Maintenance

Pavement Technical Working Group

TRB Committees AHD18 and AHD20

Research Needs Statements

Synthesis Studies / Research Examples:Chip Seal Best Practices (2005 - Gransberg)

Microsurfacing (2010 - Gransberg)

Chip Seals (2010 NCHRP 680 – Shuler)

Page 20: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

NCHRP Synthesis

State of the practice program.Due: Jan 31st(Only 15 projects selected annually)SCOH

MaintenanceResearch

SubCommittee

NCHRPSubmit to TRB's NCHRP programDue: Sept 15

Each year $25 Million approximately

NCHRP IDEA

Due: March 1st & Sept 1st

University TransportationCenters (UTC)

USDOT program that provides funding to selectuniversities for education of future transportationworkers and research.Due: Timing of project selection varies

Federal DiscretonaryFunds

Some states request funding for researchactivities.Due: Usually in the fallSee your congressional Liaison

State MaintenancePrograms

Some programs fund researchdirectory.See your State MaintenanceEngineer

Transportation Pooled FundStudies

Requires at least two states or a state and FHWA tobe interested in a research development project.Project Desciptions submitted through StateResearch directors.Due: AnytimeFunding comes from participating organizations.

State Planning &Research Funding

Problem statements submitted throughState Research Directors.Due: Timing & amount varies someannual, some biennial, WSDOTdecides bienally in the fall.

NCHRP Researchfor AASHTO SCOH

Submit to SCOHDue: Spring$1 Million available

“20-7”

Page 21: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Pavement Preservation Research?

2. FHWA ResearchOffice of Asset Management

– Performance Evaluation of Various Rehabilitation and Preservation Treatments,

Zheng Wu, Ph.D., P.E., Jonathan L. Groeger, Amy L. Simpson, Ph.D., P.E., R. Gary Hicks, Ph.D., P.E.

Turner-Fairbank Highway Research Center

- Dr. Nelson Gibson – ALF testing

Federal Lands:– FLH Study on Polymer Modified Emulsions (Voth/King, etc)

Page 22: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

Ability of pavement preservation to interrupt aging and top down cracking

• Chip Seal?• Slurry Seal?

Thin HMA Overlay– 4.75mm Superpave

Page 23: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

Top-Down / Bottom-Up CrackingAccelerated Aged Sections

Page 24: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Pavement Preservation Research?

3. State DOT / University Research CA, TX, IA, NC, MN, MI, UT, etc, etc

4. SHRP-2 Research

5. Private Company Research– Asphalt Suppliers (Colas, Western Emulsions)

– Polymer Suppliers (Kraton, BASF)

– Technology Providers (Road Science)

Page 25: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

R09. Risk ManualR09. Risk Manual

R06. High-Speed NDT*R06. High-Speed NDT*

R04. Innovative Bridge Designs

R04. Innovative Bridge Designs

R01. Locating Utilities*R01. Locating Utilities*

R02. Geotech SolutionsR02. Geotech Solutions

R05. Modular PavementR05. Modular Pavement

R07. Performance SpecsR07. Performance Specs

R16. Railroad-DOTMitigation StrategiesR16. Railroad-DOT

Mitigation Strategies

R15. Integrating Utility and Transportation Agency Priorities*

R15. Integrating Utility and Transportation Agency Priorities*

R23. Using Existing In-place Pavement & Achieving long Life

R23. Using Existing In-place Pavement & Achieving long Life

R21. Composite Systems

R21. Composite Systems

R26. Preservation Approaches

R26. Preservation Approaches

R19. Bridges for Service Life of 100 Years*

R19. Bridges for Service Life of 100 Years*

Rapid Approaches Long-Lived FacilitiesMinimize Disruption

28 Research Projects - $32 Million

R11. Strategic Approaches at

Corridor/Network Level

R11. Strategic Approaches at

Corridor/Network Level

R10. Project Management for Large

Projects

R10. Project Management for Large

Projects

R03. Worker FatigueR03. Worker Fatigue

Technology Related

Project Delivery RelatedIndicates Multiple Projects*

Page 26: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

TechnologyTechnology Project DeliveryProject Delivery

Balanced approach

SuccessfulRenewal

Page 27: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Bottom Lines:

Lots of Research Activities in Preservation!

Most are Initiated to fulfill specific client needs.

The Roadmap is a Planned Set of Research Ideas to Fulfill the Overall Agency and Industry Needs, and Advance Preservation as a Whole.

Discussion Questions:1. What research do we need to track?2. Who will do the tracking, and HOW?

Page 28: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Outline of Discussion:

1. Briefing on the Existing Roadmap

a. Motivations for Development

b. Development Process

c. Results

2. Discussion of Research & Tracking

3. Discussion of Roadmap Update Needs

Page 29: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Do We Need to Update the Preservation Roadmap?

Has there been a change in focus within the preservation community that is different than the climate in which the Roadmap was developed? Energy Use / GHG Emissions / Sustainability?

Budget Constraints Driving Preservation Decisions More?

Increasing Focus on Performance Measures?

Sufficient Progress in Tackling Problem Statements to Warrant a Review and Update Process?

HMA Roadmap is revisited by FHWA and NAPA every couple of years:

Goal: “Keep the Preservation Roadmap a Living Document” ???

Page 30: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Preservation and Asset Managementwon’t bring short-term glory,

but they will bring long-term satisfaction!

Page 31: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

Questions?

Page 32: AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.

AASHTO Subcommittee on Maintenance - PTWG July 18, 2011

THANK YOUFor more information contact:

Steve MuellerFHWA Resource CenterTelephone: (720) 963-3213e-mail: [email protected]

www.fhwa.dot.gov/preservation www.fhwa.dot.gov/resourcecenter