Page 1
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.1
AASHTO COBS
T-8 Technical Committee on Moveable Bridges
Acrow Temporary Vertical Lift Bridge SR 80 Bridge Replacement Project
West Palm Beach, FLPresented by:
Michael J Parciasepe, P.E.Senior Project Manager
Page 2
Acrow Temporary Lift Bridge SR 80 Bridge Replacement Project
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.2
• Project Details
– Overview– Project Timeline– Project Map– Why Acrow?
• Acrow SR80 Temporary Lift Bridge
– Temporary Bridge Details• Lift Span
• Towers
• Counterweights
• Uphaul Downhaul System
• Cross Head Beams
• Gantry
• Machinery Details
• Acrow Temporary Moveable Bridges– Vertical Lift Bridges
– Bascule Bridges
Page 3
SR 80 – Southern Boulevard Bridge Replacement Project
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.3
• Project Overview
– Existing Bridge
• Twin Leaf Bascule
• 24 ft Vehicular Width
– 2 x 10 ft Lanes with 2 ft Shoulders
• 85 ft Navigable Channel
• Constructed in 1950
• Deemed Structurally Deficient
– Bridge Replacement
• Project Owner – Florida Department of Transportation
• Project Design Engineer – AECOM Tampa, FL
• Use of a temporary bridge was predicated by Flagler Memorial Bridge Replacement
• Project Contractor – Johnson Brothers (Southland Holdings)
Page 4
SR 80 – Southern Boulevard Bridge Replacement Project
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.4
• Project Timeline
– Pre-Bid – Acrow worked with AECOM
• July 2014 – April 2016
– Bid Date – April 2016
– June 2016 – Project Awarded to Johnson Brothers
– April 2017 – Johnson Brothers began Construction
– December 2017 – Temporary Bridge Assembly Began
– March 2018 – Temporary Lift Bridge Commissioning
– May 2018 – Temporary Lift Bridge Open to Traffic
– Late 2020 – Projected removal of Temporary Bridge
Page 5
SR 80 – Southern Boulevard Bridge Replacement Project
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.5
• Project Map
Project Location
Port of Palm Beach
Intracoastal Waterway
Page 6
SR 80 – Southern Boulevard Bridge Replacement Project
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.6
• Why Acrow?
– Safety
• No staged construction
– Constructability
• Assembled off site
• 4 Months
– Low Public Impact
• One 5 Day closure of channel for construction
• Zero Road Closures
– 2 Lanes of traffic
– Acrow Experience
Page 7
• Temporary Bridge Details
– 30 ft Vehicular Width
• 2 x 12 ft Lanes
• 5 ft Shared Pedestrian Footwalk
– 125 ft Wide Navigable Channel
• 14 ft – Bridge Closed
• 65 ft – Bridge Fully Raised
• Openings every 30 Minutes (:15 and :45)
– Total Lift Span Weight – 465,500 lbs.
• Counterweighted for 1,000 lb. imbalance
Acrow Temporary Lift Bridge
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.7
Page 8
Acrow Temporary Lift Bridge
Moveable Bridge Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.8
• Counterweight System
– Precast Concrete Counterweights
• Cast with Internal Counterweight Frames
• Cross Section to fit within Acrow Towers
– 1,000 lb. Imbalance per corner
– 6 x 1 ¼” 6x36 WSC Fiber Core Ropes per corner
– 12 x 60” McKissick Roll Forged Sheaves per corner
Page 9
Acrow Temporary Lift Bridge
Counterweight Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.9
Page 10
Acrow Temporary Lift Bridge
Counterweight Rope Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.10
Page 11
Acrow Temporary Lift Bridge
Moveable Bridge Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.11
• Uphaul/Downhaul System
– 2 x 1” 6x36 WSC Fiber Core Ropes per Corner
• 1 each for Uphaul and Downhaul (8 total)
– Operating Ropes tie into 4 drums located at center of the Overhead
Gantry
– Overload System in place for each Uphaul/Downhaul Rope
– All drums operate off a single shaft
– 40 HP @ 850 RPM Motor
– 238:1 Reducer
– Mechanical Designer/Supplier: Steward Machine Co. Birmingham, AL
Page 12
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.12
Acrow Temporary Lift Bridge
Machinery Pallet Details
Page 13
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.13
Acrow Temporary Lift Bridge
Operating Rope Schematic
Page 14
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.14
Acrow Temporary Lift Bridge
Operating Rope Layout
Page 15
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.15
Acrow Temporary Lift Bridge
Safety Arm Details
Page 16
Acrow Temporary Lift Bridge Structural Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.16
• Towers
– 75 ft Towers at each corner
– Bridge Counterweights move within towers
– Towers are used as guides for the Lift Bridge while moving
Page 17
Acrow Temporary Lift Bridge
Construction Sequence - Towers
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.17
Page 18
Acrow Temporary Lift Bridge
Construction Sequence - Towers
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.18
Page 19
Acrow Temporary Lift Bridge
Construction Sequence - Towers
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.19
Page 20
Acrow Temporary Lift Bridge
Construction Sequence - Towers
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.20
Page 21
Acrow Temporary Lift Bridge Structural Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.21
• Cross Head Beam Assemblies
– Span from Tower to Tower at each end of the bridge
– Support the Overhead Gantry
– House the Counterweight Sheave Cassettes
– Internal Sheaves for Uphaul/Downhaul System
Page 22
Acrow Temporary Lift Bridge
Construction Sequence – Cross Heads
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.22
Page 23
Acrow Temporary Lift Bridge
Construction Sequence – Cross Heads
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.23
Page 24
Acrow Temporary Lift Bridge
Construction Sequence – Cross Heads
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.24
Page 25
Acrow Temporary Lift Bridge Structural Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.25
• Overhead Gantry System
– 175 ft Overall Length
– Span from Crosshead to Crosshead
– Machinery Pallet at center of Gantry
– Walkway/Access to Machinery Pallet
Page 26
Acrow Temporary Lift Bridge
Construction Sequence – Overhead Gantry
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.26
Page 27
Acrow Temporary Lift Bridge
Construction Sequence – Overhead Gantry
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.27
Page 28
Acrow Temporary Lift Bridge
Construction Sequence – Overhead Gantry
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.28
Page 29
Acrow Temporary Lift Bridge
Construction Sequence – Overhead Gantry
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.29
Page 30
Acrow Temporary Lift Bridge Structural Details
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.30
• Lift Span
– 170 ft Lift Span
– DDR2SH Truss Configuration
– 30 ft Vehicular Roadway
– 5 ft Footwalk (North Side)
Page 31
Acrow Temporary Lift Bridge
Construction Sequence – Lift Span
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.31
Page 32
Acrow Temporary Lift Bridge
Construction Sequence – Lift Span
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.32
Page 33
Acrow Temporary Lift Bridge
Construction Sequence – Lift Span
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.33
Page 34
Acrow Temporary Lift Bridge
Span Operation
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.34
Page 35
Acrow Temporary Lift Bridge
Current Photo
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.35
Page 36
Acrow Moveable Bridges
Vertical Lift Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.36
• Fore River Bridge Quincy/Weymouth, MA
Page 37
Acrow Moveable Bridges
Vertical Lift Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.37
• Fore River Bridge Quincy/Weymouth, MA
Page 38
Acrow Moveable Bridges
Vertical Lift Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.38
• Bridge of Lions – St. Augustine, FL
Page 39
Acrow Moveable Bridges
Brute Force Bascule Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.39
– Oak Bluffs, Martha’s Vineyard, MA
Page 40
Acrow Moveable Bridges
Brute Force Bascule Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.40
– Beldon Bly Bridge, Lynn-Saugus, MA
Page 41
Acrow Moveable Bridges
Brute Force Bascule Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.41
– Grand Isle - North Hero Bridge, North Hero, VT
Page 42
Acrow Moveable Bridges
Brute Force Bascule Bridges
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.42
– Grand Isle - North Hero Bridge, North Hero, VT
Page 43
Acrow Temporary Lift Bridge SR 80 Bridge Replacement Project
6/24/2019 AASHTO COBS T-8 – Acrow Temporary Lift Span – Southern Blvd.43
Questions?