Company Profile

Page 2: A+AConstruction company profile

2

contents

Overview ― A&A Construction at a glance P03

Directors P05

Company Activities P06

Our projects P07 Contact details P23

Page 3: A+AConstruction company profile

3

A&A ConstruCtion At A glAnCeSince starting operations in 2009, A&A Construction has developed into a medium sized construction company that set out to provide a complete package of high-end solutions and services created especially for the luxury Hospitality, Commercial, Retail, Residential and Office infrastructure projects across the Middle East, Asia and Europe.

A&A Construction started out with the ethos of putting its full commitment into building client relationships by completing all works to agreed timescales and bud-gets. Through years of experience working with large multinationals, we have gained an excellent reputation, which has lead to A&A being involved in many prestigious international projects.

By utilizing the latest technology and equipment, A&A along with its highly qualified tradesmen and support staff of international Project Managers, Architects and Commercial team, to name just a few, endeavor at all times to give our clients the confidence that when we take on a task we aim to give complete satisfaction.

Keeping this in mind, the professionalism of A&A Construction is based on the experience of its two major shareholders, Albert and Adrian, which has been acquired since the year 2000 working mainly in Southern and Northern Ireland.

The skilled tradesmen have been hand picked from teams who have gained their professional experience working in England, Ireland, Northern Ireland and Israel. Thus, A&A Construction is proud of its ability to take its projects from scratch with the help of its Engineers, Carpenters, Iron workers, Bricklayers, Masons, Plasterboard experts, Electricians and other specific workers.

Most importantly is the fact that the company sees its relationship with its clients not as a rigid contract that provides a package of services, but as a continuous dialogue that changes partners into friends and colleagues for a long period of time.

Page 4: A+AConstruction company profile

4

2 MAjor shareholders

staff globally

major worldwide

projects

200

30 Currently employing over

More thanA&A Construction in numbers

Page 5: A+AConstruction company profile

5

DireCtors

Mr. Albert UngureanuWith over 20 years experience in construction I have noticed time and time again that clients were being let down by their builder. We started our company A&A Construction with the aim of being committed to fulfilling our clients’ requirements and our word means everything to us.

Our clients have realized that we have a passion, dedication, professionalism and above all that our promise to deliver is our bond and this will continue into the future. I am proud of our team and of what we have achieved for our clients. We intend to continue our tradition and work ethic giving a full commitment to all of our existing clients and all future clients.

Mr. Adrian MihocBy giving the clients what they want, when they want it and to the highest quality, this gets repetitive business. When I started the company with Albert in 2007 with a small team of tradesmen we made sure we kept our commitments and continue to do so.

With our combined experience and using our highly skilled team we are confident that we will go from strength to strength, building strong relationships with our clients and supply chain.

Page 6: A+AConstruction company profile

6

serviCesCompany ActivitiesAlong with full fit out packages, A&A Construction also specialize in all construction related works including, but not limited to:

Plasterboard All Joinery works Block work Screed Epoxy coatings Polished concrete Plastering Tiling Marble

Wallpaper Painting Parquet flooring Glass polishing Raised access flooring Glass partitions Vinyl flooring Carpeting FFE.

Page 7: A+AConstruction company profile

7

liberty centre, bucharest, romaniaClient: Mivan / KierScope: Plaster boarding package for the cinema complex over 7 hallsDate: 2008

new town residence, bucharest, romania Client: H&J MartinScope: Partition walls, ceilings, skim and paint package for 300 apartmentsDate: 2009 — 2010

mazagan resort, el jadida, moroccoClient: DepaScope: Contracted fit out worksDate: July — November 2009

arkapita bank, manama, bahrainClient: DepaScope: Partition walls, ceilings and doors packageDate: December 2009 — March 2010

ferrari world theme park, abu dhabi, united arab emirates Client: Mivan / DepaScope: Fit out works including partition and custom-made wallsDate: March 2010 — July 2010

lake view offices, bucharest, romania Client: Mivan / KierScope: Partitions and ceilings packageDate: 2010 — 2011

aden hotel, aden, yemen Client: Mivan / DepaScope: Partition walls, ceilings, wood paneling, skimming and painting package.Date: Nov. 2010 — Jan. 2011

porchester gate, apartments, london, england Client: MivanScope: Contracted fit out works Date: 2011

mazagan villas, el jadida, morocco Client: DepaScope: Contracted fit out worksDate: June — December 2011

jw marriott, baku, azerbaijan Client: StrabagScope: Contracted fit out works to restaurant, ballroom, common areas and hotel roomsDate: October 2011 — March 2012

dlf magnolias residential apartments, new delhi, india Client: DepaScope: Contracted fit out worksDate: 2012 — 2013

new delhi and mumbai international airports, india Client: DepaScope: Contracted fit out worksDate: January 2012 — May 2012

port baku tower, baku, azerbaijan Client: Depa, Pasha, WorkplaceScope: Contracted fit out works including marble, parquet, partitions, cubicles and paintingDate: May 2012

port baku residence, baku, azerbaijan Client: MaceScope:Residential fit out worksDate: December 2012

port baku restaurants (harbor, movida), baku, azerbaijan Client: DekonScope: Complete fit out works to both restaurants Date: 2013 — 2014

our ProjeCts

Page 8: A+AConstruction company profile

8

h.h sheikh kalifa bin zayed al nahyan specialised hospital, casablanca, moroccoClient: Consolidated Contracting EngineeringScope: Contracted fit out works including ceilings, partitions, vinyl flooring and wall claddings Date: November 2013 — March 2014

king abdullah petroleum studies and research center (kapsarc), riyadh, saudi arabia Client: DepaScope: Contracted fit out worksDate: September 2013 — February 2014

king abdulah stadium, jeddah, saudi arabiaClient: Mivan, MSX, BesixScope: Fit out works to Kings Box and 2 restaurants

Date: September 2013 — February 2014

flames tower, baku, azerbaijanClient: DepaScope: Parquet floors and mosaic works Date: April 2013 — May 2014

national gymnastics arena, baku, azerbaijanClient: MaceScope:Contracted fit out works to the arenaDate: February — November 2014

pik palace, vip villas, park chalet, shahdag, azerbaijanClient: PashaScope: Contracted fit out worksDate: October 2013 — January 2015

sofaz tower, baku, azerbaijanClient: AZ BesixScope: Fit out works including partitions, marble and parquet flooring Date: October 2013 — March 2015

white city hotel, baku, azerbaijanClient: PashaScope: Fit out works including ceramic wall and floor tiling and wall papering Date: May 2014 — May 2015

trump tower, restaurant chandelier and penthouses, baku, azerbaijanClient: MaceScope: Full fit out packages to high specification Level 26, Chandelier Restaurant and Level 28 – 31 Penthouse Apartment Date: October 2014 — Ongoing

twin towers pullman hotel, doha, qatarClient: DepaScope: All joinery related works including but not limited to wall claddings, wardrobes, vanity units, doors, skirting’s and architraves.Date: May 2015 — Ongoing

our ProjeCts

Page 9: A+AConstruction company profile

9

iConiC ProjeCts

Page 10: A+AConstruction company profile

10

Mazagan Villas and ResortEl Jadida, MoroccoThis project comprised of contracted fit out works for these two beautiful resorts in Morocco. We were selected on our reputation of providing a high quality at a competitive price and being able to successfully deliver projects to tight deadlines, which we achieved!

Page 11: A+AConstruction company profile

11

J.W. Marriott Hotel (Absheron) Baku, AzerbaijanThe upscale hotel ideally located among the city center’s futuristic skyline and historic buildings gave A&A Construction the chance to work on the restaurants, common areas and hotel rooms. We did the work with maximum professionalism and rapidity and with great results.

Page 12: A+AConstruction company profile

12

Ferrari Park Abu Dhabi, United Arab EmiratesThe stallion of the auto world needed a park to match its power and luxury and so the Ferrari Park appeared. The A&A Construction team was selected due to our reputation and the results surpassed all expectations: the best of services delivered on time and at a competitive price.

Page 13: A+AConstruction company profile

13

Flame Towers, Baku, AzerbaijanThe Flame Towers are the tallest skyscrapers in Baku, three 190m (620 ft) construction wonders with spectacular design. Our work was at a great level, as well, delivered with great care and attention for the apartments, the hotel and the office blocks.

Page 14: A+AConstruction company profile

14

Twin Towers Pullman HotelDoha, QatarLocated in the West Bay Development of Doha, the Twin Towers is home to a 5-star Pullman Hotel and to office suites. A&A Construction’s contribution to them was very diverse, including all joinery related works, and it met all of the client’s expectations and needs.

Page 15: A+AConstruction company profile

15

King Abdullah Petroleum Studies and Research Center (KAPSARC) Riyadh, Saudi ArabiaKAPSARC is an independent, non-profit institution that focuses on research in energy economics, policy, technology, and the environment. A&A Construction’s works here took place in 2013 and 2014 and comprised of the fit out of various areas of the building.

Page 16: A+AConstruction company profile

16

King Abdullah Sport City StadiumSaudi ArabiaThe works undertaken on the King Abdullah Sport City Stadium comprised of the supply of a large labor force and the supervision, management and coordination of the works to ensure that the project was completed on time and to the standard required by the client, under a very demanding schedule.

Page 17: A+AConstruction company profile

17

Shahdag resort, AzerbaijanThe luxurious Shahdag, the first and largest resort of Azerbaijan, is the home of three upscale villas and chalets. A&A Construction offered its professionalism and great attention to details: Pik Palas Hotel, VIP Villa and Park Chalet Hotel.

Page 18: A+AConstruction company profile

18

Port Baku Towers, Baku, AzerbaijanThe high-rise complex situated Neftchilar Avenue, next to the marine port, includes two towers, the Northern and the Southern, which are comprised of offices, restaurants, cafes, retail departments and an international welness center. A&A Construction’s work here regarded Movida Restaurant, Masu Restaurant and Harbour Restaurant and the results are truly majestic.

Page 19: A+AConstruction company profile

19

White City, Baku, AzerbaijanThe Baku White City is set on an ecologically reclaimed land from a former industrial area and is thus a great surprise of the construction world. Nevertheless, our work here did not leave room for surprises: just as professional and quick as before and always.

Page 20: A+AConstruction company profile

20

Sofaz Tower, Baku, AzerbaijanBuilt as the headquarters of the State Oil Fund of the Azerbaijan Republic, Sofaz Tower is constructed on green building technology and is comprised of a Museum, a Conference hall, Offices and a two level Car park for 150 cars. A&A Construction brought its knowledge here and worked in great timing for the fit out of the construction.

Page 21: A+AConstruction company profile

21

New Delhi and Mumbai Airports, IndiaThe works undertaken on these two major projects in India comprised of the fit out of several areas of the two airports. Both these projects were delivered on time and to a high level of client satisfaction.

Page 22: A+AConstruction company profile

22

Atelye 61 restaurant, Baku, Azerbaijan Located in an old warehouse and workshop of a former industrial site, west of Baku bay, Atelye 61 is wonderfully restored and includes two dining floors and a seasonal patio garden. A&A Construction’s contribution added additional charm to the restaurants and bars and was delivered on time to a perfect level of professionalism.

Page 23: A+AConstruction company profile

23

Romanian office +40 745 900 [email protected] adrian mihocDirector+40 756 055 [email protected] albert ungureanuDirector+40 743 228 [email protected]

azeRbaijan adrian mihocDirector+994 51 562 06 [email protected]

albert ungureanuDirector+994 50 744 78 [email protected]

frank mcdonaldContracts Manager+994 50 991 59 [email protected]

Saudi aRabia albert ungureanuDirectvor+966 [email protected]

iulian mihocProject Manager+966 [email protected]

ContACt DetAils