Document Number: EHS-P-037
Document Title: Emergency Preparedness
Revision 1 June 1, 2014
File Name: EHS-P-037-Emergency Preparedness_rev01_2014.doc2 of 7
REVISION HISTORY
NOTE
When this document is due for a sixth revision, revise and reissue it as a new, original document using the current document number.
REVISION REASON FOR REVISION APPROVED BY
Revision 0 Dated
January 1, 2013
To comply with the requirements of Gulf Group Policy Tanon T.
Revision 1 Dated
June 1, 2014Updated scope of this emergency plan Tanon T.
Revision 2 Dated
Revision 3 Dated
Revision 4 Dated
Revision 5 Dated
Document Number: EHS-P-037
Document Title: Emergency Preparedness
Revision 1 June 1, 2014
File Name: EHS-P-037-Emergency Preparedness_rev01_2014.doc3 of 7
DISTRIBUTION LIST
DOCUMENTARY CENTER FORMAT
AMD Signed Original
NKCC Controlled Copy
GCC Controlled Copy
SCC Controlled Copy
GYG Controlled Copy
GPG Controlled Copy
GKP1&2 Controlled Copy
GTLC Controlled Copy
GNNK Controlled Copy
GNLL Controlled Copy
GCRN Controlled Copy
GNK2 Controlled Copy
GNS Controlled Copy
GUT Controlled Copy
Document Number: EHS-P-037
Document Title: Emergency Preparedness
Revision 1 June 1, 2014
File Name: EHS-P-037-Emergency Preparedness_rev01_2014.doc4 of 7
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
NUMBER
TITLE PAGE ……….…………………………………………………………………….. 1
REVISION HISTORY …………………………………………………………………... 2
DISTRIBUTION LIST …………………………………………………………………... 3
TABLE OF CONTENTS ……………………………………………………………….. 4
1.0 PURPOSE ……………………………………………………………………………….. 5
2.0 RESPONSIBILITIES …………………………………………………………………… 5
3.0 SPECIAL INSTRUCTIONS AND PRECAUTIONS ………………………………….. 5
4.0 PROCEDURE …………………………………………………………………………… 6
5.0 REFERENCES ………………………………………………………………………….. 7
6.0 ATTACHMENTS ………………………………………………………………………... 7
Document Number: EHS-P-037
Document Title: Emergency Preparedness
Revision 1 June 1, 2014
File Name: EHS-P-037-Emergency Preparedness_rev01_2014.doc5 of 7
1.0 PURPOSE
1.1 To establish procedures of responding to the emergencies this can minimize loss of life, property and environmental impacts.
1.2 To define the role of emergency response team members to act properly when emergency occur.
1.3 To out line the communication and co-ordination with in the company and the external agencies in the emergency.
2.0 RESPONSIBILITIES
2.1 AMD provides approval on this procedure.
2.2 All employee are obligated to participate in training and rehearsal of the emergency response plan including; fire fighting training, evacuation and emergency drill. The safety committee shall prepare the rehearsal schedule.
2.3 All employees are obligated to alert the other people or report the emergency he/she discovering to the Emergency Control Center that will be called “ECC”.
2.4 All non-emergency response team- employee who are not assigned and trained to be a member of Emergency Response Teams, obligated to strictly follow the instruction given by the “ECC”.
3.0 SPECIAL INSTRUCTIONS AND PRECAUTIONS
3.1 Emergency is a sudden, generally unexpected occurrence or set of circumstances demanding immediate action that could lead on a worse effect to life, injury, property or environment. There are classified into 3 levels as below ;
3.1.1 Level 1: An unexpected occurrence which the company can control the situation themselves.
3.1.2 Level 2: An unexpected occurrence which the company cannot control the situation themselves and need cooperation with neighboring or industrial estate fire brigade.
3.1.3 Level 3: An unexpected occurrence which the company and neighboring or industrial estate fire brigade themselves cannot control the situation and need cooperation from Provincial or Other Provinces.
3.2 Scope of this emergency plan are ;
3.2.1 Fire and/or Explosion.
3.2.2 Chemical Spill and Leakage.
3.2.3 Natural Gas releases, Toxic Gas releases.
3.2.4 Major accident involving fatal injury or severe injury.
3.2.5 Flood and Other Natural Disaster
3.2.6 Terrorism, Riot
3.2.7 Epidemic , pandemic such as Bird Flu ,SARS
3.3 The support document may be need in case of emergency are following ;
3.3.1 Pre-Fire Plans.
Document Number: EHS-P-037
Document Title: Emergency Preparedness
Revision 1 June 1, 2014
File Name: EHS-P-037-Emergency Preparedness_rev01_2014.doc6 of 7
3.3.2 Chemical Spill and Leakage Pre-Plans.
3.3.3 Plant layout.
3.3.4 Fire Protection Systems Data.
3.3.5 Material Safety Data Sheets.
4.0 PROCEDURE
4.1 Safety Committee shall establish Emergency Plan which including;
4.1.1 Emergency Preparedness Plan
a) Training Program b) Inspection Program c) Authorize and Responsibility
4.1.2 Emergency Response Plan
a) Fire Fighting Plan b) Spill Control Plan c) Evacuation Plan d) Flood emergency response plan e) Other
4.1.3 Emergency Relief/Mitigation Plan
4.2 Discussion/General Consideration.
4.2.1 To minimize the risk of accident or incident that could lead to a catastrophic event of emergency, precaution ruled by the Hazardous Work Permit Procedure, Fire Protection Plan Procedures and General Fire Safety Procedure must be always strictly followed.
4.2.2 Operation department must insure that Operating Procedures, in themselves, are not potential causes. After startup, random checks should be made to note whether the operators are following established procedures.
4.2.3 Safety Committee should conduct hazard analyses to visualize the chain of incident that can cause emergencies and make them hard to control.
4.2.4 It is necessary to prepare some of items listed below ready for any case of emergency. a) Telephone which have enough number to contact or being contacted with external
agencies. b) Radios which have enough frequency or channel to contact or being contacted with
external agencies. c) Plant Layout showing. d) Hazardous Area. e) Safety Equipment. f) Fire Protection System/ Water distribution Drawing. g) Traffic Plan. h) Assembly Point. i) Nearby location/ Neighborhood area. j) Nearby Tank Farm, Storage area of Flammable Material, etc. k) White boards, pen, and papers. l) List of on shift employees. m) Telephone directory composed with at least police station, hospital, fire brigade and etc.
Document Number: EHS-P-037
Document Title: Emergency Preparedness
Revision 1 June 1, 2014
File Name: EHS-P-037-Emergency Preparedness_rev01_2014.doc7 of 7
4.3 Training of Emergency Response Teams.
4.3.1 All Emergency Response Teams are required to be trained in ; a) Technical Fire Fighting 1 time/year. b) First Aids 1 time/year. c) Hazard Communication 1 time/year. d) Spill Prevention and Control Plan 1 time/year. e) Emergency Drill 1 time/year.
4.4 Safety Equipment and Inspection
4.4.1 To ensure readiness of equipment and tools to be operated in emergency, the following list shall be inventoried and inspected/ maintenance regularly. Any defective of this equipment has to be rectified as soon as possible ; a) SCBA shall be inspected on monthly basis b) Fire hoses, nozzles, and accessories 1 time/month. c) Fire Pump 1 time/week d) Deluge systems 1 time/month. e) Fire Detection/Alarm systems 1 time/month. f) Fires fighting Gear including fire-fighting suits, helmets face shield, boots, and gloves 1
time/month. g) Portables fire extinguishers monthly. h) Foam/ Portable foam carts monthly. i) Fire Blankets 1 time/month. j) Smoke Detectors biannually. k) Spill Kits 1 time/month. l) First Aids Kits 1 time/month. m) Stretcher 1 time/month. n) Resuscitation Kits 1 time/month.
5.0 REFERENCES
None
6.0 ATTACHMENTS
6.1. ALARM LEVEL
EHS-P-037-Emergency Preparedness_A0100_rev01_2014.doc REV. 1 March 1, 2014
ALARM LEVEL
Alarm Level Meaning Things to do
EM1 General Alarm Operational partially disruption, incipient stage-fire, no explosion or serious consequent. Loss severity is MINOR. Can be controlled internally by team.
All Emergency Response Team member must report to the CCR in where the Emergency Control Center will be consequently formed.
Non-emergency members have to stop what they are doing. Prepare themselves for the next command or other alarm.
Evacuation Team check with the ECC and prepare for evacuation, except the building on fire, shall be evacuated immediately.
Onscene Commander goes to the signaling area immediately and assesses the risk.
Report to All Managers, Supervisors via pagers. Sizing-Up, Onscene Commander has to
communicate with emergency response team member for the next strategy.
Plant/Process partially shut down
EM2 Evacuation Alarm Severe disruption to operation unit, problem seems increasing to damage customer. Loss severity is SERIOUS Call back the CCR immediately and come in for standing by Emergency Control Center.
MC call for mutual aid an or external help Non-ERT Immediately Evacuate the plant Security Guard prepare route for fire trucks Plant shut down if necessary Prepare for mutual aid coordination Prepare for media, public interested parties. All senior management have to be at the emergency
control center Emergency Control Center took over by the
Government Agency Emergency Response Team, stand by to support. Plant Totally Shut down.
All Clear Alarm Situation is under controlled. Emergency Response Operation is abort.
Emergency Response Team report to ECC for investigation and salvage plan meeting
Resume to normal situation.
ภาคผนวก ข-41 ระบบควบคมการ Shut Down
และระบบการท างานของ Relief Valve บรเวณแนวทอกาซ
ภาคผนวก ข-42
เอกสารการขนทะเบยนวศวกรควบคมและอ านวยการใชหมอน า และผควบคมประจ าหมอน า
ภาคผนวก ข-43
ระบบคอมพวเตอรควบคมอตโนมต
การควบคมและบนทกผลการท างานของหมอน า จะท าการควบคมและบนทกผลดวย
ระบบการควบคมอตโนมต (DCS: Distribution Control System) ซงการท างานของอปกรณ
ตางๆ ทใชในการเดนเครองของหมอน า จะถกควบคมตรวจสอบโดยระบบคอมพวเตอร และ
แสดงผลผานจอมอนเตอรทงหมด เชน ความดนน าปอน/ไอน า, อตราการไหลของน าปอน/ไอน า,
อณหภมน า/ไอน า,ระดบน าในหมอน า, เครองสบน าปอน หรอ วาลว เปนตน รวมถง ระบบปองกน
อนตรายอตโนมต (Interlock System) โดยอปกรณดงกลาวขางตนจะถกโปรแกรมใหท างานกน
อยางสอดคลอง รวมถงระบบปองกนอนตรายอตโนมต หากเกดเหตผดปกต และโดยขอมลการ
ท างานตางๆ จะสามารถเกบรกษาและแสดงผลยอนหลงไดมากกวา 5 ป
ตวอยางเชน
การควบคมระดบน าในหมอน า
การควบคมระดบน าในหมอน านน ระดบน าจะถกตรวจสอบโดยอปกรณวดระดบน า 3 ชด โดยคาท
ไดจะน าไปควบคมการท างานของอตราการเปดวาลวน าปอน เพอควบคมระดบน าใหไดตามทตงไว
หากเกดการท างานผดปกตไมสามารถควบคมระดบน าไดโดยมคาสงและต ากวาทตงไว ระบบ
DCS จะสงใหหยดการท างานของหมอน าโดยอตโนมต โดยหยดการท างานของเครองกงหนกาซ (Gas Turbine)
ระดบน าหมอน า
วาลวน าปอน
Level High Limit
Level Low Limit
ระบบการปองกนความดนหมอน าเกน
ระบบจะมอปกรณตรวจวดความดน 2 ตวและสงคามายงระบบ DCS โดย DCS จะตงคาลมตของ
ความดนไว หากความดนมสงถงคาทตงไว ระบบ DCS จะสงใหหยดการท างานของหมอน าโดย
อตโนมต โดยหยดการท างานของเครองกงหนกาซ (Gas Turbine) ซงจะเปนการปองกนความดน
เกนหากอปกรณลนนรภยไมท างาน ดวยอกทาง
ความดนหมอน า
ภาคผนวก ข-44 ผลการตรวจสอบคณภาพน าและไอน าจากหนวยผลตไอน า
ระหวางเดอนมกราคม-มถนายน พ.ศ. 2562
Unit Normal Std.- 9.0 - 9.5ppm ≥ 0.001ppb ≤ 7µs/cm 3.0 - 11.0ppm ≤ 10 ppm as CaCO3 Nil
Max Min Ave. Lower std. Upper Std. Min Max Ave. Lower std. Max Min Ave. Upper Std. Max Min Ave. Lower std. Upper Std. Max Min Ave. Upper Std.
Jan-19 9.40 9.15 9.28 5.80 9.50 0.001 0.02 0.01 0.001 6.50 1.73 4.12 7.00 9.60 3.02 6.31 3.00 11.00 0.00 0.00 0 10.00
Feb-19 9.50 9.10 9.30 5.80 9.50 0.001 0.01 0.01 0.001 5.92 2.37 4.15 7.00 10.57 4.23 7.40 3.00 11.00 0.00 0.00 0 10.00
Mar-19 9.44 9.10 9.27 5.80 9.50 0.001 0.02 0.01 0.001 6.74 3.25 5.00 7.00 10.31 4.43 7.37 3.00 11.00 0.00 0.00 0 10.00
Apr-19 9.45 9.13 9.29 5.80 9.50 0.001 0.01 0.00 0.001 5.72 3.02 4.37 7.00 10.61 5.31 7.96 3.00 11.00 0.00 0.00 0 10.00
May-19 9.45 9.11 9.28 5.80 9.50 0.001 0.01 0.01 0.001 5.53 2.45 3.99 7.00 10.04 3.21 6.63 3.00 11.00 0.00 0.00 0 10.00
Jun-19 9.46 9.14 9.30 5.80 9.50 0.001 0.07 0.04 0.001 5.92 2.43 4.18 7.00 10.61 5.32 7.97 3.00 11.00 0.00 0.00 0 10.00
pH Oxygen scavenger DO Conductivity
Total hardness
Month
GKP2 Boiler Feed Water Quality # HRSG11
Oxygen scavenger -Disolved Oxygen -Conductivity -
Boiler feed water qualityParameter controls RegulationpH 5.8 - 9.5
Data
Total hardness
5.60
6.10
6.60
7.10
7.60
8.10
8.60
9.10
9.60
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH #11
0.000
0.010
0.020
0.030
0.040
0.050
0.060
0.070
0.080
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Oxy
gen
scav
enge
r (pp
m)
Oxygen scavenger #11
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
DO (p
pb)
Dissolved Oxygen #11
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Cond
uctiv
ity (u
s/cm
)
Conductivity #11
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
T-ha
rdne
ss a
s CaC
O3
(ppm
)
Total Hardness #11
LSL
USL
USL
Unit Regulation Normal Std.- 8.5 - 11.8 9.0 - 11.5ppm ≤ 3,500 ≤ 400
Max Min Ave. Lower std. Upper Std. Max Min Ave. Max. Max Min Ave. Lower std. Upper Std. Max Min Ave. Max.
Jan-19 9.90 9.20 9.55 8.50 11.80 78.30 10.76 44.53 3,500.00 9.67 9.17 9.42 8.50 11.80 61.71 8.74 35.23 3,500.00
Feb-19 9.76 9.18 9.47 8.50 11.80 64.50 10.33 37.42 3,500.00 9.61 9.21 9.41 8.50 11.80 48.57 9.13 28.85 3,500.00
Mar-19 9.81 9.21 9.51 8.50 11.80 64.13 10.31 37.22 3,500.00 9.59 9.21 9.40 8.50 11.80 44.52 10.14 27.33 3,500.00
Apr-19 9.83 9.17 9.50 8.50 11.80 62.40 9.13 35.77 3,500.00 9.65 9.18 9.42 8.50 11.80 47.21 8.00 27.61 3,500.00
May-19 9.91 9.15 9.53 8.50 11.80 80.20 15.50 47.85 3,500.00 9.66 9.20 9.43 8.50 11.80 53.21 10.17 31.69 3,500.00
Jun-19 9.80 9.20 9.50 8.50 11.80 61.50 10.11 35.81 3,500.00 9.63 9.15 9.39 8.50 11.80 49.51 10.10 29.81 3,500.00
GKP2 IP & HP Drum Water Quality # HRSG11
Data
pH (HP) TDS (HP) pH (IP) TDS (IP)Month
IP & HP drum water qualityParameter controlspHTDS
8.008.408.809.209.60
10.0010.4010.8011.2011.6012.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH - HP drum #11
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
TDS
(ppm
)
TDS - HP drum #11
8.008.408.809.209.60
10.0010.4010.8011.2011.6012.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH - IP drum #11
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
TDS
(ppm
)
TDS - IP drum #11
LSL
USL
LSL
USL
Unit Normal Std.- 9.0 - 9.5us/cm 3.0 - 11.0ppb ≤ 20
Max Min Ave. Lower std. Upper Std. Max Min Ave. Upper std. Max Min Ave. Upper Std. Max Min Ave. Lower std. Upper Std. Max Min Ave. Upper std. Max Min Ave. Upper Std.
Jan-19 9.50 9.10 9.30 9.00 9.50 10.91 5.13 8.02 11.000 20.00 10.00 15.00 20.00 9.45 9.06 9.26 9.00 9.50 10.62 5.26 7.94 11.00 20.00 10.00 15 20.00
Feb-19 9.46 9.09 9.28 9.00 9.50 10.42 5.13 7.78 11.000 20.00 10.00 15.00 20.00 9.48 9.10 9.29 9.00 9.50 10.59 5.51 8.05 11.00 20.00 10.00 15 20.00
Mar-19 9.48 9.09 9.29 9.00 9.50 10.53 5.19 7.86 11.000 20.00 10.00 15.00 20.00 9.48 9.15 9.32 9.00 9.50 10.47 5.01 7.74 11.00 20.00 10.00 15 20.00
Apr-19 9.46 9.05 9.26 9.00 9.50 10.47 5.30 7.89 11.000 20.00 10.00 15.00 20.00 9.45 9.10 9.28 9.00 9.50 10.94 5.14 8.04 11.00 20.00 10.00 15 20.00
May-19 9.48 9.10 9.29 9.00 9.50 10.78 5.24 8.01 11.000 20.00 10.00 15.00 20.00 9.47 9.10 9.29 9.00 9.50 10.60 4.81 7.71 11.00 20.00 10.00 15 20.00
Jun-19 9.47 9.09 9.28 9.00 9.50 10.54 5.12 7.83 11.000 20.00 10.00 15.00 20.00 9.46 9.07 9.27 9.00 9.50 10.47 5.40 7.94 11.00 20.00 10.00 15 20.00
Month
Data
pH #HP steam Conductivity #HP steam Corrosion Iron Content #HP steam pH #IP steam Ccnductivity #IP steam Corrosion Iron Content #IP steam
Conductivity -Corrosion Iron Content -
GKP2 Superheated Steam Water Quality # HRSG 11
Boiler feed water qualityParameter controls RegulationpH -
8.60
9.10
9.60
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH #HP Steam 11
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Cond
uctiv
ity (
us/c
m)
Conductivity #HP Steam 11
0.00
5.00
10.00
15.00
20.00
25.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Corr
osio
n iro
n co
nten
t (pp
b)
Iron content # HP Steam 11
8.10
8.60
9.10
9.60
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH #IP Steam 11
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Cond
uctiv
ity (
us/c
m)
Conductivity #IP Steam 11
0.00
5.00
10.00
15.00
20.00
25.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Corr
osio
n iro
n co
nten
t (pp
b)
Iron content # IP Steam 11
Unit Internal Std.- 9.0 - 9.5ppm ≥ 0.001ppb ≤ 7µs/cm 3.0 - 11.0ppm Nil
Max Min Ave. Lower std. Upper Std. Min Max Ave. Lower std. Max Min Ave. Upper Std. Max Min Ave. Lower std. Upper Std. Max Min Ave. Upper Std.
Jan-19 9.50 9.11 9.31 5.80 9.50 0.001 0.12 0.06 0.001 6.93 2.54 4.74 7.00 9.98 5.12 7.55 3.00 11.00 0.00 0.00 0 10.00
Feb-19 9.49 9.13 9.31 5.80 9.50 0.001 0.04 0.02 0.001 5.96 3.16 4.56 7.00 10.62 5.64 8.13 3.00 11.00 0.00 0.00 0 10.00
Mar-19 9.45 9.15 9.30 5.80 9.50 0.001 0.02 0.01 0.001 6.83 2.63 4.73 7.00 10.13 5.43 7.78 3.00 11.00 0.00 0.00 0 10.00
Apr-19 9.47 9.10 9.29 5.80 9.50 0.001 0.01 0.00 0.001 6.53 1.94 4.24 7.00 10.72 5.12 7.92 3.00 11.00 0.00 0.00 0 10.00
May-19 9.45 9.11 9.28 5.80 9.50 0.001 0.01 0.01 0.001 6.75 2.56 4.66 7.00 10.21 4.31 7.26 3.00 11.00 0.00 0.00 0 10.00
Jun-19 9.48 9.20 9.34 5.80 9.50 0.001 0.01 0.00 0.001 6.20 2.06 4.13 7.00 10.55 5.16 7.86 3.00 11.00 0.00 0.00 0 10.00
pH Oxygen scavenger DO Conductivity Total hardness
Total hardness ≤ 10 ppm as CaCO3
GKP2 Boiler Feed Water Quality # HRSG 12
Month
Oxygen scavenger -Disolved Oxygen -Conductivity -
Boiler feed water qualityParameter controls RegulationpH 5.8 - 9.5
Data
5.60
6.10
6.60
7.10
7.60
8.10
8.60
9.10
9.60
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH #12
0.000
0.020
0.040
0.060
0.080
0.100
0.120
0.140
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Oxy
gen
scav
enge
r (pp
m)
Oxygen scavenger #12
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
DO (p
pb)
Dissolved Oxygen #12
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Cond
uctiv
ity (u
s/cm
)
Conductivity #12
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
T-ha
rdne
ss a
s CaC
O3
(ppm
)
Total Hardness #12
LSL
USL
USL
Unit Regulation Normal Std.- 8.5 - 11.8 9.0 - 11.5ppm ≤ 3,500 ≤ 400
Max Min Ave. Lower std. Upper Std. Max Min Ave. Max. Max Min Ave. Lower std. Upper Std. Max Min Ave. Max.
Jan-19 9.82 9.18 9.50 8.50 11.80 59.20 9.53 34.37 3,500.00 9.51 9.08 9.30 8.50 11.80 40.77 6.98 23.88 3,500.00
Feb-19 9.76 9.18 9.47 8.50 11.80 64.50 10.33 37.42 3,500.00 9.61 9.21 9.41 8.50 11.80 48.57 9.13 28.85 3,500.00
Mar-19 9.75 9.16 9.46 8.50 11.80 66.72 10.26 38.49 3,500.00 9.60 9.17 9.39 8.50 11.80 50.10 9.39 29.75 3,500.00
Apr-19 9.80 9.20 9.50 8.50 11.80 61.50 10.11 35.81 3,500.00 9.63 9.15 9.39 8.50 11.80 49.51 10.10 29.81 3,500.00
May-19 9.88 9.18 9.53 8.50 11.80 61.51 9.73 35.62 3,500.00 9.61 9.21 9.41 8.50 11.80 43.22 9.84 26.53 3,500.00
Jun-19 9.81 9.16 9.49 8.50 11.80 64.13 11.23 37.68 3,500.00 9.81 9.17 9.49 8.50 11.80 45.63 9.90 27.77 3,500.00
GKP2 IP & HP Drum Water Quality # HRSG12
Data
pH (HP) TDS (HP) pH (IP) TDS (IP)Month
IP & HP drum water qualityParameter controlspHTDS
8.008.408.809.209.60
10.0010.4010.8011.2011.6012.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH - HP drum #12
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
TDS
(ppm
)
TDS - HP drum #12
8.008.408.809.209.60
10.0010.4010.8011.2011.6012.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH - IP drum #12
0.00
10.00
20.00
30.00
40.00
50.00
60.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
TDS
(ppm
)
TDS - IP drum #12
LSL
USL
LSL
USL
Unit Normal Std.- 9.0 - 9.5us/cm 3.0 - 11.0ppb ≤ 20
Max Min Ave. Lower std. Upper Std. Max Min Ave. Upper std. Max Min Ave. Upper Std. Max Min Ave. Lower std. Upper Std. Max Min Ave. Upper std. Max Min Ave. Upper Std.
Jan-19 9.48 9.10 9.29 9.00 9.50 10.62 5.26 7.94 11.000 20.00 10.00 15.00 20.00 9.46 9.16 9.31 9.00 9.50 10.32 4.93 7.63 11.00 20.00 10.00 15 20.00
Feb-19 9.46 9.11 9.29 9.00 9.50 9.99 5.30 7.65 11.000 20.00 10.00 15.00 20.00 9.42 9.20 9.31 9.00 9.50 9.71 5.71 7.71 11.00 20.00 10.00 15 20.00
Mar-19 9.48 9.09 9.29 9.00 9.50 10.53 5.19 7.86 11.000 20.00 10.00 15.00 20.00 9.48 9.15 9.32 9.00 9.50 10.47 5.01 7.74 11.00 20.00 10.00 15 20.00
Apr-19 9.47 9.10 9.29 9.00 9.50 10.60 5.43 8.02 11.000 20.00 10.00 15.00 20.00 9.47 9.15 9.31 9.00 9.50 10.63 5.06 7.85 11.00 20.00 10.00 15 20.00
May-19 9.50 9.08 9.29 9.00 9.50 10.42 5.16 7.79 11.000 20.00 10.00 15.00 20.00 9.50 9.14 9.32 9.00 9.50 10.53 5.11 7.82 11.00 20.00 10.00 15 20.00
Jun-19 9.45 9.13 9.29 9.00 9.50 10.54 5.14 7.84 11.000 20.00 10.00 15.00 20.00 9.48 9.21 9.35 9.00 9.50 10.51 5.20 7.86 11.00 20.00 10.00 15 20.00
Month
Data
pH #HP steam Ccnductivity #HP steam Corrosion Iron Content #HP steam pH #IP steam Ccnductivity #IP steam Corrosion Iron Content #IP steam
Conductivity -Corrosion Iron Content -
GKP2 Superheated Steam Water Quality # HRSG 12
Boiler feed water qualityParameter controls RegulationpH -
8.60
9.10
9.60
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH #HP Steam 12
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Cond
uctiv
ity (
us/c
m)
Conductivity #HP Steam 12
0.00
5.00
10.00
15.00
20.00
25.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Corr
osio
n iro
n co
nten
t (pp
b)
Iron content # HP Steam 12
8.10
8.60
9.10
9.60
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
pH
pH #IP Steam 12
0.00
2.00
4.00
6.00
8.00
10.00
12.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Cond
uctiv
ity (
us/c
m)
Conductivity #IP Steam 12
0.00
5.00
10.00
15.00
20.00
25.00
Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19
Corr
osio
n iro
n co
nten
t (pp
b)
Iron content # IP Steam 12
ภาคผนวก ข-45 เอกสารรบรองความปลอดภยในการใชหมอไอน า
ภาคผนวก ข-46 แผนการซอมแผนฉกเฉน ประจ าป 2562
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec123456789
10111213141516171819202122
23
24
25
26272829
3031
32333435363738394041
42
434445
รายงานการตรวจสอบ ควบคม กากบดแลการทางานของระบบการจดการมลพษกากอตสาหกรรม
ใบอนญาตใหนาสงปฏกลหรอวสดไมใชแลวออกนอกโรงงาน
สงรายงาน รว.1(รายละเอยดทวไป) รว.2(รายงานมลพษนา) รว.3(รายงานมลพษอากาศ) ทก 6 เดอน
เกบตวอยางอากาศ อยางนอย 1 ครง/6 เดอน (ตรวจวด NOx เปนอยางนอย หรอตามทกาหนดใน EIA)
จดทาบญชระบปรมาณของเสยอนตราย ทก 30 วน
ตรวจสอบสถานทจดเกบของเสยอนตรายทกสปดาห
แจงรายละเอยดเกยวกบสงปฏกลและวสดไมใชแลว ตามแบบ รง.6 ตอกรมโรงงานภายใน 90 วน นบแตวนทเรมประกอบกจการโรงงาน และตองแจงรายละเอยดครงตอไป 1 ครง/ป
สงรายงานการกาจดสงปฎกลและวสดทไมใชแลวประจาป-นคมหนองแค
ทบทวน (Update) ทะเบยนกฎหมายสงแวดลอมและขอกาหนดทเกยวของ
ทบทวนความสอดคลองกบฎหมายสงแวดลอมและขอกาหนดทเกยวของ
ทบทวน Aspect และทะเบยน Aspect
สงรายงาน สก.3 ไมเกนเดอน มนาคม ของทกป
เกบตวอยางนา อยางนอย 1 ครง/เดอน (ตรวจวด BOD5, COD, pH, SS เปนอยางนอย หรอตามทกาหนดใน EIA)
การตรวจดานความปลอดภยและเครองมอวด
ตรวจอปกรณปองกนและระงบอคคภยตามแผนทตงไว
การสอบเทยบเครองมอวด + Gas Detector
สงแวดลอม
คนหากฎหมายสงแวดลอมและขอกาหนดทเกยวของทมเพมเตม
ตรวจสอบหมอนา โดยวศวกรตรวจทดสอบหรอหนวยรบรองวศวกรรมดานหมอนา อยางนอยปละ 1 ครง
ตรวจสอบคณภาพของของเหลวทใชเปนสอนาความรอน ทก 6 เดอน
จดทารายงานสรปเปรยบเทยบคณสมบตของนาปอนและนาภายในหมอนา, รายงานการตรวจสอบภายนอกหมอนาและระบบการทางาน ตามแบบ สภ.1-28, รายงานการบารงรกษาหมอนาเชงปองกน และแผนการฝกอบรมผควบคมหมอนา สงสานกเทคโนโลยความปลอดภย 1 ครง/ป
จดทารายงานผลการปฏบตงานในการควบคมหมอไอนา โดยมวศวกรควบคมและอานวยการใชหมอไอนารบรอง สงใหกรมโรงงานฯ
จดสงเอกสารรายงานผลการตรวจทดสอบความปลอดภยหมอไอนา และเอกสารรบรองความปลอดภยในการใชหมอนาหรอหมอตม ใหกรมโรงงานฯ ภายใน 30 วน นบแตวนทเสรจสนการตรวจสอบ
จดทารายงานผลการฝกซอมดบเพลง สงกรมสวสดการและคมครองแรงงานจงหวด 1 ครง/ป
อบรมหลกสตรการปฐมพยาบาลอยางนอย 1 ครง/ป
การตรวจสขภาพพนกงานทปฏบตงานเกยวกบวตถมพษ วตถเคม วตถไวไฟ วตถระเบด อยางนอย 1 ครง/ป
ตรวจสขภาพลกจางอยางนอย 1 ครง/ป
ทบทวนแตงตงหรอเลอกตงคณะกรรมการความปลอดภยฯ
ประชมและตรวจความปลอดภยโดยคณะกรรมการความปลอดภยฯ เดอนละ 1 ครง
ทบทวนประกาศแตงตงผอนญาต, ผควบคมงาน, ผชวยเหลอ, ผปฏบตงานในการทางานในทอบอากาศ
ตรวจสอบหมอนาโดยผอานวยการใชหมอนา
จดทารายงานยทธภณฑ (ยภ.8)
ทบทวนรายการสารเคมอนตราย
ตรวจสขภาพลกจางททางานเกยวกบสารเคมอนตราย (สอ.4) - เปลยนเปน จผส.
ตรวจสอบระบบไฟฟาในโรงงานและรบรองความปลอดภยของระบบไฟฟาเปนประจาทกป โดยวศวกร
แจง สนง.อตสาหกรรมจงหวดลวงหนาเมอจะมการตรวจหมอไอนาโดยบอกวน/เวลา
ตรวจตามเอกสารรบรองความปลอดภยในการใชหมอไอนา ถายนขอตออาย เปน 3 ปหรอ 5ป ใหเอาขอกาหนดทตองทาใสไวในแผน
สงใบแจงขอเทจจรงของผผลต ผนาเขา ผสงออกหรอผมไวในครอบครองซงวตถอนตรายในความรบผดชอบของกรมโรงงานอตสาหกรรม (วอ/อก.7, 7.1, 7.2)
ตรวจวดสภาวะแวดลอมในการทางาน (ความรอน, เสยง, แสงสวาง)
ตรวจสขภาพของลกจางททางานในสภาวะการทางานทอาจไดรบอนตรายจากความรอน แสงสวาง หรอเสยง
ซอมแผนฉกเฉน (เพลงไหม)
ซอมแผนฉกเฉน (อทกภย, วนาศกรรมและเหตจราจล, แผนดนไหว, โรคระบาด)
สงแบบแจงรายละเอยดของสารเคมอนตรายในสถานประกอบการ (สอ.1) - ถามเพมเตม
ตรวจวดปรมาณความเขมขนของสารเคมอนตรายในบรรยากาศบรเวณสถานททางานและสถานทเกบสารเคมอนตราย (สอ.3)
GKP1 & GKP2 EHS ACTION PLAN 2019
Item Plan2019
ตรวจสอบสวนประกอบและอปกรณของปนจนชนดอยกบท/และปนจนชนดเคลอนท (แบบฟอรม จป.1, 2)
สงรายงานการดาเนนงานของ จป.วชาชพ (จป.(ว))
ซอมแผนฉกเฉน (กาซรวไหล, นามนรวไหล, สารเคมรวไหล, หมอไอนาระเบด)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
4647484950515253545556575859606162636465
66
6768
69
70
71727374757677
กอนเขาทางาน
ตรวจคณภาพนาและไอนา ทก 4 ชวโมง (ไอนา ตรวจ pH, Conductivity, Corrosion Iron Content และนาสาหรบเตมใน HRSG ตรวจ pH, Oxygen Scavenger Reserve, Dissolved Oxygen,Conductivity)
ตรวจสอบการทางานอปกรณปองกน อยางนอยทกสปดาห (PPE, ฝกบวและทลางตา, ไฟแสงสวางฉกเฉน, อปกรณเตอนภยและดบเพลง)
จดซอมแผนดบเพลงฉกเฉนรวมกบหนวยงานทองถน และโรงงานใกลเคยง
กจกรรมเยาวชนอนรกษสงแวดลอม
กจกรรมสปดาหความปลอดภย
จดทารายงานผลการปฏบตตามแผนปฏบตการดานสงแวดลอม สงหนวยงานราชการทก 6 เดอน
ตรวจวดคณภาพอากาศในบรรยากาศ ปละ 2 ครง ( SO2, NO2, TSP, PM-10, ความเรวและทศทางลม)
ตรวจวดคณภาพอากาศแบบตอเนอง (NOx, O2)
กจกรรมปลกตนไม
ตดตามภาวะสขภาพของประชาชน ปละ 1 ครง
ประชมคณะกรรมการตรวจสอบผลกระทบสงแวดลอมของโรงไฟฟาโคกแย1 และโรงไฟฟาโคกแย2
จดทาแผนการตรวจสอบสารเคมอนตรายในพนทกระบวนการผลตนาปราศจากแรธาต และหองปฏบตการสารเคม พรอมทงทบทวนและปรบปรงแผน อยางนอยปละ 1 ครง
จดฝกอบรมเกยวกบสารเคม เปนประจาทกป
2019PlanItem
ตรวจความถกตองของ CEMs ปละ 1 ครง (NOx, O2)
GKP1 & GKP2 EHS ACTION PLAN 2019
จดทาขอมลความปลอดภย (SDS)
แจงรายชอสารเคมอนตราย สงรายงานความปลอดภยและการประเมนการกออนตรายจากสารเคม อยางนอยปละ 1 ครง
แจงรายละเอยดเกยวกบสารเคมอนตราย ตามแบบรายงานการตรวจวดปรมาณความเขมขนของสารเคมอนตรายในบรรยากาศบรเวณสถานททางานและสถานทเกบสารเคม
อบรมลกจางเรองการเกบรกษา อนตรายทจะเกดขน วธการควบคมและปองกน วธการอพยพ/เคลอนยาย
ตรวจสขภาพพเศษ สาหรบพนกงานประจา ปละ 1 ครง
จดการประชมสรปปญหา เสนอขอแนะนา และปรบปรงคมอความปลอดภยและแผนฉกเฉน
ตรวจอปกรณปองกนไฟไหม อยางนอย 1 ครง/สปดาห
ประเมนผลการซอมแผนฉกเฉน
จดทา Noise Contour บรเวณกระบวนการผลตไฟฟาทมเสยงดง ทก 5 ป
ตรวจวดความรอน (WBGT) ปละ 4 ครง
ตรวจวดระดบความเขมของแสงสวาง ปละ 4 ครง
ตรวจสขภาพกอนเขาทางาน สาหรบพนกงานใหม
ตรวจสขภาพทวไป สาหรบพนกงานประจา ปละ 1 ครง
ตรวจวดแบบครงคราว (SO2, NOx, PM, O2) ปละ 2 ครง ชวงเวลาเดยวกบตรวจวดคณภาพอากาศในบรรยากาศ
ตรวจวดเสยง ปละ 2 ครง (Leq24, Ldn, L90)
ตรวจวดนาเสย เดอนละ 1 ครง (Temp., pH, TDS, SS, Oil and Grease, Free Chlorine)
บนทกขอมลกากของเสย ทงชนด ปรมาณ การรวบรวม การเกบกก และการขนสง เดอนละ 1 ครง
ตรวจวดเสยง (Leq8) บรเวณกระบวนการผลตไฟฟา ปละ 4 ครง
มาตรการ EIA
ภาคผนวก ข-47 หนงสอแตงตงคณะกรรมการดานความปลอดภย อาชวอนามย และสงแวดลอมในการท างาน