18-ए, शहीद जीत सह माग , कटवारिया िाय, नई ददली- 110016 फोन:011-26868681, 26967842 फे : 011-26865206 ई-मेल: [email protected]वेबाईट: www.nrpc.gov.in 18-A, S. Jeet Singh Marg, Katwaria Sarai, New Delhi-110016 Phone: 011-26868681, 26967842 Fax: 011-26865206 e- mail: [email protected] Website: www.nrpc.gov.in भाित िकाि Government of India ववुत मालय Ministry of Power उि ेीय ववुत वमवत Northern Regional Power Committee . उेवव/वाविवययक/201/े.ऊ.ले./2020/ ददनाक: 16 ददबि, 2020 No. NRPC/Comml/201/ REA/ 2020/ Dated: 16 th December, 2020 ेवाम, To, ल ूची के अनुाि As per list enclosed ववषय : माह माचग , 2020 के अवतम ेीय ऊजाग लेखा म शोधन-1 । Subject – Amendment-1 in Final REA for the month of March, 2020. महोदय/Sir, This is in reference to Final REA for the month of March 2020 issued by this office vide letter number NRPC/Comml/201/ REA/ 2020/ 10436-10474 dated 03 rd November 2020. NTPC vide their email dated 10-11-2020, intimated the discrepancy in “Energy Requisition Details from NR Stations below 85% of Entitlement ” (Table-O1) and in Compensation calculation amount w.r.t. Dadri-II station to Andhra Pradesh. The discrepancies have now been corrected. The amended pages of the REA containing the above mentioned calculation are enclosed herewith (copy available on www.nrpc.gov.in). अनुलक – यथोपरि । भवदीय Encl.: As above. Yours faithfully, (आि. पी. धान) (R.P. Pradhan) अधीि अवभयता Superintending Engineer
8
Embed
िकाि Government of India Ministry of Power त्ति ...164.100.60.165/Comm/2019-20/REA/REA_0320_FR1.pdf · 2020. 12. 16. · 18-ए, शह द जत स िंह मार्ग,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
TOTAL UNCHAHAR-III TPS 3838.279606 4263.629354 425.349748
UNCHAHAR-IV TPS
HARYANA 525.077074 578.920251 53.843177
RAJASTHAN 2806.940704 3085.250547 278.309843
UTTARAKHAND 421.695900 485.630333 63.934433
UTTAR PRADESH 4174.063628 4808.929249 634.865621
TOTAL UNCHAHAR-IV TPS 7927.777306 8958.730380 1030.953074
Amendment-1
4
Northern Regional Power CommitteeCompensation Calculation
Calculation period from 01-4-2019 to 31-3-2020 (All Figs in Rs. Lakh Payable(+)/Recievable(-))
Station State Compensation during the
month
Compensation for the
calculation period
DADRI TPS
DELHI 116.29407 2234.46509
UTTAR PRADESH 18.60914 198.27380
VIRTUAL ENTITY(SCED) -32.65471 287.07106
TOTAL DADRI TPS 102.24850 2719.80995
DADRI-II TPS
ANDHRA PRADESH -4.54630 94.93339
CHANDIGARH 0.24188 0.24188
DELHI 215.40921 2164.78686
M.P. 1.51111 7.24610
PUNJAB 0.77573 36.33512
PG-KURUKSHETRA 2.13961 34.39540
RAJASTHAN 26.69685 579.17140
UTTARAKHAND 0.93894 2.38581
UTTAR PRADESH 68.35653 747.92498
VIRTUAL ENTITY(SCED) -23.99703 1130.52407
TOTAL DADRI-II TPS 287.52653 4797.94501
IGSTPS-JHAJJAR
CHANDIGARH 4.84792 79.01081
DELHI 470.08616 5617.77225
HARYANA 162.78767 2737.04602
J & K 36.82289 91.41548
UTTARAKHAND 7.72015 129.83046
UTTAR PRADESH 11.26203 55.28628
VIRTUAL ENTITY(SCED) 28.39543 461.98121
TOTAL IGSTPS-JHAJJAR 721.92225 9172.34251
TANDA-II STPS
HARYANA 106.83927 106.83927
RAJASTHAN 24.02498 24.02498
UTTAR PRADESH 586.28454 586.28454
TOTAL TANDA-II STPS 717.14879 717.14879
Amendment-1
5
Northern Regional Power CommitteeCompensation Calculation
Calculation period from 01-4-2019 to 31-3-2020 (All Figs in Rs. Lakh Payable(+)/Recievable(-))
Station State Compensation during the
month
Compensation for the
calculation period
UNCHAHAR-I TPS
DELHI 11.27379 88.08816
HARYANA 9.43536 36.40734
PUNJAB 23.00771 180.07694
RAJASTHAN 14.52666 266.06312
UTTARAKHAND 25.83377 156.78688
UTTAR PRADESH 159.98222 2093.98522
VIRTUAL ENTITY(SCED) -30.40181 450.96369
TOTAL UNCHAHAR-I TPS 213.65770 3272.37135
UNCHAHAR-II TPS
CHANDIGARH 2.60226 6.43554
DELHI 26.59216 150.35538
HARYANA 12.40913 108.38433
PUNJAB 55.05072 349.91035
RAJASTHAN 89.02110 639.27489
UTTARAKHAND 11.68936 45.05845
UTTAR PRADESH 185.30387 1044.48863
VIRTUAL ENTITY(SCED) 41.54755 451.26747
TOTAL UNCHAHAR-II TPS 424.21615 2795.17504
UNCHAHAR-III TPS
DELHI 15.94529 105.56864
HARYANA 11.07371 81.74878
PUNJAB 12.27645 94.11374
RAJASTHAN 50.56288 455.90067
UTTARAKHAND 11.97151 81.65203
UTTAR PRADESH 88.05995 554.11703
VIRTUAL ENTITY(SCED) 11.73857 140.01728
TOTAL UNCHAHAR-III TPS 201.62836 1513.11817
UNCHAHAR-IV TPS
HARYANA 26.01793 189.79961
RAJASTHAN 135.96361 1011.50260
UTTARAKHAND 27.67932 159.21441
UTTAR PRADESH 274.64143 1576.61245
TOTAL UNCHAHAR-IV TPS 464.30229 2937.12907
Amendment-1
6
Northern Regional Power Committee Compensation Calculation
Calculation period from 01-4-2019 to 31-3-2020 ECR & Cumulative Energy Report
ECR (SE): Energy Charge Rate in rupees/kWh based on degraded SHR and AEC as per regulation considering average unit loading of generating station during the calculation period
ECR (DC): Energy Charge Rate in rupees/kWh based on degraded SHR and AEC as per regulation considering average declared capacity as average unit loading during the calculation period
ECR (A): Energy Charge Rate in rupees/kWh based on actual parameters SHR and AEC during the calculation period
ECR (N): Energy Charge Rate in rupees/kWh based on normative parameters of SHR and AEC during the calculation period